This document is an attachment to a solicitation for the GAOA SOUTH DAKOTA BRIDGE REPLACEMENTS contract. It contains a Contract Price Schedule that lists the pay items and associated unit costs for two bridge replacement projects - the Horse Camp Bridge Site (GAOA) and the Englewood Bridge Site (Non-GAOA).

The pay items include Geotechnical Investigation, Hydraulic Analysis, and Bridge Design, Removal and Construction, all to be priced on a Lump Sum basis. The total price for the Horse Camp Bridge Site is provided, as well as the total price for the Englewood Bridge Site. The overall total for both bridge replacement projects is also included.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

GAOA SOUTH DAKOTA BRIDGE REPLACEMENTS
Solicitation 140L0624R0025
CONTRACT PRICE SCHEDULE

Contractor:

Horse Camp Bridge Site (GAOA)
Pay ItemPay UnitUnit Cost
1 - Geotechnical InvestigationLump Sum
2 - Hydraulic Analysis, includes surveyLump Sum
3 - Bridge Design, Removal and Construction, includes site surveyLump Sum
Subtotal
Englewood Bridge Site (Non-GAOA)
Pay ItemPay UnitUnit Cost
1 - Geotechnical InvestigationLump Sum
2 - Hydraulic Analysis, includes surveyLump Sum
3 - Bridge Design, Removal and Construction, includes site surveyLump Sum
Subtotal
TOTAL