Attachment 7 - EHRM KC Data Center Upgrades Drawing Set.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77623B0065
About this file
This attachment is a drawing set for data center upgrades at the EHRM KC Data Center. The drawings support Solicitation Number 36C77623B0065 from the Department of Veterans Affairs Technology Acquisition Center Austin for project #570-21-701 EHRM Training & Admin Support. The solicitation seeks proposals for upgrades to infrastructure systems at the EHRM KC Data Center, as depicted in the 19MB drawing set. Key systems addressed include electrical systems, mechanical systems, fire protection systems, and security systems. Proposed upgrades are intended to improve capacity, redundancy, and reliability of critical data center functions. Response and award dates are not specified in the attachment or related solicitation information provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PRIOR TO COMMENCEMENT OF DEMOLITION AND CONSTRUCTION ACTIVITIES, ALL DIMENSIONS SHOWN IN THESE DOCUMENTS SHALL BE VERIFIED. ANY DISCREPANCIES BETWEEN PROPOSED WORK AND EXISTING CONDITIONS
SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE COR.
2. THE CONTRACTOR SHALL PROTECT EXISTING CONDITIONS INCLUDING CORRIDORS, ELEVATORS, DOORS, EQUIPMENT, FLOORS, BASES, CEILING TILES, WALLS, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ALL DAMAGE RESULTING FROM CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT.
3. THE COR SHALL BE NOTIFIED NO LESS THAN SEVEN (7) DAYS PRIOR TO ANY EXCESSIVE NOISE ACTIVITIES INCLUDING
HAMMER DRILLING, SAW CUTTING, OR CORE DRILLING.
4. UTILITY SHUTDOWNS SHALL BE COORDINATED, IN WRITING, WITH THE COR NO LESS THAN THREE (3) WEEKS PRIOR TO
THE REQUIRED SHUTDOWN.
5. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ANY EXISTING UTILITIES, INCLUDING FIRE PROTECTION, DAMAGED
DURING DEMOLITION AND CONSTRUCTION ACTIVITIES.
6. ALL PENETRATIONS IN EXISTING WALLS SHALL BE PATCHED, REPAIRED, AND FINISHED TO MATCH EXISTING.
7. ALL WALLS INDICATED TO BE FIRE AND/OR SMOKE RATED SHALL BE CLEARLY LABELED.
GENERAL NOTES :
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
DRAWING SCHEDULE
PROJECT No.
Owner: Structural: Mechanical & Plumbing: Electrical: Fire Protection: Telecom: Technology:Architectural:
589-21-706
11/04/2022100% FINAL BID DOCUMENTS
EHRM Infrastructure Upgrades – Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
4801 E. LINWOOD BLVD,
KANSAS CITY, MO 64128
N/A PROFESSIONAL ENGINEERING
CONSULTANTS (PEC)
303 S. TOPEKA, WICHITA, KS
67202
PROFESSIONAL ENGINEERING
CONSULTANTS (PEC)
303 S. TOPEKA, WICHITA, KS
67202
KANSAS CITY VA MEDICAL CENTER PROFESSIONAL ENGINEERING
CONSULTANTS (PEC)
303 S. TOPEKA, WICHITA, KS
67202
PROFESSIONAL ENGINEERING
CONSULTANTS (PEC)
303 S. TOPEKA, WICHITA, KS
67202
PROFESSIONAL ENGINEERING
CONSULTANTS (PEC)
4801 E. LINWOOD BLVD. KANSA
CITY, MO 64128
ATRIAX, PLLC
102 3RD AVENUE NE, HICKORY, NC
28601
G101
SHEET LIST
SHEET
NUMBER SHEET NAME 10
S
U B
M
IT
T A
L
0/
/2
S U
B M
IT
T
A L
/2 /2
S U
B M
IT
T
A L
/2 1/
S U
B M
IT
T
A L
/2 2/
S U
B M
IT
T
A L
/2 7/
0%
S U
B M
IT
T
A L
1/ 4/
ARCHITECTURAL
A101 FLOOR PLAN - NEW WORK X X
A401 INTERIOR ELEVATIONS, SECTIONS AND DETAILS X X
A501 SCHEDULES & DETAILS X X
A601 3D - ISOMETRIC DRAWINGS & SECTIONS X
ARCHITECTURAL - DEMOLITION
AD101 DEMOLITION PLAN X X
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND SYMBOLS
ED101 ELECTRICAL DEMOLITION PLAN - BASEMENT
EL101 ELECTRICAL LIGHTING PLAN - BASEMENT
EL501 ELECTRICAL LIGHTING SCHEDULES
EP101 ELECTRICAL POWER PLAN - BASEMENT
EP301 ELECTRICAL OVERALL FLOOR PLAN - BASEMENT
EP501 ELECTRICAL POWER DETAILS
EP601 ELECTRICAL PARTIAL ONE-LINE DIAGRAM
EP602 ELECTRICAL PARTIAL ONE-LINE DIAGRAM
EP603 ELECTRICAL POWER SCHEDULES
EY101 ELECTRICAL SYSTEMS PLAN - BASEMENT
EY501 ELECTRICAL SYSTEMS DETAILS
EY502 ELECTRICAL SYSTEMS DETAILS
EY601 ELECTRICAL SYSTEMS CONTROLS DIAGRAM
MECHANICAL
PM001 MECHANICAL COVER SHEET
FP101 FIRE PROTECTION PLAN - BASEMENT
PD101 PLUMBING DEMOLITION PLAN - BASEMENT
PL100 PLUMBING PLAN - SUB-BASEMENT
PL101 PLUMBING PLAN - BASEMENT
MD101 HVAC DEMOLITION PLAN - BASEMENT
MD201 MECHANICAL DEMOLITION PLAN - ROOF
MH101 HVAC PLAN - BASEMENT
MH201 MECHANICAL PLAN - ROOF
MH301 MECHANICAL CONTROL DETAILS
MP100 MECHANICAL PIPING PLAN - SUB-BASEMENT
MP101 MECHANICAL PIPING PLAN - BASEMENT
MP102 MECHANICAL PIPING PLAN - FIRST FLOOR
PM301 MECHANICAL DETAILS
PM302 MECHANICAL SCHEDULES
LOCATION MAP
AERIAL VIEW
MEDICAL CENTER DIRECTOR:
ASSISTANT DIRECTOR:
ASSOCIATE DIRECTOR:
CHIEF OF STAFF:
DIRECTOR OF PATIENT SERVICES:
CHIEF OF FACILITIES MANAGEMENT:
INFECTION CONTROL PRACTITIONER:
SAFETY OFFICER:
INTEGRATED PROJECT TEAM
APPROVAL SIGNATURES
GENERAL
G101 COVER SHEET & DRAWING INDEX X X
G102 NOTES, ABBREVIATIONS, LEGENDS X X
G103 ICRA GUIDELINES X X
G104 LIFE SAFETY PLAN X X
TECHNOLOGY
TN000 TECHNOLOGY COVERSHEET
TD101 BASEMENT FLOOR PLAN - DEMOLITION - TECHNOLOGY
TN101 BASEMENT FLOOR PLAN - NEW WORK - TECHNOLOGY
TN400 TECHNOLOGY DETAILS AND RISERS
TN600 TECHNOLOGY SCHEDULES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
ALUMINUM
CONCRETE
GLASS
RIGID INSULATION
BRICK IN SECTION
CONCRETE MASONRY UNIT
EARTH
GYPSUM / PLASTER
STEEL
PEA GRAVEL
STONE
BATT INSULATION
PRECAST
GRAVEL
SAND
WOOD - SOLID
PLYWOOD
BRICK
CULTURED STONE
EXTERIOR COMPOSITE
PANEL
WOOD BLOCKING
WOOD SHIM
MATERIALS LEGEND
SYMBOLS LEGEND
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS
B14
Room Name
0-0000
NET SF
0 GRID LINE
ROOM No.
DOOR No.
WALL TYPE
NORTH ARROW
SPECIALTY
EQUIPMENT /
FURNITURE TAG
SCOPE NOTE
CENTER LINE
INTERIOR
ELEVATION
DETAIL
SPOT
ELEVATION
MARKERS
REVISION No.
REVISION
CLOUD
EXTERIOR
ELEVATION
BUILDING SECTION
A301
A201
A211
A501
4 2
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
X'-XX" CEILING TAG
CL
WALL SECTION
A301
DETAIL
SHEET
1 - HOUR FIRE BARRIER
Sheet No. Sequence Sheet Discipline
A100 SHEET NUMBER
ICRA BARRIER
PAINT CODEP1
CORNER GUARD
CG
2 - HOUR FIRE BARRIER
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:1
A
M
G102
NOTES, ABBREVIATIONS,
LEGENDS
EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
TEMP TEMPERATURE
TEMP TEMPORARY
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
TK BD TACK BOARD
TKP TACKABLE PANELING
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TR ACCENT RAIL
TRTD TREATED
TRZ INTERIOR POURED EPOXY RESIN
TERRAZO
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UGND UNDERGROUND
UL UNDERWRITER'S LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VOLT
VAC VACUUM
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VOL VOLUME
VP VACUUM PUMP
VP VANISHING POINT
VP VAPOR PRESSURE
VP VENEER PLASTER
VPC VENEER PLASTIC CEILING/SOFFIT
VR VAPOR RETARDER
VRR VINYL (ACROVYN) RAIL
VS VENT STACK
VS VOLUMETRIC SWITCH
VS SHEET VINYL
VT SOLID VINYL TILE
VTR VENT THRU ROOF
VTS VINYL TRANSITION STRIP
VWC VINYL WALLCOVERING
W WIDE
W WEST
W / W WALL TO WALL
W/ WITH
W/D WASHER / DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WC WALLCOVERING
WD WOOD
WDH WOOD HAND RAIL
WDM WOOD WALL MOULDINGS
WDP WOOD PANELING
WDR WOOD CHAIR, CRASH, OR HAND RAIL
WDS ATHLETIC/ACOUSTIC ISOLATED WOOD
FLOORING
WDSHV WOOD SHELVING
WDT WOOD TILE OR PARQUET FLOORING
WDV WOOD VENEER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WALL HUNG
WI WROUGHT IRON
WP WATERPROOF
WP WORKING POINT
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WR WIRE ROPE
WRP WATER REPELLENT
WT WEIGHT
WWF WELDED WIRE FABRIC
XPS EXTRUDED POLYSTYRENE
YD YARD
PREFIN PRE-FINISHED
PRF POLYURETHANE SPORTS FLOORING
PROP PROPERTY
PRST PRESSURE TREATED
PS POURED SEALANT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT(ED)
PT/E EPOXY PAINT
PT/F FLAT PAINT
PT/HG HIGH GLOSS PAINT
PT/SG SEMIGLOSS PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PV PAVED
PVC POLYVINYL CHLORIDE
PVG PAVING
Q HEAT TRANSFER
Q RATE OF FLOW
QT QUARRY TILE
QTY QUANTITY
QZF QUARTZ FLOORING
QZR QUARTZ RESIN
QZT QUARTZ TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE(D)
REQ REQUIRED
RESIL RESILIENT
REST RESTROOM
RET RETURN
REV REVISE / REVISION
RF RESILIENT FLOORING
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RAILROAD
RR ROLL ROOFING
RS RAPID START
RS ROUGH SAWN
RS RUBBER SHEET
RSF RUBBER SHEET FLOORING
RST REINFORCING STEEL
RT RIGHT
RTF RUBBER TILE FLOORING
RTS RUBBER TRANSITION STRIP
RWD REDWOOD
RWL RAIN WATER LEADER
S SOUTH
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SD SOAP DISPENSER
SECT SECTION
SF SQUARE FEET
SGL SINGLE
SH SINGLE HUNG
SHR SHOWER
SHR HD SHOWER HEAD
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SL SEA LEVEL
SL SPOT LIGHT
SLDG SLIDING
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPC SUSPENDED PLASTER CEILING
SPEC SPECIFY / SPECIFICATION
SPH SOLID PHENOLIC POLYMER (TRESPA)
SPKR SPEAKER
SPR SOLID POLYMER RESIN (3FORM)
SQ SQUARE
SQIN SQUARE INCH(ES)
SSP SOLID SURFACE POLYMER (CORIAN)
SSPR SOLID POLYMER (CORIAN) RUB RAIL
SST STAINLESS STEEL
SSTR STAINLESS STEEL RUB RAIL
ST SINGLE THROW
ST STAIRS
ST STREET
ST STAIN
STA STATION
STD STANDARD
STIF STIFFENER
STON STONE
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUH SUSPENDED UNIT HEATER
SURF SURFACE
SUSP SUSPENDED
SVP VINYL SOLID PANEL (ACROVYN)
SW SWITCH
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T/S TUB / SHOWER
TB TOWEL BAR
TC TERRA COTTA
TCZ CEMENTITIOUS TERRAZZO
TEL TELEPHONE
HD HAND DRYER
HDBD HARDBOARD
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HDWL HEADWALL
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HEAT PUMP
HP HIGH PRESSURE
HP HORSEPOWER
HR HAND RAIL
HS HAND SINK
HT HEIGHT
HVAC HEATING / VENTILATION / AIR
CONDITIONING
HW HOT WATER
HWP HOT WATER PUMP
HYD HYDRANT
IC IRONING CABINET
ID INSIDE DIAMETER
IN INCH / INCHES
INCL INCLUDE(D) / INCLUDING
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
ITS INTERTEK TESTING SERVICES
J-BOX JUNCTION BOX
JAN CLO JANITOR'S CLOSET
JS JANITOR'S SINK
KIT KITCHEN
L ANGLE
L LITER
LAB LABORATORY
LAM LAMINATE(D)
LAV LAVATORY
LB(S) POUND(S)
LC LINEN CLOSET
LF LINEAR FOOT (FEET)
LH LEFT HAND
LIB LIBRARY
LINO LINOLEUM
LKR LOCKER
LNO LINOLEUM
LPT LOW POINT
LT LIGHT
LTF LINOLEUM TILE FLOORING
LTWT LIGHT WEIGHT
LVR LOUVER
m METER
MACH MACHINE
MAT WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MB MAIL BOX
MB MIXING BOX
MBH MOP/BROOM HOLDER
MC MEDICINE CABINET
MCP ACOUSTIC LAY-IN METAL CEILING PADS
ME MECHANICAL ENGINEER
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MKR BD MARKER BOARD
MLDG MOULDING
mm MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MS MOP SINK
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
MTS METAL TRANSITION STRIP
MULL MULLION
MVBL MOVABLE
MW MICROWAVE
N NORTH
NA NOT AVAILABLE / APPLICABLE
NAT NATURAL
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF / CI OWNER FURNISHED / CONTRACTOR
INSTALLED
OFF OFFICE
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OZ OUNCE
PAR PARALLEL
PAR PARAPET
PART PARTIAL
PAT PATTERN
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PED PEDESTAL
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DMPF DAMPPROOFING
DR DOOR / DRAIN
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EF EACH FACE
EG VERTICAL END GUARDS
EHD ELECTRIC HAND DRYER
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EM ELECTROMAGNETIC
EM EXPANDED METAL
EMER EMERGENCY
ENCL ENCLOSED / ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EPB ELECTRIC PANEL BOARD
EQ EQUAL(LY)
EQUIP EQUIPMENT
ER POURED EPOXY
ERF POURED EPOXY FLOORING
ESCAL ESCALATOR
EST ESTIMATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXF EXTERIOR FINISH
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAB FABRIC
FAI FRESH AIR INTAKE
FBRK FIREBRICK
FCP PREFABRICATED FABRIC CEILING PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE 20-B,C PORTABLE FIRE EXTINGUISHER
(CARBON DIOXIDE)
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FGL FIBERGLASS
FH FIRE HOSE
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIN FLR FINISHED FLOOR
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLASH FLASH(ING)
FLR FLOOR
FLRSK FLOOR SINK
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FOW FACE OF WALL
FP FIREPROOF
FPL FIREPLACE
FR FRAME
FRG FIBER REINFORCED GYPSUM
FRP FIBERGLASS REINFORCED PLASTIC
FRT FIRE RETARDANT TREATED
FSP FIRE STAND PIPE
FSTNR FASTENER
FTG FOOTING
FURG FURRING
FUT FUTURE
FWC FABRIC WALL COVER
FWP NON-ACOUSTIC STRETCHED FABRIC
PANEL WALL INSTALATION
G GROUND
GA GAGE
GALV GALVANIZE(D)
GB GRAB BAR
GC GENERAL CONTRACTOR
GDISP GARBAGE DISPOSAL
GEN GENERAL
GFP GFRP OR GFRG FREESTANDING PANEL
GFRG GLASS FIBER REINFORCED GYPSUM
GFRP GLASS FIBER REINFORCED POLYMER
GL GLASS / GLAZING
GL BLK GLASS BLOCK
GLT GLASS MOSIAC TILE
GLZ GLAZING
GLZ CMU GLAZED CONCRETE MASONRY UNIT
GPM GALLONS PER MINUTE
GR GROSS
GR LN GRADE LINE
GRAN GRANITE
GT GREASE TRAP
GT GROSS TON
GT GROUT
GYP GYPSUM
GYP BD GYPSUM BOARD
H HIGH
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAVY DUTY
@ AT
A/C AIR CONDITIONER / CONDITIONING
ACC ACCESSIBLE
ACCSY ACCESSORY
ACOUS INSUL ACOUSTICAL INSULATION
ACOUS PNL ACOUSTICAL PANELS
ACP LAY-IN ACOUSTIC PANEL CEILING PADS
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADDM ADDENDUM
ADJ ADJUSTABLE / ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AHR ANCHOR
AHU AIR HANDLING UNIT
ALNMT ALIGNMENT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
APPVD APPROVED
APT APARTMENT
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR TESTING
MATERIALS
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVG AVERAGE
AWP WALL-MOUNTED SOUND ABSORPTION
PANEL
AWT ACOUSTIC WALL TREATMENT
BD BOARD
BITUM BITUMINOUS
BL BASELINE
BL BLACK
BLDG BUILDING
BM BEAM
BO BLOWOFF
BOT BOTTOM
BR BEDROOM
BRG BEARING
BS BOTH SIDES
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
BW BOTH WAYS
C CELSIUS
C CHANNEL
C TO C CENTER TO CENTER
CAB CABINET
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CEM CEMENT
CEM PLAS CEMENT PLASTER (STUCCO)
CER CERAMIC
CG CORNER GUARD
CH CHILLER
CH COAT HOOK
CHBD CHALKBOARD
CHFR CHAMFER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CL D CLOTHES DRYER
CLG CEILING
CLG HT CEILING HEIGHT
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CARBON MONOXIDE
CO CASED OPENING
CO CERTIFICATE OF OCCUPANCY
CO CLEANOUT
CO COMPANY
CO CUTOUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONC FLR SEALED CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
CONT CONTROLLER
CONV CONVERT
CORR CORRIDOR / CORRUGATED
CPT CARPET
CR CLOSET ROD
CR CONTROL RELAY
CR CONTROL ROOM
CR CRASH RAIL
CS CAST STONE
CS CONTROL SWITCH
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU COPPER
CU FT CUBIC FOOT
CU YD CUBIC YARD
CUB CUBICLE CURTAIN
CURT CURTAIN
CW CASEMENT WINDOW
CW CHEMICAL WASTE LINE
CW CLOCKWISE
CW COLD WATER PIPING
D DEEP
Revisions: Date:
FE
INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDES, BUT IS NOT LIMITED TO:
1. REMOVAL OF CEILING TILES FOR VISUAL
INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET
2. PAINTING (BUT NOT SANDING)
3. WALLCOVERING, ELECTRICAL TRIM WORK, MINOR
PLUMBING, AND ACTIVITIES WHICH DO NOT
GENERATE DUST OR REQUIRE CUTTING OF WALLS OR
ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH
CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
1. INSTALLATION OF TELEPHONE AND COMPUTER
CABLING THROUGH CONDUIT AND/OR NOT
INVOLVING DRILLING/ANCHORING
2. ACCESS TO CHASE SPACES
3. CUTTING OF WALLS OR CEILING WHERE DUST
MIGRATION CAN BE CONTROLLED.
TYPE B
WORK WHICH GENERATES A MODERATE TO HIGH
LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES
INCLUDES, BUT IS NOT LIMITED TO:
1. ANY KIND OF SANDING TO INCLUDE SANDING OF
WALLS FOR PAINTING OR WALL COVERING
2. REMOVAL OF FLOOR COVERINGS, CEILING TILES
AND CASEWORK
3. NEW WALL CONSTRUCTION
4. MINOR DUCT WORK OR ELECTRICAL WORK ABOVE
CEILINGS
5. MAJOR CABLING ACTIVITIES, I.E. INSTALLATION OF
NEW CONDUIT,ANCHORING CONDUIT INTO CONCRETE,
ETC.
6. ANY ACTIVITY WHICH CANNOT BE COMPLETED
WITHIN A SINGLE WORK SHIFT.
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
1. ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS
2. REQUIRES HEAVY DEMOLITION OR REMOVAL OF A
COMPLETE CEILING SYSTEM
3. NEW CONSTRUCTION.
TYPE D
WORK TYPE
RISK ASSESSMENT GUIDELINES
1) UNOCCUPIED BUILDINGS AND/OR
OUTSIDE PROJECTS INVOLVING
DEMOLITION OR EXCAVATION REMOTE
FROM AIR INTAKES.
GROUP 0 GROUP 1 LOWEST RISK
1) BIOMEDICAL
2) ENGINEERING
3) ENVIRONMENTAL SERVICES
4) HIM
5) MORGUE
6) NON-CLINICAL OFFICE AREAS
7) NON-PATIENT CARE AREAS
8) OUTSIDE PROJECTS OR
EXCAVATION NEAR AIR INTAKE
GROUP 2 MEDIUM RISK GROUP 3 MED-HIGH RISK
1) ACUTE NURSING UNITS-2W, 4W,
2N, IP MENTAL HEALTH, CLC
2) CAFETERIA
3) CARDIOLOGY
4) CBOCs
5) CLEAN LINEN STORAGE
6) DENTAL
7) DERMATOLOGY
8) ECHOCARDIOGRAPHY
9) ENDOSCOPY/GI
10) LABORATORY
11) PROSTHETICS
12) RADIOLOGY, ULTRASOUND
13) REHAB/PT/OT/ST
14) RESPIRATORY CARE
1) BRONCH SUITE
2) ICU, SDU
3) EMERGENCY DEPARTMENT
4) HEMODIALYSIS
5) INTERVENTIONAL RADIOLOGY
6) MRI/CT/NUCLEAR MED
7) OUTPATIENT ONCOLOGY/
CHEMOTHERAPY
8) PHARMACY AREAS OTHER THAN
CLEAN ROOM
9) STERILE SUPPLY STORAGE AREAS
GROUP 4 HIGHEST RISK
1) ANESTHESIA AREAS
2) CARDIAC CATH LAB
3) NEGATIVE PRESSURE ISOLATION
ROOMS
4) OPERATING ROOMS, HOLDING/PACU
5) PHARMACY CLEAN ROOM
6) STERILE PROCESSING
INFECTION CONTROL MATRIX
GROUP 0
GROUP 1
GROUP 2
GROUP 3
GROUP 4
CONSTRUCTION ACTIVITY @ RISK LEVEL TYPE "A" TYPE "B" TYPE "C" TYPE "D"
I
I
I
III
II
II
III
III / IV
II
III
III / IV
III / IV
III / IV
IV
IV
IV
SHADED SELECTION APPLIES TO AREA OF WORK AS INDICATED BY THE GROUP RISK LEVEL.
IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING ON THE AREA CLASS DESIGNATION
DURING CONSTRUCTION UPON COMPLETION OF PROJECT
INTERIM MEASURE CLASS 0
1. NO INFECTION CONTROL REQUIREMENTS DURING PROJECT.
INTERIM MEASURE CLASS I
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL
INSPECTION.
3. USE CONTROL CUBE FOR CEILING ACCESS WHEN > 1 CEILING TILE
REMOVED
PER 50 SQ. FT.
INTERIM MEASURE CLASS II
1. ALL CLASS I ABOVE PLUS CLASS II REQUIREMENTS
2. PROVIDE ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM
DISPERSING
INTO ATMOSPHERE BARRIERS.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE
5. BLOCK OFF AND SEAL ALL HVAC AIR RETURNS AND SUPPLIES.
6. ADHESIVE WALKOFF MATS REQUIRED AT ALL ENTRY POINTS
7. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
8. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE
LEAVING WORK AREA.
INTERIM MEASURE CLASS III
1. ALL CLASS II ABOVE PLUS CLASS III REQUIREMENTS
2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
DONE TO
PREVENT CONTAMINATION OF THE DUCT SYSTEM
3. COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK
AREA
BEFORE CONSTRUCTION BEGINS.
4. DAILY MONITOR (FIXED OR PORTABLE) AND DOCUMENTATION OF
NEGATIVE AIR PRESSURE TO -0.010 WITHIN WORK SITE 24/7, UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS AND HEPA FILTER CHANGES AS
NEEDED.
5. REMOVE CONSTRUCTION WASTE/DEBRIS/TRASH DAILY IN TIGHTLY
COVERED CONTAINERS USING TAPE TO SEAL AS NECESSARY.
6. WIPE OFF CARTS AND WHEELS WITH APPROVED DISINFECTANT BEFORE
TRANSPORTING DEBRIS.
7. TO REDUCE DUST IN AREA, VACUUMS AND WET MOP WITH DISINFECTANT.
8. ADHESIVE WALK-OFF MATS REQUIRED AT ALL ENTRY POINTS.
INTERIM MEASURE CLASS IV
1. ALL CLASS III AND IV REQUIREMENTS PLUS ANTEROOM CONSTRUCTION IS
REQUIRED.
2. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
3. ENGINEERING TO PROVIDE AND MAINTAIN ANTEROOM PPE CART WITH
BUNNY
SUIT,SHOE COVERS, HEPA VACUUM, TRASH CAN, AND PHONE NUMBER
FOR SUPPLY RESTOCKING.
4. ALL PERSONNEL ARE REQUIRED TO PASS THROUGH ANTEROOM. ON
ENTRY, PERSONNEL MAY WEAR REGULAR WORK ATTIRE OR CLOTH/PAPER
COVERALLS (BUNNY SUITS). ON EXIT, REGULAR WORK ATTIRE MUST BE
VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE, OR CLOTH/PAPER BUNNY SUITS IF UTILIZED MUST BE REMOVED
WHEN EXITING.
5. SHOE COVERS ARE REQUIRED FOR ENTRY AND MUST BE REMOVED UPON
EXITING.
6. PROJECT COORDINATOR/TEAM RESPONSIBLE FOR PPE TRASH REMOVAL.
1. CLEAN WORK AREA IMMEDIATELY AFTER TASK COMPLETION.
1. REMOVE TAPE FROM SEALED DOORS.
2. WIPE WORK SURFACES WITH APPROVED DISINFECTANT.
3. UNBLOCK/UNSEAL HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
4. FINAL TERMINAL CLEANING BY EMS.
1. PROJECT COORDINATOR (CONTRACTOR OR ENGINEERING) TO PROVIDE
THROUGH GENERAL CLEANING OF AREA PRIOR TO INSPECTION BY
INFECTION CONTROL FOR BARRIER REMOVAL.
2. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL INSPECTED BY I
NFECTION
CONTROL AND THE APPROVED BY PROJECT COORDINATOR.
3. ICRA PERMIT WILL BE REMOVED BY INFECTION CONTROL AFTER
INFECTION
CONTROL INSPECTION AND BEFORE BARRIER REMOVAL.
4. AFTER INFECTION CONTROL INSPECTION, REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE SPREADING OF DUST THAT MAY BE PRESENT ON
THE BARRIERS.
5. FOLLOWING BARRIER REMOVAL, AREA MUST BE THOROUGHLY T
ERMINALLY
CLEANED WITH HOSPITAL-APPROVED DISINFECTANT BY HOUSEKEEPING
PRIOR TO SPACE OWNER OCCUPANCY.
1. PROJECT COORDINATOR(CONTRACTOR OR ENGINEERING) TO PROVIDE
THOROUGH GENERAL CLEANING OF AREA PRIOR TO INSPECTION BY
INFECTION CONTROL FOR BARRIER REMOVAL.
2. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL INSPECTED BY
INFECTION CONTROL AND APPROVED BY PROJECT COORDINATOR.
3. ICRA PERMIT WILL BE REMOVED BY INFECTION CONTROL AFTER
INFECTION CONTROL INSPECTION AND BEFORE BARRIER REMOVAL.
4. AFTER INFECTION CONTROL INSPECTION, REMOVE BARRIER MATERIALS,
CAREFULLY TO MINIMIZE SPREADING OF DUST THAT MEY BE PRESENT ON
THE BARRIERS.
5. FOLLOWING BARRIER REMOVAL,AREA MUST BE THOROUGHLY
TERMINALLY CLEANED WITH HOSPITAL-APPROVED DISINFECTANT BY
HOUSEKEEPING PRIOR TO SPACE OWNER OCCUPANCY.
ELEC. CLOSET
MB-501
OPEN OFFICE
MB-510
WORKROOM
MB-480
OFFICE
MB-482
STAFF UNIFORM
ROOM
MB-496
SOILED LINEN
MB-401
CORRIDOR
CB-50
CORRIDOR
MB-505
A
B
DATA CENTER
MB-100
OFFICE
MB-514
OFFICE
MB-513
LOUNGE
MB-512
PASSAGE
MB-511
OFFICE
MB-509
MECH. ROOM
MB-507
MECH. ROOM
MB-503
TOILET, MALE
MB-494
OFFICE
MB-492
OFFICE, CHIEF
MB-490
OFFICE
MB-486
PLACE CONSTRUCTION BARRIER IN COMPLIANCE WITH THE APPROPRIATE "ICRA" LEVEL.
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:1
A
M
G103
ICRA GUIDELINES EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
ICRA GENERAL NOTES
1. INFECTION CONTROL IS CRITICAL IN ALL MEDICAL CENTER FACILITIES. INTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF EXISTING DUST OR CREATING NEW DUST SHALL BE CONDUCTED WITHIN VENTILATION-CONTROLLED AREAS THAT MINIMIZE THE FLOW OF AIRBORNE PARTICLES INTO PATIENT AREAS. EXTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF SOIL OR CREATING
DUST IN SOME OTHER MANNER SHALL BE CONTROLLED.
2. INFECTION CONTROL PERMITS WILL BE REQUIRED FOR ALL AREAS OF WORK.
3. THE LIMITS OF CONSTRUCTION GRAPHICALLY INDICATED ARE APPROXIMATE. THE FINAL
DETERMINATION IS TO BE COORDINATED WITH THE PROJECT COR.
4. ALL MEANS OF EGRESS MUST BE MAINTAINED AND APPROPRIATELY INDICATED AT ALL TIMES.
5. THE LOCATION OF THE TEMPORARY CONSTRUCTION BARRIER/ANTEROOM GRAPHICALLY INDICATED IS APPROXIMATE. THE FINAL LOCATION IS TO BE COORDINATED WITH THE PROJECT COR. CONTRACTOR
TO USE TEMPORARY CONSTRUCTION BARRIER/ANTEROOM APPROPRIATE FOR INTERIM MEASURE
CLASS AS SHOWN ON ICRA TABLE ON THIS SHEET.
6. AN INFECTION CONTROL MATRIX IS PROVIDED ON ARCHITECTURAL SHEETS FOR AREAS OF WORK WHERE INFECTION CONTROL MEASURES SHALL BE IMPLEMENTED. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING AREA OF WORK PRIOR TO CONSTRUCTION.
7. IF LONG-TERM CEILING REMOVAL IS REQUIRED, THE GC SHALL DISCUSS WITH COR WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED. THE ACCEPTABILITY OF NON-RATED BARRIERS (PLASTIC
SHEETING) FOR CONSTRUCTION AREA SEPARATION IS BASED ON THE SPRINKLERS WITHIN THE
CONSTRUCTION AREA BEING OPERABLE. REMOVAL OF MORE THAN ONE CEILING TILE WITHIN THE
PROTECTION AREA OF A SPRINKLER CAN RENDER THE SPRINKLER INEFFECTIVE DUE TO HEAT
ENTERING THE CEILING PLENUM AND BYPASSING THE SPRINKLER. IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER MIGHT NEED TO BE CONSTRUCTED; AN ALTERNATIVE IS TO INSTALL TEMPORARY UPRIGHT SPRINKLERS. THE REMOVAL OF CEILINGS IN SHOULD BE DONE IN THE SAME WORK SHIFT WHERE THE NEW UPRIGHT
SPRINKLERS ARE INSTALLED.
8. ALL FLOOR OR RATED WALL PENETRATIONS SHALL BE FIRESTOPPED AT END OF WORK SHIFT PER SPECIFICATION 07 84 00, FIRESTOPPING. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED FOR ADDITIONAL WORK IN THAT
AREA, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE INSTALLED IN THE
PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
9. IN AREAS WHERE THE CONSTRUCTION OF A BARRIER IS PROHIBITIVE, INCLUDING ABOVE CEILING
WORK, USE OF AN INFECTION CONTROL CUBE IS ALLOWED.
10. IN AREAS WHERE WORK IS ABOVE CEILING ONLY, THE WORK TYPE WILL BE TYPE B.
1/4" = 1'-0"1
FLOOR PLAN - ICRA
GENERAL NOTES:
THE FOLLOWING NATIONWIDE VA EQUIVALENCIES HAVE BEEN REVIEWED AND
APPROVED BY THE JOINT COMMISSION AND APPLY TO ALL BUILDINGS.
1. OVERSIZED PROTECTIVE PLATES PERMITTED ON FIRE RATED DOORS.
2. BUSINESS OCCUPANCY DEAD END CORRIDORS PERMITTED TO EXCEED 50
FEET.
3. INTERVAL SPRINKLER PIPING CONDITION & OBSTRUCTION INVESTIGATION.
4. SELF-CLOSING DOOR REQUIREMENT FOR CORRIDOR DOORS IN A
DORMITORY OCCUPANCY.
KEY NOTES:
1. NONSPRINKLERED ELECTRICAL EQUIPMENT ROOM PER SECTION
8.15.11.2 OF NFPA 13-2016 EDITION OR SECTION 9.2.6 OF NFPA 13-2019
EDITION.
2. FIRE DOOR RATING AND FRAME LABELING PLATE VERIFIED UNDER
CONTINUOUS HINGE.
3. DECOMMISSIONED DUMBWATER.
4. FIRE SPRINKLERS INSTALLED PER LIBRARY AND SHELVING STORAGE
SPACING REQUIREMENTS OF SECTION 8.15.10 OF NFPA 13-2016
EDITION OR SECTION 0.3.7 OF NFPA 13-2019 EDITION.
5. PRE ACTION SPRINKLER SYSTEM INSTALLED IN 1975.
X
MORGUE SUITE
SUITE DESCRIPTIONS
SUITE NUMBER SUITE NAME SUITE SIZE TYPE OF SUITE EXIT NUMBER
IRM SUITE
ROSTHETICS SUITE
IT DATA SUITE
GERIATRIC OFFICE
SUITE
HVAC SHOP SUITE
1,549 S.F.
3,610 S.F.
1,531 S.F.
1,776 S.F.
1,689 S.F.
NON PATIENT CARE 2
1,310 S.F.
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
NON PATIENT CARE
DATA CENTER
MB-100
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:1
A
M
G104
LIFE SAFETY PLAN EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
NTS
LIFE SAFETY PLAN
Revisions: Date:
144' TO EXIT
5,173 S.F.
OPEN OFFICE
MB-510
WORKROOM
MB-480
OFFICE
MB-482
STAFF UNIFORM
ROOM
MB-496
SOILED LINEN
MB-401
CORRIDOR
CB-50
CORRIDOR
MB-505
2 2
A401
OFFICE
MB-513
LOUNGE
MB-512
OFFICE
MB-514
OFFICE
MB-509
MECH. ROOM
MB-503
TOILET, MALE
MB-494
OFFICE
MB-492
OFFICE, CHIEF
MB-490
OFFICE
MB-486
OFFICE
MB-511
MECH. ROOM
MB-507
PER ASBESTOS LEAD SURVEY, ASBESTOS IS PRESENT IN
MB-511 AT THE TRANSITE HEAT SHIELD. COORDINATE ALL
ASBESTOS ABATEMENT WITH GC AND COR.
PER ASBESTOS LEAD SURVEY, ASBESTOS IS PRESENT IN
MB-100 AT THE COLUMN MASTIC. COORDINATE ALL
ASBESTOS ABATEMENT WITH GC AND COR.
AT THE COLUMN MASTIC. COORDINATE ALL ASBESTOS ABATEMENT WITH GC
AND COR, AND REFER TO SPECIFICATIONS FOR FURTHER INSTRUCTIONS. PER
ASBESTOS LEAD SURVEY, ASBESTOS IS PRESENT IN MB-100 AT THE COLUMN
MASTIC. COORDINATE ALL ASBESTOS ABATEMENT WITH GC AND COR.
PER ASBESTOS LEAD SURVEY, ASBESTOS
IS PRESENT IN MB-507 AT THIS LOCATION.
COORDINATE ALL ASBESTOS ABATEMENT
WITH GC AND COR.
A601
A601
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
DEMOLITION LEGEND
DEMOLITION KEYNOTES:
1. REMOVE DOOR, FRAME, HARDWARE, SILL AND JAMB. REMOVE WALL TO
WITHIN 6" OF EXISTING CEILING . REPAIR WALL AND PAINT TO MATCH
EXISTING WALL(S).
2. REMOVE WINDOW AND SEGMENT OF EXISTING WALL AS INDICATED IN
DRAWING(S). PREPARE WALL FOR INSTALLATION OF NEW DOOR.
3. EXISTING STRUCTURAL COLUMNS TO REMAIN.
4. REMOVE EXISTING DOOR, FRAME, HARDWARE, SILL AND JAMB. PATCH
OPENING TO MATCH EXISTING WALL.
5. LEVEL AND GRADE EXISTING FLOOR AND PREPARE FOR NEW CONCRETE
SLAB.
6. EXISTING CONCRETE MECHANICAL PAD TO BE REMOVED. PATCH AND FILL
TO MATCH EXISTING FLOOR. LEVEL TO MATCH EXISTING FLOOR GRADE.
7. PREP. FLOOR TO REPAIR HOLE ON EXISTING FLOOR SLAB.
DEMOLITION GENERAL NOTES:
1. PROTECT EXISTING MATERIALS TO REMAIN AT ALL TIMES THROUGHOUT
DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL PATCH AND REPAIR
ADJACENT SURFACES DAMAGED DURING CONSTRUCTION TO THE
SATISFACTION OF THE COR.
2. PRIOR TO COMMENCEMENT OF DEMOLITION AND CONSTRUCTION ACTIVITIES,
ALL DIMENSIONS SHOWN IN THESE DOCUMENTS SHALL BE VERIFIED. ANY
DISCREPANCIES BETWEEN PROPOSED WORK AND EXISTING CONDITIONS SHALL
IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE COR.
3. UTILITY SHUTDOWNS SHALL BE COORDINATED, IN WRITING, WITH THE COR NO
LESS THAN THREE (3) WEEKS PRIOR TO THE REQUIRED SHUTDOWN.
4. EXISTING WINDOWS AND FRAMES TO REMAIN SHALL BE PROTECTED DURING
DEMOLITION.
5. SEE PLUMBING, MECHANICAL, AND ELECTRICAL SHEETS FOR ADDITIONAL
DEMOLITION NOTES.
6. PROTECT EXISTING FLOORS, BASE, WALLS AND CEILINGS NOT INDICATED TO BE
DEMOLISHED. REPAIR ALL DAMAGE CAUSED BY DEMOLITION ACTIVITIES TO LIKE
NEW CONDITION. WALLS SHALL BE PAINTED CORNER TO CORNER/ EDGE TO
EDGE TO MATCH EXISTING.
7. THE CONTRACTOR SHALL PROVIDE AN EXCAVATION PLAN AND SHALL OBTAIN
COR APROVAL PRIOR TO COMMENCEMENT OF THE WORK. ALL EXCAVATION
SHALL BE DONE AFTER NOTMAL MEDICAL CENTER HOURS AS DIRECTED BY THE
COR. ALL DAMAGE TO SURFACES NOT INDICATED TO BE DEMOLISHED SHALL BE
REPAIRED.
X
KEY PLAN
WORK AREA
A401
DEMOLISH EXISTING METAL SCREEN & METAL EQUIPMENT FRAMING
COMPLETE. PREP ROOF FOR INSTALLATION OF NEW MECANICAL
EQUIPMENT. SEE MECHANICAL DRAWING(S) FOR NEW EQUIPMENT
LOCATIONS.
ASBESTOS MATERIALS INFORMATION:
Column Mastic
Transite Heat Shield
Pipe Insulation (Above Ceiling)
Pipe Fittings (Above Ceiling)
MB-100
MB-507 and MB-511
MB-507
MB-507 30 E.A.*
60 S.F.*
24 S.F.*
250 S.F.
SF – square feet LF – linear feet EA – Each *-Previous Asbestos Survey
MATERIAL DESCRIPTION LOCATION QUANTITY
NOTE:
The steam pipes to wall heaters should be considered ACM unless sampled and analyzed by ln accredited laboratory as there are pipe insulation present above the ceiling.
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:0
A
M
AD101
DEMOLITION PLAN EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
1/4" = 1'-0"1
FLOOR PLAN - DEMOLITION
1/8" = 1'-0"2
ROOF PLAN - DEMOLITION
ELEC. CLOSET
MB-501
OPEN OFFICE
MB-510
WORKROOM
MB-480
LEATHER
WORKROOM
MB-480B
OFFICE
MB-482
ELEC. CLOSET
MB-479A
STAFF UNIFORM
ROOM
MB-496
SOILED LINEN
MB-401
CORRIDOR
CB-50
CORRIDOR
MB-505
STAIRWELL NO.
S8
V
IF
VIF
56' - 5 3/4"
VIF
7' - 5 1/2"
V
IF
1' - 2"
/4
/4
1' - 2 1/4"
6 6
A401
7 8
B44
B44
B44
B44
B102 B102
B102 B102
A
B
DATA CENTER
MB-100
A401
A401
A401
A401
Sim
OFFICE
MB-515
OFFICE
MB-514
OFFICE
MB-513
LOUNGE
MB-512
PASSAGE
MB-511
OFFICE
MB-509
MECH. ROOM
MB-507
MECH. ROOM
MB-503
TOILET, MALE
MB-494
OFFICE
MB-492
OFFICE, CHIEF
MB-490
OFFICE
MB-486
VIF
13' - 2"
V
IF
/4
VIF
6' - 0 1/2"
B52 B52
A101
3' - 6 1/8"
9' - 10"
2' - 0"
1' - 6"
B102
P1
P1 P1
P1
P1P1
P3 P3
P3 P3
P3
P3
P3
P3
P3
P3
P3 (CEILING)
P3
P3
P3
P3
P1
P2 (CEILING)
CG
CG
CG CG
CG CG
B102
1' - 2"
BULKHEAD
A101
CG CG
B44
B44
NEW WORK GENERAL NOTES:
1. PROTECT EXISTING MATERIALS TO REMAIN AT ALL TIMES THROUGHOUT
DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL PATCH AND REPAIR
ADJACENT SURFACES DAMAGED DURING CONSTRUCTION TO THE SATISFACTION OF
THE COR.
2. PRIOR TO COMMENCEMENT OF DEMOLITION AND CONSTRUCTION ACTIVITIES, ALL
DIMENSIONS SHOWN IN THESE DOCUMENTS SHALL BE VERIFIED. ANY
DISCREPANCIES BETWEEN PROPOSED WORK AND EXISTING CONDITIONS SHALL
IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE COR.
3. UTILITY SHUTDOWNS SHALL BE COORDINATED, IN WRITING, WITH THE COR NO LESS
THAN THREE (3) WEEKS PRIOR TO THE REQUIRED SHUTDOWN.
4. SEE MECHANICAL, PLUMBING AND ELECTRICAL SHEETS FOR ADDITIONAL
DEMOLITION NOTES.
5. THE CONTRACTOR SHALL PROVIDE PLAN FOR BRINGING CONCRETE INTO THE
FACILITY AND OBTAIN COR APPROVAL PRIOR TO COMMENCEMENT OF THE WORK.
ALL CONCRETE WORK SHALL BE DONE AFTER NORMAL MEDICAL CENTER HOURS AS
DIRECTED BY THE COR. ALL DAMAGE TO SURFACES NOT INDICATED TO BE
DEMOLISHED SHALL BE REPAIRED.
NEW WORK KEYNOTES:
1. PATCH WALL AND 6' x 7' OPENING TO MATCH EXISTING.
2. PATCH WALL AND 3' x 7' OPENING TO MATCH EXISTING.
3. PATCH DAMAGED WALL, HEADER AND FLOOR. PAINT TO MATCH EXISTING WALLS.
COORDINATE WITH COR FLOORING TYPE/PATTERN FOR PATCH.
4. PATCH OPENING, FLOOR AND BASE TO MATCH EXISTING WALLS, FLOOR AND BASE.
5. NEW 1 HR FIRE RATED CHASE WALL.
6. NEW SLAB TO BE ALIGNED AND LEVELED WITH EXISTING SLAB. NO OBSTRUCTIVE
THRESHOLD.
7. INSTALL NEW 6' x 7' DOUBLE DOOR.
8. INSTALL NEW 3' x 7' SINGLE DOOR.
9. EXISTING STEEL STRUCTURAL COLUMNS TO BE BOXED IN WITH NEW 2HR FIRE
RATED CHASE WALLS. SEE DETAIL SHEET A-501.
10. EXISTING GWB CEILING TO REMAIN. REPAIR, PATCH AS NECESSARY. PAINT TO
COLOR INDICATED ON PLAN.
11. PATCH AND FILL TO MATCH EXISTING FLOOR. LEVEL TO MATCH EXISTING FLOOR
GRADE ONCE EXSITING CONCRETE PAD HAS BEEN REMOVED.
12. REPAIR HOLE ON EXISTING FLOOR SLAB.
X
KEY PLAN
WORK AREA
EXISTING CONSTRUCTION TO REMAIN
NEW CONSTRUCTION
RENOVATION LEGEND
1' - 2" 1' - 2"
EQ EQ EQ EQ
E Q
E Q
B52 B52
B52
B52
B52 B52
B52
B52
CG CG
CG CG CG CG
CGCG
ALIGN
ALIGN
PASSAGE
MB-511
8' - 0"
1 HR FIRE BARRIER
2 HR FIRE BARRIER
RATED WALL LEGEND
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:5
A
M
A101
FLOOR PLAN - NEW WORK EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
1/4" = 1'-0"1
FLOOR PLAN - NEW WORK
APPLICABLE CODES:
NFPA 101- LIFE SAFETY CODE (2021)
INTERNATIONAL BUILDING CODE (IBC) (2018)
NFPA 1- FIRE CODE (2018)
NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
NFPA 70 - NATIONAL ELECTRIC CODE
NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE
NFPA 75 - STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY
EQUIPMENT
NFPA 855 -STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE
SYSTEMS
NFPA 2001 - STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
CLASSIFICATION OF OCCUPANCY:
NFPA 101: 6.1.11.1 - USE OF SPACE IS BUSINESS.
NUMBER OF OCCUPANTS:
NFPA 101: TABLE 7.3.1.2- MAXIMUM PROBABLE NUMBER OF OCCUPANTS = 15
PERSONS.
FIRE PROTECTION:
BUILDING IS FULLY SPRINKLERED.
NUMBER OF MEANS OF EGRESS:
NFPA 101: 39.2.4 - TWO MEANS OF EGRESS ARE REQUIRED.
DETECTION AND ALARM:
FIRE ALARM AND DETECTION PROVIDED.
EMERGENCY LIGHTING:
EMERGENCY LIGHTING PROVIDED.
1" = 1'-0"2
ENLARGED COLUMN DETAIL PLAN
1/4" = 1'-0"3
CEILING AT PASSAGE MB-511
SEALANT WITH 1/2"
CONTROL JOINT FILLER
MATERIAL.
B44
EXISTING CEILING
NEW 1/2" GYP. CEILING
NEW 3 5/8" CFMS
FRAMING
B102
EXISTING CONC. SLAB.
STRUCTURE TO BE VERIFIED
BY THE G.C.
NEW FLOOR FINISH
PER SCHEDULE
EXISTING FOUNDATION WALL.
TO BE VERIFIED BY THE G.C.
VAPOR BARRIER
NEW 4" GRAVEL SUB BASE
EXISTING WALL. STRUCTURE
TO BE VERIFIED BY THE G.C.
EXISTING GRADE AND SUB BASE.
TO BE VERIFIED BY THE G.C.
NEW FLOOR FINISH
PER SCHEDULE
NEW BASE PER
SCHEDULE
NEW DOOR PER
SCHEDULE
#4@12" O.C.
3 #4 CONTINUOUS
X X X XXXX XXX
WIRE MESH
NEW 4" CONC. SLAB
ON GRADE
DOWEL, EPOXY (IN EXISTING
WALL) & BOND BREAKER (IN
NEW CONC. SLAB). TYPICAL TO
ALL NEW SLAB TO EXISTING
WALL CONNECTION ON THE
PERIMETER OF THE NEW CONC.
SLAB. @ 4' O.C.
ALIGN
A401
A401
Sim
A401
NEW WALL (TYPE B102)
NEW DOOR PER SCHEDULENEW WALL
(TYPE B102)
EXISTING BASE NEW BASE PER SCHEDULE EXISTING BASE
NEW WALL (TYPE B44)
100A 100B
NEW WALL (TYPE B102)
NEW DOOR PER SCHEDULENEW WALL (TYPE B102)
EXISTING WALL
EXISTING BASE NEW BASE PER SCHEDULE EXISTING BASE
NEW WALL (TYPE B44)
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:5
A
M
A401
INTERIOR ELEVATIONS, SECTIONS
AND DETAILS
EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
3/4" = 1'-0"1
SECTION A @ NEW DOOR (TYP.)
1/4" = 1'-0"2
INTERIOR ELEVATION
3/4" = 1'-0"3
ELEVATION @ DOUBLE DOOR
3/4" = 1'-0"4
ELEVATION @ SINGLE DOOR
RATING
-FIRE- -SOUND-
TEST # STC TEST #
SCALE: 1 1/2"=1'-0"
1 hr UL U499 35-39 ESTIMATED
FIRE RATED - ONE HOUR
WHERE INDICATED ON PLANS
WALL TYPE IDENTIFIERS
B44 4" SHAFT WALL STUDS = 5 5/8" WALL
B44 WALL TYPE
ACOUSTIC SEALANT, TYPICAL
(FIRE SEALANT @ FIRE
BARRIERS)
CONCRETE SLAB
C-H SHAFT WALL STUD
SOUND ATTENUATION INSULATION
INSULATION PER HEAD OF WALL TESTED DESIGN
(@ FIRE BARRIERS)
CONCRETE
FIRE SEALANT PER TESTED DESIGN
(@ FIRE BARRIERS)
1" GYPSUM BOARD LINER PANEL
5/8" GYPSUM BOARD.
BOTTOM
OF SLAB
FLOOR
PLAN SECTION
TOP OF WALL
C-H SHAFT WALL STUD TRACK ATTACHED TO FLOOR DECK
W/ 1-1/2" POWDER ACTUATED FASTENERS @ 24" O.C. - 4"
FROM ENDS - MINIMUM EMBEDMENT: 1-1/4".
STUD SIZE &
WALL TYPE
IDENTIFIER -
SEE BELOW
1/ 2"
1"
RATING
-FIRE- -SOUND-
TEST # STC TEST #
NONEHEAD OF WALL DESIGN
SCALE: 1 1/2"=1'-0"
0 hr - N/A N/A
NON RATED
5/8" GYPSUM BOARD
WALL TYPE IDENTIFIERS
B102 2 1/2" METAL STUDS
METAL TRACK ATTACHED TO
CONC FLR DECK W/ 1 1/2" POWDER
ACTIVATED FASTENERS @ 24" O.C. - 4" FROM
ENDS - MIN EMBEDMENT: 1 1/4"
METAL STUDS AT 16" O.C.
METAL STUD TRACK
ABOVE CEILING
BELOW CEILING
METAL STUD CLIP, ATTACHED TO
WALL, 32" O.C.
B102 WALL TYPE
FLOOR
SECTION AT TOP OF WALL
1/ 4"
2" 5/8"
/1 6"1/
2"
1/2"
/1 6"
2"
SCHEDULE
SEE DOOR 2"
7' -0
2"
G Y
P W
A
LL
SEE OPENING SCHEDULE
S E
E O
P E
N
IN
G S
C H
E D
U
LE
5/8" GYPSUM BOARD
33 MIL STUDS TO STRUCTURE ABOVE
6" HIGH X WIDTH OF WALL BOX
HEADER OFF 33 MIL MINIMUM
METAL STUDS
DOUBLE 33 MIL STUDS AT EACH JAMB BEYOND
1" GYPSUM BOARD LINER PANEL
STAGGER VERT JOINTS SO THEY OCCUR
OVER DIFFERENT STUDS ON OPPOSITE
SIDES OF PARTITION & STAGGER JOINTS
OF SECOND LAYER FROM FIRST LAYER
OVERLAP ENDS OF EACH LAYER OF
GYP BD AT CORNERS AS INDICATED
4'-0" 1'-4"
1" GYPSUM BOARD LINER PANEL
4' - 0"
1 HR FIRE BARRIER
2 HR FIRE BARRIER
WHERE A DOOR IS NOTED AS RATED, IT SHALL DESIGNATE A RATED ASSEMBLY WHICH SHALL INCLUDE DOOR, FRAME, HARDWARE AND ALL PARTS OF THE DOOR. ALL ITEMS MAKING UP THE TOTAL ASSEMBLY SHALL BE RATED AND/OR LISTED WITH TESTING AGENCY RECOGNIZED BY THE LOCAL GOVERNING BUILDING AUTHORITY AND WITH ALL COMPONENTS MEETING THE LABEL REQUIRMENTS FOR THAT RATING/LISTING.
NOTE: RATED DOORS
SUGGESTED HARDWARE LOCATIONS
LOCKSET/LATCH SET
DEAD BOLT
DOOR PULL
PUSH PLATE
PUSH BARS
HOSPITAL ARM PULLS
HOSPITAL LATCH
EXIT DEVICES
PUSH BAR
LEVER BAR
C/L OF LEVER
C/L OF BOLT
C/L OF GRIP
C/L OF PLATE
C/L OF BAR
C/L OF LOWER BASE
C/L OF LATCH
C/L OF TOUCH BAR
C/L OF CROSS BAR
-39 5/16" FROM FINISHED FLOOR
-42" WHERE NO DOOR KNOB
-44" WHERE DOOR KNOB
-42" FROM FINISHED FLOOR
-45" FROM FINISHED FLOOR
-40" FROM FINISHED FLOOR
-45" FROM FINISHED FLOOR
-45 3/4" FROM FINISHED FLOOR
-40" FROM FINISHED FLOOR
-36" FROM FINISHED FLOOR
NOTE: ALL CONDITIONS SHOWN ARE NOT NECESSARILY ON EVERY PROJECT.
TYPICAL DOOR
JAMB LOCATION
18" MIN UNO
HAS BOTH CLOSER & LATCH
12" MIN WHERE DOORNOTE:
1. APPLICABLE TO PENETRATIONS OF ALL
FIRE RATED MEMBRANES, IN ACCORDANCE
WITH NFPA 101. REFER TO
SPECIFICATIONS SECTION 07 84 00, FIRE
STOPPING SYSTEMS.
INSULATED PIPE
OR DUCT
FLOOR
FIRESTOP MATERIAL
3/4" APPROVED FIRESTOP
INSULATION WITH VAPOR
BARRIER
PIPE SLEEVE WHERE
SPECIFIED
1/4" ∅ ANCHOR ROD
FOR NEW CONSTRUCTION
WELD
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
MASONRY PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
3/4" APPROVED FIRESTOP
INSULATION WITH VAPOR BARRIER
DRYWALL PARTITION
INSULATED PIPE
OR DUCT
" 1"
6" 6"
6" 6"
6" 6"
2. G.C. TO APPLY UL TESTED SYSTEM.
SCHEDULE
SEE OPENING
S E
E O
P E
N
IN
G S
C H
E D
U
LE
2"
SCHEDULE
SEE DOOR 2"
7' -0
2"
G Y
P W
A
LL
RATING
-FIRE- -SOUND-
TEST # STC TEST #
HEAD OF WALL DESIGN
SCALE: 1 1/2"=1'-0"
2 hr UL U497 45-49
FIRE RATED - TWO HOUR
WHERE INDICATED ON PLANS
WALL TYPE IDENTIFIERS
B52 2 1/2" SHAFT WALL STUDS = 3 3/4" WALL
B52 WALL TYPE
5/8" GYPSUM BOARD - 2 LAYERS
C-H SHAFT WALL STUD
SOUND ATTENUATION INSULATION
FLOOR
PLAN SECTION
TOP OF WALL
C-H SHAFT WALL STUD TRACK ATTACHED TO FLOOR DECK
W/ 1-1/2" POWDER ACTUATED FASTENERS @ 24" O.C. - 4"
FROM ENDS - MINIMUM EMBEDMENT: 1-1/4".
ACOUSTIC SEALANT, TYPICAL
(FIRE SEALANT @ FIRE BARRIERS)
CONCRETE SLAB
1" GYPSUM BOARD LINER PANEL
SEE BELOW
STUD SIZE & WALL
TYPE INDENTIFIER -
1"
INSULATION PER HEAD OF WALL TESTED DESIGN
(@ FIRE BARRIERS)
CONCRETE
FIRE SEALANT PER TESTED DESIGN
(@ FIRE BARRIERS)
BOTTOM
OF SLAB
ESTIMATE
D
STI HW-D-0644
1/ 2"
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:5
A
M
A501
SCHEDULES & DETAILS EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
DOOR TYPE(S)FRAME TYPE(S)BUCK TYPE(S)
WALL TYPE(S)
B-1 F-1 D-1
1 1/2" = 1'-0"2
INTERIOR DOOR HEADER DETAIL- 8'-0" MAX OPENING
3/4" = 1'-0"1
TYPICAL DRYWALL RATED CORNER DETAIL
DOOR & FRAME SCHEDULE
DOOR
NO. ROOM NAME
DOOR FRAME
F
IR
E R
A T
IN
G
S T
C
H A
R D
W A
R E
S E
T
NOTESW
ID
T H
H E
IG
H
T
T H
IC
K
N E
S S
G L A
Z
IN
G
L O
U V
E R
P A
N E
L M
A T
E R
IA
L
D O
O R
T Y
P E
F R
A M
E M
A T
E R
IA
L
F R
A M
E T
Y P
E
B U
C K
T Y
P E
100A DATA CENTER 6' - 0" 7' - 0" 2" - - HM D-1 HM F-1 B-1 45min - SH-9.1 LEFT HAND REVERSE
(LHRA)
100B DATA CENTER 3' - 0" 7' - 0" 2" - - HM D-2 HM F-2 B-1 45min - SH-4B
FINISH SCHEDULE
ROOM
NUMBER ROOM NAME
FLOOR
FINISH
BASE
FINISH
WALL
FINISH
CEILING
FINISH NOTES / REMARKS
MB-100 DATA CENTER RESILIENT
TILE
FLOORING
RESILIENT
BASE
P1=
BENJAMIN
MOORE
EGGSHELL
JUTE AF-80
P2 =
BENJAMIN
MOORE FLAT
BLACK 2132-10
RESILIENT TILE ESD FLOORING REQUIRES
A COPPER GROUNDING STRIP TO BE
PLACED WITHIN ROOM. FOLLOW
MANUFACTURERS INSTRUCTIONS.
MB-507 MECH. ROOM - - P3=MATCH
EXISTING
P3=MATCH
EXISTING
ALL REPAIRS AND PATCHES TO BE
PAINTED P3 COMPLETE.
MB-511 PASSAGE - - P3=MATCH
EXISTING
P3=MATCH
EXISTING
ALL REPAIRS AND PATCHES TO BE
PAINTED P3 COMPLETE.
1" = 1'-0"4
PIPE PENETRATION DETAIL
D-2F-2
ALL MANUFACTURER MATERIALS ARE FOR BASIS OF DESIGN. ALTERNATIVES MAY BE SUGGESTED BY THE CONTRACTOR AND REQUIRE VA COR APPROVAL.
623 MASSACHUSETTS ST., SUITE 200
LAWRENCE, KS 66044
785-842-6464 www.pec1.com
PROFESSIONAL ENGINEERING CONSULTANTS, P.A.
PEC Project # 208106-005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
FULLY SPRINKLERED
B
IM
/2
-0
K C
V A
E H
R M
B ld g a n d
/K C
V A
M C
B a s e m e n t_
R
.r v t
/3 /2
:2
:0
A
M
A601
3D - ISOMETRIC DRAWINGS &
SECTIONS
EHRM Infrastructure Upgrades –
Data Center – Kansas City, MO
4801 E. LINWOOD BLVD. KANSAS CITY, MO 64128
589-21-706
11/04/2022 MM CR
100% FINAL BID
DOCUMENTS
ISOMETRIC VIEW A
ISOMETRIC VIEW B
1/4" = 1'-0"3
PRESENTATION SECTION 1
1/4" = 1'-0"4
PRESENTATION SECTION 2
THIS SHEET TO BE PRINTED/COPIED IN COLOR
SEISMIC RESTRAINTS:
THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL REMAIN REASONABLY OPERATIONAL IN THE CASE OF A SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT ON THE FLOOR AND ALL CONCRETE PADS SHALL BE FIXED RIGIDLY TO THE STRUCTURE. ALL ROTATING OR RECIPROCATING OR VIBRATING EQUIPMENT SHALL BE INSTALLED WITH EARTHQUAKE SNUBBERS TO LIMIT MOVEMENT. ALL HANGING EQUIPMENT, PIPING, AND DUCTWORK SHALL BE BRACED TO THE STRUCTURE. REFER TO SPECIFICATION SECTIONS 21 0548, 22 0548, AND 23 0548.
SHEET NUMBER
WHERE DRAWN
SECTION LETTER
SECTIONS DETAILS
FT-1
TYPICAL
EQUIPMENT
NUMBER
UNIQUE I.D.
(FAN TERMINAL NO. 1)
EQUIPMENT TYPE
(FT=FAN TERMINAL)
DRAWING SYMBOLS
GENERAL NOTES GENERAL DEMOLITION NOTES
B
M2.1 M3.6
M3.6
B
M2.1 M3.6
M3.6
1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND DIMENSIONS.
2. NO PIPING, DUCTWORK, ETC. SHALL PENETRATE STRUCTURAL MEMBERS.
3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS
REQUIRED TO ACCOMMODATE THE NEW WORK.
4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF
SMOKE AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE REQUIREMENTS. SEE ARCHITECTURAL
DRAWINGS FOR LOCATIONS.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXACT LOCATION, CONFIGURATION AND ROUTING OF EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION DURING THE PROJECT TO PREVENT DAMAGE
DURING DEMOLITION AND PHASING.
6. REMOVE ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING THAT IS NOT REQUIRED FOR A WORKING
INSTALLATION.
7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
8. UNLESS OTHERWISE INDICATED, INSTALL ALL SPACE THERMOSTATS AND OTHER OCCUPANT ADJUSTABLE
CONTROL DEVICES SAME HEIGHT AS ADJACENT LIGHT SWITCHES, BUT IN NO CASE HIGHER THAN 48 INCHES ABOVE FINISHED FLOOR PER ADA REQUIREMENTS. COORDINATE EXACT HEIGHT WITH ARCHITECT PRIOR TO
INSTALLATION.
9. ALL CUTTING AND PATCHING SHALL BE CLOSELY COORDINATED WITH THE G.C.
10. COORDINATE ROUTING OF PLUMBING, AND HVAC PIPING WITH DUCTWORK, LIGHTS, ARCHITECTURAL CEILING
AND STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP, JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS. DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE GRADE MUST BE MAINTAINED FOR DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE CONFLICTS RISING FROM LACK OF
COORDINATION SHALL NOT JUSTIFY AN INCREASE IN THE CONTRACT AMOUNT.
11. ALL DIFFUSERS ARE 4-WAY BLOW UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
12. FLEXIBLE DUCTWORK IS ALLOWED ON RUNOUTS TO SUPPLY DIFFUSERS ONLY. UTILIZE ONLY ABOVE LAY-IN
ACCESSIBLE CEILINGS. DO NOT INSTALL FLEX DUCT ABOVE HARD CEILINGS OR WHERE EXPOSED. A MAXIMUM
LENGTH OF 6'-0" MAY BE USED AT EACH CONNECTION.
13. SEAL DUCTWORK AS CALLED OUT BELOW USING HARDCAST DT TAPE AND FTA-20 ADHESIVE OR HARDCAST
AFG-1402 "FOIL GRIP" PER MANUFACTURERS INSTRUCTIONS.
TYPE OF DUCT APPLY TO JOINTS
EXHAUST DUCT (ROUND OR RECT) TRANSVERSE AND LONGITUDINAL
MEDIUM VELOCITY (ROUND) TRANSVERSE AND LONGITUDINAL
MEDIUM VELOCITY (RECTANGULAR) TRANSVERSE AND LONGITUDINAL
LOW VELOCITY SUPPLY AND RETURN (RECT) TRANSVERSE AND LONGITUDINAL
LOW VELOCITY SUPPLY (ROUND) TRANSVERSE AND LONGITUDINAL
14. INSTALL BALANCE DAMPER WITH STANDOFF AND LOCKING QUADRANT IN AN ACCESSIBLE LOCATION AT EACH RUNOUT TO SUPPLY DIFFUSERS, EXHAUST GRILLES, AND RETURN GRILLES WHERE AIRFLOW IS INDICATED, OR
AS INDICATED OTHERWISE.
15. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE FIRE STOPPED BY THE TRADE MAKING THE PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR REQUIREMENTS.
16. DO NOT ROUTE PIPING OR DUCTWORK OVER ELECTRICAL PANELS OR EQUIPMENT. PIPING OR DUCTWORK SHALL NOT BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM ROOMS OR ELEVATOR EQUIPMENT ROOMS UNLESS SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C. PROVIDE WATERTIGHT DRIP PAN WITH
DRAIN TO NEAREST APPROVED RECEPTOR WHERE REQUIRED.
17. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN CONSTRUCTION REQUIRED FOR ACCESS TO
MECHANICAL EQUIPMENT WITH G.C.
18. COORDINATE SIZE AND LOCATION OF MECHANICAL EQUIPMENT PADS WITH G.C.
19. ALL WORK IS TO…
This is the start of the file's text. The full file is on GovTribe.