Attachment_2_-_Horse_Camp_Bridge_Insp_Rpt_2022.pdf

PDF 10 MB Posted

Attached to
GAOA SOUTH DAKOTA BRIDGE REPLACEMENTS
Solicitation number
140L0624R0025
Issued by

About this file

The provided document is a Bridge Inspection Report for the Horse Camp Bridge. The report details the findings from an inspection of the bridge conducted in 2022. It includes an overview of the bridge's condition, identification of required repairs, and recommendations for maintenance and rehabilitation. The report provides technical details on the structural elements inspected, any deficiencies noted, and the overall structural rating and sufficiency of the bridge. This information is relevant to the GAOA SOUTH DAKOTA BRIDGE REPLACEMENTS solicitation, which seeks design-build services for bridge replacement projects in South Dakota.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .