Attachment 7 -RFI Master List and Answers.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- FA25179092026
About this file
This file is a Request for Information (RFI) Master List and Answers document that provides clarifications and responses to vendor questions regarding the installation of an AMAG Symmetry System OR Equal Intrusion Detection System in Building 2025 at Peterson Space Force Base, Colorado. The RFI addresses technical specifications, installation requirements, compliance standards, and procurement details relevant to the intrusion detection system deployment across multiple rooms (Room 160, Room 163, and Room 120) within the facility.
The document serves as a clarification tool for potential bidders on the 100% small business set-aside solicitation, helping vendors understand government requirements and expectations prior to submission of quotes. Key topics covered in the RFI responses include system compatibility standards, wiring and infrastructure specifications, integration requirements with existing alarm panel systems, compliance with applicable federal and military standards, and installation timelines. This attachment is essential reference material for contractors preparing proposals in response to Amendment 2 and 3 of solicitation FA25179092026, as it provides authoritative guidance on technical and administrative requirements that vendors must address in their pricing and implementation plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Request for Information Master List B2025 Installation of Intrusion Detection System(IDS) and peripherals in Rooms 160 and 163
| Question # | Date Received: | Date Sent to Customer: | Question: | Customer Answer: | CONS Answer: |
| 1 | 03-Sepember-2026 | 08-Sepember-2026 | Could a walkthrough be accommodated? If so, please provide the available date and time options, required attendee information or forms, and any security or facility-access requirements. | Unfortunately, since we are approaching end of year, we do not have time to hold a site visit. | |
| 2 | 08-Sepember-2026 | 08-Sepember-2026 | UL 2050 certification and certificate holder |
Reference: SOW §2, Governing Directives and Compliance
| Section 2 requires that all work be performed in accordance with UL 2050, Standard for National Industrial Security Systems. UL 2050 certification is issued by UL through a UL-listed alarm service company holding the CRZH designation, and it covers a specific system at a specific facility. It is not a certification of the room, and the installing contractor cannot satisfy it without holding the listing. ESI does not hold it. Please confirm in writing which firm in the proposed contracting chain carries the UL 2050 CRZH listing and will issue the certificate for Building 2025. If the position is that the Government has waived a contractor-issued certificate for this effort, we require that in writing from the contracting officer. | No | ||||
| 3 | 08-Sepember-2026 | 08-Sepember-2026 | DD Form 254, facility clearance and personnel security |
Reference: SOW §4 and §7.3
| Section 4 states that personnel performing work "will not require special or higher certifications than standard personnel security clearances." Section 7.3 states the Government will provide escorts as required. Those two statements point in opposite directions. If cleared personnel are required, the installing company needs a Facility Clearance sponsored through a DD Form 254 and individual technicians need active clearances. If escorted uncleared technicians are acceptable, that needs to be stated plainly. Please provide the DD Form 254 for this effort, or confirm in writing that no facility clearance is required and that escorted uncleared personnel may perform the installation. | DD 254s are not required, escorts will be provided by the Gov’t, when required. | ||||
| 4 | 08-Sepember-2026 | 08-Sepember-2026 | Governing platform language — AMAG Symmetry |
Reference: SOW §3.1, System Platform and Integration
| Section 3.1 states that the new IDS "must be built upon the AMAG Symmetry platform." Please confirm that the Government requires AMAG Symmetry as a sole platform and will not accept substitutions. If equivalents are in fact acceptable, please confirm what the Government will accept as proof of full compatibility with the existing base access control system and the 21 SFS monitoring platform, and confirm that every bidder has been given the same instruction. A bidder pricing an equivalent against a sole-platform requirement will produce a low number that is not responsive. | This project is a connection to the existing installation AMAG system, connectivity compatibility to the current system is the primay objective to meet the project requirements and intent. Upon completion of connectivity, positive testing of system, would be proof of concept and compatibility | ||||
| 5 | 08-Sepember-2026 | 08-Sepember-2026 | Contract status, solicitation number and quote deadline |
Reference: Not addressed in the SOW or attachments
| Please confirm your firm’s position on this requirement: whether you hold an award, are preparing a bid, or are gathering market pricing. If it has not been awarded, please provide the solicitation number, the Government proposal due date, the NAICS code and any set-aside status, and state the deadline by which you need our pricing. No quote deadline accompanied the package we received. | FA251726QA040 is in the Combined Synopsis Soliciation Attachment along with the all the other information like the NAICS, Small business set aside and quote due date, which got extended to 14 Septemeber on Amendment 2 of the Soliciatiation. | |||
| 6 | 08-Sepember-2026 | 08-Sepember-2026 | Wage determination |
Reference: Not addressed in the SOW or attachments
| Please identify the applicable wage determination for this on-installation work — Davis-Bacon Act or Service Contract Act — and provide the determination number. Labor is the majority of this project and it cannot be priced without knowing which applies. | Wage Determination is in Attachment 6 - Wage Determination Under The Service Contract Act, this is a service requirement, not construction. | |||
| 7 | 08-Sepember-2026 | 08-Sepember-2026 | Room 163 device schedule |
Reference: SOW §5.1; Attachment 3, Room 163 IDS System Section 5.1 lists only a Javelin arm/disarm reader, a local 120V power supply and conduit runs for Room 163. Attachment 3 additionally shows an intrusion detection sensor and a magnetic door sensor. Attachment 3 also shows Rooms 163B and 163C as separate enclosed spaces with their own doors, plus a conference area, with a single sensor near the north entry. One 360-degree ceiling detector will not cover that geometry. Please confirm the complete Room 163 device schedule, and confirm whether Rooms 163B and 163C fall inside the CPA/ICA boundary and therefore require their own motion coverage and balanced magnetic switches. Rm 163 – Rooms 163B and Room 163C do not required separate IDS installation, they fall within the boundaries of Room 163. Rm 163 and Rm160 IDS Equipment list: Equipment List for both Room 163 and 160.
• System Controllers: Install core system components, including AMAG M2150 series controllers, network interface cards (e.g., MN-NIC5-ENC), and auxiliary output boards within a secure enclosure (e.g., MN-CAB3A).
• Door Protection: Install a high-security, triple-balanced magnetic contact (e.g., Magnasphere HSS-L2D-000 or equivalent) on the main entry door to monitor for unauthorized entry.
• Motion Detection: Install a sufficient number of dual-technology motion sensors (e.g., Optex SX-360Z PIR or equivalent) to provide complete, overlapping coverage of the entire space. The proposed sensor layout must be approved by the government security representative prior to installation.
• Reader and Disarm: Install an Arm/Disarm reader (e.g., AMAG 880-KP Javelin) to manage the IDS state.
• System Integration: Ensure the existing ACS functionality, including the "door ajar" alarm, is integrated and fully functional with the new IDS.
• Alarm Control Panel and Power: The system shall be powered by a dedicated power supply (e.g., Altronix AL600ULXB) and be backed up by a UPS that provides a minimum of 24 hours of backup power.
Alarm Monitoring: The IDS must be configured to report all alarm conditions (including unauthorized entry, motion detection, and tamper alerts) to the existing Peterson SFB base alarm system, which is monitored by the 21st Security Forces Squadron (21 SFS).
8 08-Sepember-2026 08-Sepember-2026 Room 163 controller, enclosure and intrusion licensing
Reference: SOW §4.1 and §5.1
| The core component list in §4.1 places one M2150 controller stack, one MN-CAB3A enclosure and one Symmetry Intrusion license in Room 160. No controller, board, enclosure or intrusion license appears anywhere in the Room 163 scope, and Symmetry Intrusion licensing is purchased per door controller. Please confirm whether Room 163 devices home-run to the Room 160 controller or require a dedicated controller, enclosure and license. If they home-run, please confirm the available pathway and approximate cable distance. | Rm 163 will require one M2150 controller stack, on MN-CAB3A and associated Symmetry Intrusion license. Rm 163 and 160 are separate CPA/secure areas. | ||||
| 9 | 08-Sepember-2026 | 08-Sepember-2026 | Room 120 switch and alarm panel scope |
Reference: SOW §5.1, Room 120 Network Switch Upgrade; Attachment 5
| Section 5.1 states the existing switches will "possibly" be replaced with larger capacity to reduce daisy chaining. No switch make, model or port count is given, and no alarm panel make or model is given. Attachment 5 shows one new panel beside two existing panels. Please confirm the required switch make, model and port count; the alarm panel make and model; the disposition of the two existing panels; and the spare alarm point capacity required for future expansion. | All field alarm devices operate on independent home-run wiring. Room 120 network infrastructure shall be upgraded by replacing existing cascaded switches with a single 24-Port Managed PoE+ switch. The alarm panel shall standardize on an AMAG M2150 stack with 20% spare capacity reporting to 21 SFS, with the two decommissioned legacy panels turned over to 21 SFS. | ||||
| 10 | 08-Sepember-2026 | 08-Sepember-2026 | Cable pathway length and site walk |
Reference: SOW §4.1, Power and Infrastructure; Attachment 4
| Section 4.1 allows 100 feet of multimode 6-strand optical fiber. The pathway indicated on Attachment 4 runs from the Room 160/163 area in the north wing to Room 120 near the loading dock, which scales to several hundred feet. Please confirm the intended routing, any existing conduit or cable tray along it, and the actual required cable length. We request an escorted site walk before pricing. This is the single largest cost variable in the project and it cannot be resolved from the drawings. | Based on routing from Room 160/163 to Rm 120 connection point, approx. distance will be about 250 ft. | ||||
| 11 | 08-Sepember-2026 | 08-Sepember-2026 | Backup power — what the 24-hour UPS must carry |
Reference: SOW §4.1, Power and Infrastructure
| Section 4.1 requires an uninterruptible power supply capable of a minimum of 24 hours of backup power. Please confirm whether that requirement applies to the IDS control equipment only, or whether it must also carry the Room 120 network switch and the media converters. The connected load, battery capacity and equipment class differ by roughly an order of magnitude between the two readings. | Applies only to the IDS Control equipment, Rm 120 is on facility emergency backup power grid. | ||||
| 12 | 08-Sepember-2026 | 08-Sepember-2026 | Motion detector technology |
Reference: SOW §4.1, Motion Detection
| Section 4.1 calls for a "dual-technology ceiling-mount PIR motion sensor (Optex SX-360Z or equivalent)." The Optex SX-360Z is a 360-degree ceiling-mount passive infrared detector and is not a dual-technology device. Please confirm whether true dual-technology detection, passive infrared plus microwave, is required, or whether the PIR-only SX-360Z as named is acceptable. | Does not have to be dual-tech, PIR is fine | ||||
| 13 | 08-Sepember-2026 | 08-Sepember-2026 | Arm/disarm keypad part number |
Reference: SOW §4.1 and §5.1, System Disarm/Arming State Control
| Both sections reference an "AMAG 880-KP Javelin Arm/Disarm keypad reader." AMAG’s current Javelin keypad line is designated S884, S843 and S844. Please confirm the intended model, or confirm that the current-production Javelin equivalent is acceptable. | Any AMAG javalin keypad that works with the base system is acceptable | ||||
| 14 | 08-Sepember-2026 | 08-Sepember-2026 | License part numbers and head-end software version |
Reference: SOW §4.1; §6.0, second bullet
| Section 4.1 specifies ENT-LIC-008-V9 and Intrusion-PNL-01-V9-E. Section 6.0 requires Symmetry software version 10.1 or above. Symmetry license part numbers are tied to a software generation and must match the head-end they land on. Please confirm the software version currently running on the base head-end, the corresponding license part numbers to be furnished, and who is responsible for any head-end upgrade required to reach version 10.1. | We have an internal badging system, not tied to the base system. We are running version 8.1. | ||||
| 15 | 08-Sepember-2026 | 08-Sepember-2026 | Network switch part number |
Reference: SOW §4.1, Power and Infrastructure
| Section 4.1 specifies a "TrendNet TPE-16XXXX 16-port switch with 4 SFP ports." The model number is incomplete. Please confirm the intended model, or confirm that the contractor may propose an equivalent managed 16-port switch with four SFP ports for Government approval. | Confirmed that the contractor may propose an equivalent managed 16-port switch with four SFP ports for Government approval | ||||
| 16 | 08-Sepember-2026 | 08-Sepember-2026 | TAA and Section 889 compliance |
Reference: SOW §4.1, Power and Infrastructure
| The specified TrendNet switch and Intellinet media converters are named by manufacturer. Please confirm whether Trade Agreements Act compliance certificates and NDAA Section 889 representations are required for these items as furnished, and whether compliant substitutes are acceptable if certificates cannot be obtained for the specific models named | All active electronic, networking, and telecommunications hardware furnished under this contract, including network switches, media converters, and transceivers, must be fully compliant with the Trade Agreements Act (TAA) and NDAA Section 889 regulations (FAR 52.204-24, FAR 52.204-25, and FAR 52.225-5). | ||||
| 17 | 08-Sepember-2026 | 08-Sepember-2026 | Encryption requirement |
Reference: SOW §6.0, third bullet
| Section 6.0 requires that all data communication between the local IDS panels, the Room 120 network switch and the central monitoring base system be fully supervised and encrypted. Please confirm whether AES encryption with FIPS 140-2 or FIPS 197 certification is required, and whether the associated AMAG option is to be furnished by the contractor. | Minimum 128-bit AES compliant with FIPS 197 or FIPS 140-2 / FIPS 140-3 validation | ||||
| 18 | 08-Sepember-2026 | 08-Sepember-2026 | Perimeter penetrations and existing conditions |
Reference: SOW §2 (ICD/ICS 705); §3.2, Demolition Requirements; Attachment 5
| Sections 4.1 and 5.1 require EMT and flexible conduit runs, including dedicated runs from Room 163 to the facility network panel. Please confirm the acceptable method for penetrating the secure perimeter at Rooms 160 and 163, and whether a Government security representative must witness penetrations. Separately, Section 3.2 states no demolition is required while Section 4 requires a new IDS in Room 160. Please confirm whether existing equipment in Room 160 is removed, reused or left in place, and identify the make and model of the two existing alarm panels in Room 120. | Standard penetration is acceptable. Fill gaps around the conduit with expandable foam. No existing equipment to be removed from 160. | ||||
| 19 | 08-Sepember-2026 | 08-Sepember-2026 | CUI handling and dissemination authority |
Reference: CUI markings on Attachments 1 through 5
| The five attachments carry CUI markings and two are floor plans showing alarm device locations in areas accredited for open storage of classified material. So that ESI handles and marks these correctly, please confirm that your firm is authorized to disseminate them to prospective suppliers; identify the CUI category, designating authority and any limited dissemination controls; state how many firms received this package; and confirm whether DFARS 252.204-7012 and any CMMC requirement flow down to this effort. | Rm160 and 163 are not currently accredited for open storage, Rm 120, Communication Room is accredited for open storage, however, diagram does not provide any secure/classified location of content of area, just general location of alarm panels. | ||||||
| 20 | 08-Sepember-2026 | 08-Sepember-2026 | If selected, please confirm the contracting relationship and the payment terms, whether payment to ESI is contingent on your receipt of Government funds, and whether any payment or performance bond is required of us. Please also confirm which party holds responsibility for the one-year warranty and the 24-hour critical-failure response commitment in SOW §7.2. | SSC Det 5/OBS Security Office is responsible for warranty. | This is going to be awarded as a firm-fixed price purchase order. All other information will be received at award. We do not require bond, |
this is a service requirement, not construction.
| 21 | 08-Sepember-2026 | 08-Sepember-2026 | Your correspondence is issued under the name The Nexan, and the website thenexan.com resolves to xleagle.com. So that our file is accurate before we exchange pricing, please confirm the full legal entity name, CAGE code and UEI under which a subcontract or purchase order to ESI would be issued, and confirm the relationship between The Nexan and XL Eagle if they are the same or affiliated entities. | Unclear what you mean, we are not contractors. |
| 22 | 08-Sepember-2026 | 08-Sepember-2026 | Use of ESI pricing and exclusivity |
Reference: Not addressed
| Please confirm whether ESI’s pricing would be used in a single proposal to the Government for this requirement, and whether your firm is submitting only one bid on it. Please also confirm that ESI pricing, scope and technical content will not be shared with other integrators or included in more than one competing offer. If you would like ESI to price this on an exclusive basis, we are glad to discuss it, and we will hold our number for you accordingly. | Quotes are not shared. | |||
| 23 | 08-Sepember-2026 | 08-Sepember-2026 | Conduit Requirements |
| Are the existing CPAs already prepped with conduit runs to the required device locations that may be utilized by the installer? | |
| If not, should we include conduit installation as part of our scope? | |
| Is exposed conduit permitted within the secure areas, or are there restrictions on penetrations and surface-mounted conduit in these locations? | Yes/No, Rm 160 partially prepped, Rm 163 not prepped for conduit, installation should be part of scope. |
No, due to facility excellence requirements and not SCIF level area. No restrictions on penetrations, as needed.
24 08-Sepember-2026 08-Sepember-2026 Room 160 Fiber Requirement
| The documentation references installation of approximately 100 feet of fiber. Could you please clarify the intended purpose of this fiber run so that we may accurately determine the required materials and labor? | Fiber connectivity required for connection to the IDS Alarm Panels and IDS components. | |||
| 25 | 08-Sepember-2026 | 08-Sepember-2026 | Approved IDS Platform |
| Is the Government specifically seeking a Bosch IDS solution, or is another IDS platform required? | |
| Please note that we are not proposing DAQ or DMP equipment. | |
| If Bosch equipment is acceptable, please provide written confirmation that a Bosch intrusion panel will be allowed as part of a compliant solution. | No, gov’t not seeking a Bosch IDS solution, this is a connection to the current IDS platform (Symmetry)). |
Only if it is compatible with the installation’s Symmetry System as stated, this is a connection and compatibility to the current system, not a modification.
26 08-Sepember-2026 08-Sepember-2026 AMAG / IDS Integration for Room 163
| We noted that the SOW references the Javelin keypad; however, for a SCIF-level secure space, the IDS typically requires connectivity to an AMAG controller. | |
| If the main AMAG controller is located outside of the secured rooms, our understanding is that Room 163 may require its own dedicated controller. | |
| Please clarify how the Javelin device is intended to communicate with the main AMAG system in the proposed design. | This is not a SCIF level area, it will be CPA/Secure area, a Javelin is required and connected to the AMAG controller. |
Rm 163 IDS installation will mirror the Rm160 installation, as separate but identical CPA, : Rm 163 will require one M2150 controller stack, on MN-CAB3A and associated Symmetry Intrusion license.
Javelin will communicate via network connection through alarm panels located in Rm120 to the installation IDS 27 08-Sepember-2026 08-Sepember-2026 Network Infrastructure
| What type of network switch is permitted on site for this installation (managed or unmanaged)? | |
| Is there a preferred manufacturer or minimum specification requirement for the switch equipment? | Managed |
Single 24-Port Managed PoE+ switch 28 08-Sepember-2026 08-Sepember-2026 Communications Path
| What communication method will be provided between the site and 21 SFS/ESS? | |
| Will communications be via POTS, IP, cellular, or another approved method? | Communication connectivity between the locations is via Alarm panels located in Room 120. |
Communications is via network connection via switches/alarm panels .