This document is a combined synopsis and solicitation for the replacement of an emergency power generator fuel tank located at the Greater Los Angeles VA Healthcare System West Los Angeles VA Medical Center. The solicitation seeks a contractor to remove the existing day tank and replace it with a new CAT Model 3516 generator fuel tank. Interested service-disabled veteran-owned small businesses must provide pricing for the line item of replacing the tank by June 18, 2024. Quotes are due by February 8, 2024 and will be evaluated based on price and other factors. The award will be made to the response most advantageous to the Department of Veterans Affairs. The solicitation is set aside for 100% service-disabled veteran-owned small businesses and has an associated NAICS code of 811310 with a small business size standard of $12.5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment Questions and Answers
1. Q & A response #2 calls for a 15 GPM pump. Should this be 1.5GPM? 15 gallons per minute would result in a 900 GHP fuel load and those specifications cannot be met.
The 15 GPM is to refill the day tank which is the rate that the tank was refilled before the pumps had an issue with the current system. Pumps are not meant to run continuously only for the period of time it takes to refill tank which could be a couple of minutes. Analog pressure gauges should be installed pre and post fuel filters for day tank to confirm flow rate.
The refill pump needs to include electrical logic to shut down the pump after the day tank is filled that is redundant in the event the tank level indicator fails and prevents the pump from overfilling the tank.
2. What permits are required for the project? Is all permitting done through the VA, or is the Local CUPA involved in permitting the tank installation?
The double wall tank needs to be lifted and pass through the entrance door to be placed adjacent to generator. Safety will review the plan for placing the tank within the building.
3. Do HCAI/OSHPD standards apply?
As this is a day tank permitting by the city is not required.