Attachment 7 - Pricing Schedule.xlsx
XLSX spreadsheet 44 KB Posted
- Solicitation number
- FA4528-23-Q-BM03
About this file
This document contains a pricing schedule for a five-year solid waste management services contract for Minot Air Force Base. Key details include:
-
The contractor shall provide integrated solid waste management services including municipal solid waste collection, recycling, yard waste collection, bulk item pickup, landfill tipping fees and other services. Pricing is provided for base year and four option years.
-
Services are specified for collection from buildings and facilities on base, housing areas, and various facilities. Landfill tipping fees are broken out by waste stream and quantity.
-
Pricing details monthly, quarterly and annual costs for each contract line item number (CLIN). Unit prices are provided for collection frequencies, special events and other services. Total costs are calculated for each CLIN and year.
-
The federal agency is the Department of the Air Force Global Strike Command. The location is Minot Air Force Base in North Dakota.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic Year
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | NON-PERSONAL SERVICES: | NSP | |||
| Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Integrated Solid Waste Management services at Minot AFB for the period 1 October 2011 thru 30 September 2012 in accordance with the Performance-based Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0002-0015) | |||||
| 0002 | Municipal Solid Waste / Food Waste Collection (PWS 1.1.1) | ||||
| SUBCLINS will fund this CLIN | |||||
| 0002AA | Municipal Solid Waste / Food Waste Collection - Base | 11 | MO | $30,975 | $340,725 |
| 0002AB | Municipal Solid Waste / Food Waste Collection - Hospital | 11 | MO | $620 | $6,820 |
| 0002AC | Municipal Solid Waste / Food Waste Collection - Commissary | 11 | MO | $1,450 | $15,950 |
| 0003 | Recyclable Collection - Base (PWS 1.1.1) | 11 | MO | $1,410 | $15,510 |
| 0004 | Municipal Solid Waste Collection - MFH (Non-privatized)(PWS 1.1.2.1) | 11 | MO | $12,795 | $140,745 |
| 0005 | Yard (Organic) Waste Collection - MFH (Non-privatized) (PWS 1.1.2.3) | 5 | MO | $4,940 | $24,700 |
| 0006 | Recyclable Collection - MFH (Non-privatized) (PWS 1.1.2.2) | 11 | MO | $1,320 | $14,520 |
| 0007 | Bulk Item Pickup - MFH (Non-privatized) (PWS 1.1.2.4) | 7 | EA | $910 | $6,370 |
| 0008 | Base Operating Recycling Center (PWS 1.2) | N/A | N/A | N/A | N/A |
| 0009 | Operate Composting Facility (PWS 1.2.6) | N/A | N/A | N/A | N/A |
| 0010 | Unscheduled Items Pick-up and Special Events (PWS 1.1.3.1) | 40 | EA | $18 | $720 |
| 0011 | Construction and Demolition Debris Pick-up (PWS 1.1.3.2) | 110 | EA | $148 | $16,280 |
| 0012 | Common Use Trash Receptacle Collection (PWS 1.1.3.3) | 6 | MO | $595 | $3,570 |
| 0013 | Ash Collection (PWS 1.1.3.5) | N/A | N/A | N/A | N/A |
| 0014 | Recyclable Collection - Public/Common Use (PWS 1.1.3.4) | N/A | N/A | N/A | N/A |
| 0015 | Landfill Tipping Fees (PWS 1.5) | ||||
| SUBCLINS will fund this CLIN | |||||
| 0015AA | Landfill Tipping Fees - Base and Hospital | 1760 | Tons | $33.00 | $58,080 |
| 0015AB | Landfill Tipping Fees - MFH | 2200 | Tons | $33.00 | $72,600 |
| 0015AC | Landfill Tipping Fees - Construction and Demolition Debris | 550 | Tons | $13.00 | $7,150 |
| 0015AD | Landfill Tipping Fees - Commissary | 160 | Tons | $33.00 | $5,280 |
TOTAL CLINs 0002 through 0015 $729,020.00
FA4528-12-C-0002
Attachment 2
Option Year 1
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | AMOUNT | QTY | OCTOBER | QTY | NOVEMBER | QTY | DECEMBER | QTY | JANUARY | QTY | FEBRUARY | QTY | MARCH | QTY | APRIL | QTY | MAY | QTY | JUNE | QTY | JULY | QTY | AUGUST | QTY | SEPTEMBER |
| 1001 | NON-PERSONAL SERVICES: | NSP | |||||||||||||||||||||||||||
| Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Integrated Solid Waste Management services at Minot AFB for the period 1 October 2012 thru 30 September 2013 in accordance with the Performance-based Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (1002-1015) | |||||||||||||||||||||||||||||
| 1002 | Municipal Solid Waste / Food Waste Collection (PWS 1.1.1) | ||||||||||||||||||||||||||||
| SUBCLINS will fund this CLIN | |||||||||||||||||||||||||||||
| 1002AA | Municipal Solid Waste / Food Waste Collection - Base | 12 | MO | $30,975 | $371,700 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 | 1 MO | $30,975.00 |
| 1002AB | Municipal Solid Waste / Food Waste Collection - Hospital | 12 | MO | $620 | $7,440 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 | 1 MO | $620.00 |
| 1002AC | Municipal Solid Waste / Food Waste Collection - Commissary | 12 | MO | $1,450 | $17,400 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 | 1 MO | $1,450.00 |
| 1003 | Recyclable Collection - Base (PWS 1.1.1) | 12 | MO | $1,410 | $16,920 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 | 1 MO | $1,410.00 |
| 1004 | Municipal Solid Waste Collection - MFH (Non-privatized)(PWS 1.1.2.1) | 12 | MO | $12,795 | $153,540 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 | 1 MO | $12,795.00 |
| 1005 | Yard (Organic) Waste Collection - MFH (Non-privatized) (PWS 1.1.2.3) | 6 | MO | $4,940 | $29,640 | 1 MO | $4,940.00 | 1 MO | $4,940.00 | 1 MO | $4,940.00 | 1 MO | $4,940.00 | 1 MO | $4,940.00 | 1 MO | $4,940.00 | ||||||||||||
| 1006 | Recyclable Collection - MFH (Non-privatized) (PWS 1.1.2.2) | 12 | MO | $1,320 | $15,840 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 | 1 MO | $1,320.00 |
| 1007 | Bulk Item Pickup - MFH (Non-privatized) (PWS 1.1.2.4) | 8 | EA | $910 | $7,280 | 1MO | $910.00 | 1MO | $910.00 | 1MO | $910.00 | 1MO | $910.00 | 1MO | $910.00 | 1MO | $910.00 | 1MO | $910.00 | 1MO | $910.00 | ||||||||
| 1008 | Base Operating Recycling Center (PWS 1.2) | N/A | N/A | N/A | N/A | ||||||||||||||||||||||||
| 1009 | Operate Composting Facility (PWS 1.2.6) | N/A | N/A | N/A | N/A | ||||||||||||||||||||||||
| 1010 | Unscheduled Items Pick-up and Special Events (PWS 1.1.3.1) | 44 | EA | $18 | $792 | 5 EA | $90.00 | 4 EA | $72.00 | 4 EA | $72.00 | 4 EA | $72.00 | 4 EA | $72.00 | 4 EA | $72.00 | 4 EA | $72.00 | 4 EA | $72.00 | 3 EA | $54.00 | 3 EA | $54.00 | 3 EA | $54.00 | 2 EA | $36.00 |
| 1011 | Construction and Demolition Debris Pick-up (PWS 1.1.3.2) | 120 | EA | $148 | $17,760 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 | 10 EA | $1,480.00 |
| 1012 | Common Use Trash Receptacle Collection (PWS 1.1.3.3) | 6 | MO | $595 | $3,570 | 1 MO | $595.00 | 1 MO | $595.00 | 1 MO | $595.00 | 1 MO | $595.00 | 1 MO | $595.00 | 1 MO | $595.00 | ||||||||||||
| 1013 | Ash Collection (PWS 1.1.3.5) | N/A | N/A | N/A | N/A | ||||||||||||||||||||||||
| 1014 | Recyclable Collection - Public/Common Use (PWS 1.1.3.4) | N/A | N/A | N/A | N/A | ||||||||||||||||||||||||
| 1015 | Landfill Tipping Fees (PWS 1.5) | ||||||||||||||||||||||||||||
| SUBCLINS will fund this CLIN | |||||||||||||||||||||||||||||
| 1015AA | Landfill Tipping Fees - Base and Hospital | 1920 | Tons | $33.00 | $63,360 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 | 160 TN | $5,280.00 |
| 1015AB | Landfill Tipping Fees - MFH | 2400 | Tons | $33.00 | $79,200 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 | 200 TN | $6,600.00 |
| 1015AC | Landfill Tipping Fees - Construction and Demolition Debris | 600 | Tons | $13.00 | $7,800 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 | 50 TN | $650.00 |
| 1015AD | Landfill Tipping Fees - Commissary | 175 | Tons | $33.00 | $5,775 | 15 TN | $495.00 | 15 TN | $495.00 | 15 TN | $495.00 | 15 TN | $495.00 | 15 TN | $495.00 | 15 TN | $495.00 | 15 TN | $495.00 | 14 TN | $462.00 | 14 TN | $462.00 | 14 TN | $462.00 | 14 TN | $462.00 | 14 TN | $462.00 |
TOTAL CLINs 1002 through 1015 $798,017.00 $63,760.00 $63,147.00 $64,057.00 $68,087.00 $64,057.00 $63,147.00 $64,057.00 $69,559.00 $69,541.00 $69,541.00 $69,541.00 $69,523.00
Attachment 2
Option Year 3
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | AMOUNT |
| 3001 | NON-PERSONAL SERVICES: | NSP | |||
| Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Integrated Solid Waste Management services at Minot AFB for the period 1 October 2014 thru 30 September 2015 in accordance with the Performance-based Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (3002-3015) | |||||
| 3002 | Municipal Solid Waste / Food Waste Collection (PWS 1.1.1) | ||||
| SUBCLINS will fund this CLIN | |||||
| 3002AA | Municipal Solid Waste / Food Waste Collection - Base | 12 | MO | $30,975 | $371,700 |
| 3002AB | Municipal Solid Waste / Food Waste Collection - Hospital | 12 | MO | $680 | $8,160 |
| 3002AC | Municipal Solid Waste / Food Waste Collection - Commissary | 12 | MO | $1,530 | $18,360 |
| 3003 | Recyclable Collection - Base (PWS 1.1.1) | 12 | MO | $1,489 | $17,868 |
| 3004 | Municipal Solid Waste Collection - MFH (Non-privatized)(PWS 1.1.2.1) | N/A | N/A | N/A | N/A |
| 3005 | Yard (Organic) Waste Collection - MFH (Non-privatized) (PWS 1.1.2.3) | N/A | N/A | N/A | N/A |
| 3006 | Recyclable Collection - MFH (Non-privatized) (PWS 1.1.2.2) | N/A | N/A | N/A | N/A |
| 3007 | Bulk Item Pickup - MFH (Non-privatized) (PWS 1.1.2.4) | N/A | N/A | N/A | N/A |
| 3008 | Base Operating Recycling Center (PWS 1.2) | N/A | N/A | N/A | N/A |
| 3009 | Operate Composting Facility (PWS 1.2.6) | N/A | N/A | N/A | N/A |
| 3010 | Unscheduled Items Pick-up and Special Events (PWS 1.1.3.1) | 44 | EA | $20 | $880 |
| 3011 | Construction and Demolition Debris Pick-up (PWS 1.1.3.2) | 120 | EA | $150 | $18,000 |
| 3012 | Common Use Trash Receptacle Collection (PWS 1.1.3.3) | 6 | MO | $600 | $3,600 |
| 3013 | Ash Collection (PWS 1.1.3.5) | 0 | MO | $0 | $0 |
| 3014 | Recyclable Collection - Public/Common Use (PWS 1.1.3.4) | 0 | MO | $0 | $0 |
| 3015 | Landfill Tipping Fees (PWS 1.5) | ||||
| SUBCLINS will fund this CLIN | |||||
| 3015AA | Landfill Tipping Fees - Base and Hospital | 1920 | Tons | $33.00 | $63,360 |
| 3015AB | Landfill Tipping Fees - MFH | 0 | Tons | ||
| 3015AC | Landfill Tipping Fees - Construction and Demolition Debris | 600 | Tons | $13.00 | $7,800 |
| 3015AD | Landfill Tipping Fees - Commissary | 175 | Tons | $33.00 | $5,775 |
TOTAL CLINs 3002 through 3015 $515,503.00
Attachment 2
Option Year 4
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | AMOUNT |
| 4001 | NON-PERSONAL SERVICES: | NSP | |||
| Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Integrated Solid Waste Management services at Minot AFB for the period 1 October 2015 thru 30 September 2016 in accordance with the Performance-based Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (4002-4015) | |||||
| 4002 | Municipal Solid Waste / Food Waste Collection (PWS 1.1.1) | ||||
| SUBCLINS will fund this CLIN | |||||
| 4002AA | Municipal Solid Waste / Food Waste Collection - Base | 12 | MO | $30,975 | $371,700 |
| 4002AB | Municipal Solid Waste / Food Waste Collection - Hospital | 12 | MO | $680 | $8,160 |
| 4002AC | Municipal Solid Waste / Food Waste Collection - Commissary | 12 | MO | $1,530 | $18,360 |
| 4003 | Recyclable Collection - Base (PWS 1.1.1) | 12 | MO | $1,489 | $17,868 |
| 4004 | Municipal Solid Waste Collection - MFH (Non-privatized)(PWS 1.1.2.1) | N/A | N/A | N/A | N/A |
| 4005 | Yard (Organic) Waste Collection - MFH (Non-privatized) (PWS 1.1.2.3) | N/A | N/A | N/A | N/A |
| 4006 | Recyclable Collection - MFH (Non-privatized) (PWS 1.1.2.2) | N/A | N/A | N/A | N/A |
| 4007 | Bulk Item Pickup - MFH (Non-privatized) (PWS 1.1.2.4) | N/A | N/A | N/A | N/A |
| 4008 | Base Operating Recycling Center (PWS 1.2) | N/A | N/A | N/A | N/A |
| 4009 | Operate Composting Facility (PWS 1.2.6) | N/A | N/A | N/A | N/A |
| 4010 | Unscheduled Items Pick-up and Special Events (PWS 1.1.3.1) | 44 | EA | $20 | $880 |
| 4011 | Construction and Demolition Debris Pick-up (PWS 1.1.3.2) | 120 | EA | $150 | $18,000 |
| 4012 | Common Use Trash Receptacle Collection (PWS 1.1.3.3) | 6 | MO | $600 | $3,600 |
| 4013 | Ash Collection (PWS 1.1.3.5) | N/A | N/A | N/A | N/A |
| 4014 | Recyclable Collection - Public/Common Use (PWS 1.1.3.4) | N/A | N/A | N/A | N/A |
| 4015 | Landfill Tipping Fees (PWS 1.5) | ||||
| SUBCLINS will fund this CLIN | |||||
| 4015AA | Landfill Tipping Fees - Base and Hospital | 1920 | Tons | $33.00 | $63,360 |
| 4015AB | Landfill Tipping Fees - MFH | 0 | Tons | $0 | |
| 4015AC | Landfill Tipping Fees - Construction and Demolition Debris | 600 | Tons | $13.00 | $7,800 |
| 4015AD | Landfill Tipping Fees - Commissary | 175 | Tons | $33.00 | $5,775 |
TOTAL CLINs 4002 through 4015 $515,503.00
Attachment 2
Base Year FY23
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | MONTHLY TOTAL | ANNUAL TOTAL |
| General Inspection and Maintenance Elevator Building 156 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 188 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 475 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 744 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 1034 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF A-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF B-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF C-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF D-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF E-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF F-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF G-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF H-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF I-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF J-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF K-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF L-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF M-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF N-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF O-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| 0001 | CLIN 0001 Monthly Total - includes all 20 VTEs | 12 | MO | $0.00 | $0.00 | $0.00 |
| TOTAL CLIN 0001 | $0.00 | $0.00 | ||||
| 0002 | Over and Above Services/Repairs - Not Separately Priced | 1 | Job |
Option Year (1)
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | MONTHLY TOTAL | ANNUAL TOTAL |
| General Inspection and Maintenance Elevator Building 156 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 188 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 475 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 744 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 1034 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF A-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF B-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF C-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF D-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF E-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF F-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF G-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF H-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF I-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF J-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF K-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF L-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF M-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF N-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF O-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| 1001 | CLIN 1001 Monthly Total - includes all 20 VTEs | 12 | MO | $0.00 | $0.00 | $0.00 |
| TOTAL CLIN 1001 | $0.00 | $0.00 | ||||
| 1002 | Over and Above Services/Repairs - Not Separately Priced | 1 | Job |
Option Year (2)
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | MONTHLY TOTAL | ANNUAL TOTAL |
| General Inspection and Maintenance Elevator Building 156 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 188 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 475 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 744 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 1034 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF A-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF B-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF C-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF D-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF E-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF F-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF G-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF H-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF I-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF J-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF K-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF L-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF M-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF N-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF O-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| 2001 | CLIN 2001 Monthly Total - includes all 20 VTEs | 12 | MO | $0.00 | $0.00 | $0.00 |
| TOTAL CLIN 2001 | $0.00 | $0.00 | ||||
| 2002 | Over and Above Services/Repairs - Not Separately Priced | 1 | Job |
Option Year (3)
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | MONTHLY TOTAL | ANNUAL TOTAL |
| General Inspection and Maintenance Elevator Building 156 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 188 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 475 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 744 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 1034 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF A-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF B-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF C-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF D-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF E-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF F-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF G-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF H-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF I-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF J-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF K-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF L-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF M-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF N-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF O-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| 3001 | CLIN 3001 Monthly Total - includes all 20 VTEs | 12 | MO | $0.00 | $0.00 | $0.00 |
| TOTAL CLIN 3001 | $0.00 | $0.00 | ||||
| 3002 | Over and Above Services/Repairs - Not Separately Priced | 1 | Job |
Option Year (4)
| CONTRACT LINE ITEM NO. (CLIN) | SUPPLIES/SERVICE | QTY | UNIT | UNIT PRICE | MONTHLY TOTAL | ANNUAL TOTAL |
| General Inspection and Maintenance Elevator Building 156 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 188 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 475 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 744 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator Building 1034 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF A-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF B-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF C-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF D-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF E-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF F-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF G-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF H-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF I-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF J-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF K-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF L-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF M-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF N-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| General Inspection and Maintenance Elevator MAF O-01 | 12 | MO | $0.00 | $0.00 | $0.00 | |
| 4001 | CLIN 4001 Monthly Total - includes all 20 VTEs | 12 | MO | $0.00 | $0.00 | $0.00 |
| TOTAL CLIN 4001 | $0.00 | $0.00 | ||||
| 4002 | Over and Above Services/Repairs - Not Separately Priced | 1 | Job | |||
| TOTAL ALL OPTION YEARS | $0.00 |
File details come from the government source that posted it. Updated .