B05 Amendment 3.pdf

PDF 189 KB Posted

Attached to
Rosebud Heating Plant Replacement Federal contract opportunity
Solicitation number
75H70124R00024
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document is an amendment to a solicitation for a construction project to remove and replace the heating system at the Rosebud Comprehensive Health Care Facility in Rosebud, South Dakota. The key details are:

The amendment incorporates a revised price schedule, adds FAR clause 52.217-7 for an option to increase quantities, and includes responses to 28 requests for information. The offer due date has been changed to 12:00pm Central Time on 6/25/2024. The project will be procured as a 100% Small Business set-aside under NAICS code 236220, with a size standard of $45 million. The contract type is Firm Fixed Price, and the evaluation method is Lowest Price Technically Acceptable. The project duration is 365 calendar days. The government estimates the construction magnitude to be between $1,000,000 and $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Rosebud Heating Plant Replacement, newest first.
File Type Posted
B05 Amendment 4.pdf PDF
B05 Amendment 3 Attachment 1 RFI Response 1-28.pdf PDF
B05 Amendment 2.pdf PDF
B05 Amendment 1.pdf PDF
Attachment 3 Drawings 23.02.09.pdf PDF
Attachment 4 WH347 PAYROLL.pdf PDF
Attachment 5 Release of Claims.pdf PDF
Attachment 1 Wage Determination SD20240018.pdf PDF
Attachment 8 Past Performance Questionnaire.docx DOCX document
Attachment 2 Specifications 23.02.09.pdf PDF
Attachment 7 Specialized Experience Construction Form.docx DOCX document
Attachment 6 Subcontracting Plan.pdf PDF
B01 24R00024 v3.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00003

Thupten Tsering, Contracting Officer

The purpose of amendment 3 to solicitation 75H70124R00024 is the following:

1. Incorporate revised Section B.1 Price Schedule.

2. Incorporate FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item (MAR 1989).

3. Incorporate RFI response 1-28 with supporting documents (see attachment 1).

4. Change the offer due date to 12:00pm Central Time on 6/25/2024.

5. All other terms and conditions remain unchanged, see SF30 continuation page.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

See Item 6

75H70124R00024

GP22RB400H10

1 2

06/17/2024

04/24/2024

SF30 Continuation Page 2

B.1. PRICE SCHEDULE (Offeror fill-in)

CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

The contractor shall provide all labor, materials, supplies, and services to complete work for project GP22RB400H10 Rosebud Heating Plant Replacement in accordance with the SOW, specifications, drawings, and other documents incorporated into this contract, excluding option 1.

1 LS

Option 1: All work under drawings P301, P302, P303, P304 to replace existing mixing valve with a TMV-2 sized to match the existing pipe. Reference RFI 5.

1 LS

Total Price

KEY: LS = Lump Sum

FAR 52.217-7 OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEM. OPTION FOR INCREASED QUANTITY-

SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 CALENDAR DAYS. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

Attachments:

Attachment 1: Amendment 3 RFI Response 1-28 and Supporting Documents

B05 Amendment 3
SF30 Continuation Page