Attachment 7 Chemical Delivery Requirements
Supporting Product Application Feed From Location
Container Size
Delivery Method
Building 11 CUP Cooling Tower Inhibitor
Chiller Sub Basement
3,000 gallon bulk tank
Tanker Truck
Building 11 CUP Closed Loop Inhibitor
Chiller Sub Basement
3,000 gallon bulk tank
Tanker Truck
Building 11
CUP
Cooling Tower Non- Oxidizing Biocide
Chiller Sub Basement
1,500 gallon bulk tank
Tanker Truck
Building 11 CUP CLO2 Precursor
Chiller Sub Basement
3,150 gallon bulk tank
Tanker Truck
Building 11 CUP CLO2 Precursor
Chiller Sub Basement
3,150 gallon bulk tank
Tanker Truck
Building 11 CUP CLO2 Precursor
Chiller Sub Basement
3,150 gallon bulk tank
Tanker Truck
Building 11
CUP
Closed Loop Adjunct Inhibitor
Chiller Sub Basement
140 gallon tank
Drum Transfer
Building 11
CUP
Closed Loop Adjunct Inhibitor
Chiller Sub Basement
250 gallon container
Drum Transfer
Building 11
CUP BLUE DYE
Chiller Sub Basement 55 gallons Drum
Building 11 CUP Blowdown Neutralization Chiller Ground 55 gallons Drum
Building 11 CUP Blowdown Neutralization Chiller Ground 55 gallons Drum
Building 11
CUP
Condensate Polisher Resin Cleaner Boiler Ground 55 gallons Drum
Building 11 CUP Boiler Oxygen Scavenger Boiler Basement
300 gallon tank
Drum Transfer
Building 11 CUP Boiler Internal Treatment Boiler Basement
300 gallon tank
Drum Transfer
Building 11 CUP Boiler Amine Boiler Basement
300 gallon tank
Drum Transfer
Building 11 CUP RO pH adjustment Boiler Basement
540 gallon bulk tank
Tanker Truck
Building 11 CUP RO Bisulfite Boiler Basement
175 gallon tank (2 each)
Drum Transfer
Building 11 CUP RO Antiscalant Boiler Basement
175 gallon tank
Drum Transfer
Building 11 CUP RO Biocide Boiler Basement 55 gallons Drum
Building 11 CUP RO Cleaner Boiler Basement 55 gallons Drum
Building 11 CUP RO Cleaner Boiler Basement 55 gallons Drum
Building 11 CUP RO Cleaner Boiler Basement 50lb pail Pail
Building 11
CUP
Solid Biocide for cooling tower treatment Tower level 50lb pail Pail
Attachment 7 Chemical Delivery Requirements
Supporting Product Application Feed From Location
Container Size
Delivery Method
Building 11
CUP
Solid Biocide for cooling tower treatment Tower level 50lb pail Pail
Building 11 CUP Cooling Tower System Layup VARIOUS in plant 55 gallons Drum
Building 11 CUP Cooling Tower System Layup VARIOUS in plant 55 gallons Drum
Building 11 CUP Boiler Layup In Boilers 5lb rolls 5lb roll
COGEN Boiler Oxygen Scavenger Cogen Ground 165 gallon tank
Drum Transfer
COGEN Boiler Internal Treatment Cogen Ground 165 gallon tank
Drum Transfer
COGEN Boiler Amine Cogen Ground 165 gallon tank
Drum Transfer
* Plan is to convert these to Bulk tanks with Tanker transfer.