Attachment_6_Wage_Determination_ND20250046.pdf
PDF 2 MB Posted
- Attached to
- REMOVE/REPLACE DOORS BIE BUS GARAGE TMES Federal contract opportunity
- Solicitation number
- 140A2325R0038
About this file
This document is a Davis-Bacon Wage Determination for Heavy Construction Projects in North Dakota, covering multiple counties. The wage determination provides hourly rates and fringe benefits for various construction trade classifications, including carpenters ($35.87 with 25.10% fringe), electricians ($44.98 with 13.21-11.5% fringe), power equipment operators (ranging from $32.25-$35.05 with 20.65-21.60% fringe), truck drivers ($32.25 with 20.65% fringe), ironworkers ($39.80 with 24.47% fringe), and laborers (ranging from $22.74-$23.05 with minimal to no additional fringe benefits). The document outlines prevailing wage requirements under Executive Orders 14026 and 13658, specifying minimum wage rates for workers on federal construction contracts entered into on or after specific dates, with provisions for paid sick leave and worker protections.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_8_TORFPQuestions_and_Answers_Log_TATCo_0001.xlsx | XLSX spreadsheet | |
| Sol_140A2325R0038_Amd_0001.pdf | ||
| Attachment_1_Statement_of_Work_06_11_2025_0001.doc | DOC document | |
| Attachment_5_SF1413_Statement_and_Acknowledgement.pdf | ||
| Attachment_1_Statement_of_Work_-_Turtle_Elementary_Garage_Doors.doc | DOC document | |
| Sol_140A2325R0038.pdf | ||
| Attachment_8_TORFPQuestions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| Attachment_3_SF25_Performance_Bond.pdf | ||
| Attachment_4_SF25A_Payment_Bond.pdf | ||
| Attachment_7_IA_-_IEE_Representation_Form.pdf | ||
| Attachment_2_SF24_Bid_Bond.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .