This combined synopsis/solicitation seeks a contractor to replace the emergency power generator day tank at the West Los Angeles VA Medical Center. The contractor must provide all required equipment, supplies, and personnel to complete replacement of the 100-gallon day tank for the CAT Model 3516 generator by June 18, 2024. Interested service-disabled veteran-owned small businesses should provide pricing to remove the existing tank, install the replacement tank ensuring proper connection and operation with the main fuel tank, and supply and install all associated pumps, piping, and electrical components. Quotes are due by February 8, 2024 and the award will be made based on price and other factors to the response most advantageous to the government. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
As of December 7th, 2023
1. Contract Title: Replacement of CAT Emergency Power Generator Day Tank
2. Background:
VA Greater Los Angeles Healthcare System (VAGLAHS), West Los Angeles VA Medical Center requires replacement of a generator day tank and ensure the day tank is operating properly with the main tank during operations.
3. Scope:
The contractor shall provide required supplies, equipment, and personnel needed to complete the replacement of the generator day tank located at the West Los Angeles VA Medical Center. The generator day tank must be connected and operating with main tank during operations. Contractor shall provide all required items for the requirement described in this statement of work. Contractor shall provide equipment, supplies, and perform work in strict accordance with the Specifications, Statement of Work, schedule, and all other supporting documents required for this contract.
4. Tasks:
The following tasks shall be performed within the West Los Angeles VA Medical Center for the associated building.
4.1 Building 12
• Ensure Tank UL 142 standards are met (flammable and combustible liquid storage)
• Provide and replace 100-gallon emergency power day tank for CAT (Caterpillar) Model 3516, Make AA, Serial SFJ00157.
• Ensure day tank is connected and operating properly with the main tank during operations.
• Installation of supply pump system with float switched and alarms for proper operations;
including pumps, piping, electrical components, electrical wiring, and any miscellaneous items
• Barricade and Secure Work Areas.
• Removal of previous day tank.
• Removal of all barricades and debris.
• Provide On-Site Documentation of Work performed
5. Place of Performance:
Department of Veteran Affairs Greater Los Angeles VA Healthcare System West Los Angeles VA Medical Center
Building 12 11301 Wilshire Blvd.
Los Angeles, CA 90073 – 1003
6. Period of Performance:
02/19/2024 – 06/18/2024
Work Hours:
Contractor shall perform the following work at the VA Los Angeles Healthcare System during normal working hours (i.e., 8:00 a.m. – 4:00 p.m.) during normal workday (one day, M-F).
Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building.
Work performed outside the normal hours of coverage must be approved by the COR or his/her designee.
All time shall be approved in advance by the Contracting Officer’s Representative (COR). Allow 5-days for approval of any alternate working hours needed.
Federal Holidays
New Year’s Day January 01 Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 04 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.
7. Regulatory Requirements:
Tank must meet Applicable Codes and Standards:
• CBC 2022
• CEC 2022
• CMC 2022
• CFC 2022
• NFPA 30 (2021)
• NFPA 37 (2018)
• NFPA 55 (2019)
• NFPA 99 (2021)
• NFPA 110 (2019)
• NFPA 704 (2017)
8. Security Requirements:
The C&A requirements do not apply, and Security Accreditation Package is not required.
This service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.
9. Changes:
Only those services specified herein are authorized, before performing any service of non-contract nature, the Contractor shall advise the Contracting Officer of the reasons for the additional work. Changes to the resulting contract are not authorized, unless in writing by the Contracting Officer.
10. Identification, Check-in, Parking, and Smoking Regulations
Identification
The vendor's employees shall wear visible identification at all times while on VAGLAHCS premises.
Contractor employees shall report to VA Police upon entry to the VAGLAHCS facility to get a visitor badge. Contractor employees are required to be escorted by the COR or designee’s office once on campus prior to commencement of work. During emergencies contractor personnel shall check in with VAGLAHCS Police if the VAGLAHCS COR or designee is not available.
Parking
It is the responsibility of the contract personnel to park in the appropriate designated parking areas.
Parking information is available from VA Police & Security Service Office. The Contractor assumes full responsibility for any parking violations.
Smoking
Veterans Health Administration (VHA) Directive 1085, dated March 5, 2019, provides a comprehensive smoke-free policy for patients, visitors, contractors, volunteers, and vendors, at the Department of Veterans Affairs (VA), Veterans Health Administration (VHA) health care facilities.
This updated VHA directive implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities, as defined in this directive, based on scientific evidence regarding the adverse health effects of secondhand and thirdhand smoke exposures.
The Assistant Deputy Under Secretary for Health for Administrative Operations (10NA) and the Assistant Deputy Under Secretary for Health for Clinical Operations (10NC) are responsible for the contents of this directive. Questions may be referred to VHA Smoke Free: vhasmokefree@va.gov.
This VHA directive is scheduled for recertification on or before the last working day of March 2024.
This VHA directive will continue to serve as national VHA policy until it is recertified or rescinded.
Weapons and Contraband
Possession of weapons or contraband is prohibited and shall be subject to arrest and termination from future performance under this contract. Enclosed containers, including tool kits, shall be subject to search. Violations of VAGLAHCS regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
Safety
All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VAGLAHCS shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract.
Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Every effort shall be made to safeguard human life and property.
Contractor shall comply with all applicable Federal, State, and local requirements regarding workers’ health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137.
Contractor shall provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely.
11. Contractor Personnel Contractor’s Program Manager
The Contractor shall provide a contract program manager who shall be responsible for the performance of the work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor’s Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
Contractor’s Employees
The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC).
12. Contractor Qualifications & Other Responsibilities
Contractor shall have a minimum of five (5) years’ experience servicing and replacing generator day tank systems for emergency power generators.
Contractor shall have a minimum of five (5) years’ experience working on CAT (Caterpillar) diesel engine fuel systems.
License requirements:
Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government.
The Government reserves the right to accept or reject Contractor’s employee for the rendering of services.
Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer.
13. Insurance Coverage
The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee’s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.
The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.
Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.
Contractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.
14. Invoicing
Invoices
Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes.
The Government shall not authorize payment until such time that the VAGLAHCS COR all properly executed and signed documentation.
No advance payments shall be authorized. Payment shall be made on a monthly arrears for services provided during the billing month in arrears in accordance with FAR 52.212-4, para. (i). Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.
Payment of invoices may be delayed if the appropriate invoices as specified in the contract are not completed and submitted as required.
8. Security Requirements: