This is an appendix document containing project overview maps and a fiber/conduit layout diagram for the Paradise Fiber/Conduit Install Project at Mount Rainier National Park, managed by the National Park Service (NPS) Telecommunications Program located in Ashford, Washington. The document does not constitute a solicitation or contractual requirement but rather serves as a reference guide for understanding the scope of work to be completed.
The project involves installing fiber optic cables and conduit infrastructure throughout the Paradise area of Mount Rainier National Park. Key infrastructure components include twelve vaults (handholes), multiple building penetrations at the Jackson Visitor Center, Ski Dorm, Glacier Dorm, and Wastewater Treatment Plant, and approximately 475 to 1,700 linear feet of new and existing conduit pathways. The work requires installation of various conduit sizes (1x2", 1x3", 2x2") in both Schedule 40 and Schedule 80 specifications, with both new installation and utilization of existing vacant conduits. Cable specifications include single-mode fiber (1x48F SM, 2x12F SM, and 1x12F SM configurations) distributed across multiple vault connections. All conduit paths must include pull tape with weaved-in tracer wire for future use and cable location. The layout diagrams indicate approximate distances and note that vendors must verify measurements for accuracy. The project encompasses connections from the JVC basement cage through multiple vaults to serve the Ski Dorm, Glacier Dorm, and Wastewater Treatment Plant facilities.
View the file
Other files for this federal contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Paradise Picnic Area Comfort
Station
Paradise Ski Tow Powerhouse
Paradise Employee Ski Dorm
Paradise Guide House
Paradise Old Ranger Station
Paradise Glacier Dorm
Paradise "Slate" Parking Lot Comfort Station
Paradise Picnic Area Comfort
Station
Paradise Picnic Area Comfort
Station
Paradise Waste Water
Treatment Plant
Paradise Picnic Area Comfort
Station
Paradise Jackson Visitor Center
Maintenance Shed
2x 2"
Sc h8
Co nd ui t -
NE
W
2x2" Sch40
Conduit - NEW
1x2" Sch80 Conduit
- EXISTING
1x2" Sch80 Conduit- EXISTING
PROJECT START
Ski Dorm Penetration
Glacier Dorm Penetration
Vault 1
Vault 2
Vault 3
Vault 4
Vault 5
Vault 6
Vault 7 Vault 8Vault 9
Vault 10
Vault 11
Vault 12
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Misc Points Building Penetration
Project Start
Conduit Path 1x2" Sch40 Conduit -
NEW
1x2" Sch80 Conduit -
EXISTING
1x3" Sch80 Conduit -
EXISTING
2x2" Sch40 Conduit -
NEW
2x2" Sch80 Conduit -
NEW
National Park Service Mount Rainier National Park Paradise Fiber/Conduit Install Project Appendix - Project Overview Map
Paradise Jackson Visitor Center
1x 3"
Sc h8
Co nd ui t
EX
IS
T
IN
G
2x 2"
Sc h8 0 Co nd uit
- NEW
1x 2"
Sch
Con du it
- EX
IST
ING
1x2" Sch80 Conduit
- EXISTING
PROJECT START
Vault 1
Vault 2
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Misc Points Building Penetration
Project Start
Conduit Path 1x2" Sch40 Conduit -
NEW
1x2" Sch80 Conduit -
EXISTING
1x3" Sch80 Conduit -
EXISTING
2x2" Sch40 Conduit -
NEW
2x2" Sch80 Conduit -
NEW
National Park Service Mount Rainier National Park
Appendix - Project Overview - Section A
Paradise Employee Ski Dorm
Paradise Glacier Dorm
Maintenance Shed
1x2" Sch
Conduit
N
EW
2x 2"
Sc h8
Co nd ui t -
NE
W
1x2" Sch80 Conduit
- EXISTING
1x 2"
Sc h8
0 Co nd uit
- EX
IS
TIN
G
2x2" Sch40
Conduit - NEW
2x2" Sch40 Conduit - NEW
Ski Dorm Penetration
Glacier Dorm Penetration
Vault 2
Vault 3
Vault 7 Vault 8
Vault 9
Vault 10
Vault 11
Vault 12
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Misc Points Building Penetration
Project Start
Conduit Path 1x2" Sch40 Conduit -
NEW
1x2" Sch80 Conduit -
EXISTING
1x3" Sch80 Conduit -
EXISTING
2x2" Sch40 Conduit -
NEW
2x2" Sch80 Conduit -
NEW
National Park Service Mount Rainier National Park
Appendix - Project Overview - Section B
Paradise Picnic Area Comfort
Station
Paradise Employee Ski Dorm
Paradise Glacier Dorm
Paradise Picnic Area Comfort
Station
Paradise Picnic Area Comfort Station
Paradise Waste Water
Treatment Plant
Paradise Picnic Area Comfort Station
Paradise Jackson
Visitor Center
Maintenance Shed
2x 2"
Sc h8
Co nd ui t -
NE
W
2x2" Sch40
Conduit - NEW
1x2" Sch80 Conduit
- EXISTING
1x2" Sch80 Conduit- EXISTING
1x 2"
Sc h8
Co nd u it
EX
IS
TI
NG
PROJECT START
Ski Dorm
Penetration
Glacier Dorm Penetration
Vault 1
Vault 2
Vault 3
Vault 4
Vault 5
Vault 6
Vault 7 Vault 8Vault 9
Vault 10
Vault 11
Vault 12
Microsoft, Vantor, Park Tiles Team
National Park Service Mount Rainier National Park Paradise Fiber/Conduit Install Project Appendix - Project Overview - Section C
Legend
Handholes Existing Handhole
New Handhole
Misc Points Building Penetration
Project Start
Conduit Path 1x2" Sch40 Conduit -
NEW
1x2" Sch80 Conduit -
EXISTING
1x3" Sch80 Conduit -
EXISTING
2x2" Sch40 Conduit -
NEW
2x2" Sch80 Conduit -
NEW
Vault 7
1" = 1 1
1- -
Paradise Conduit/Fiber Install
Hicks, Casey A 27 JUN 2026
NPS MORA IT/
Telecom Program
55210 238 th
Ave E
Ashford, WA 98304
360-569-6555
SOW Appendix
Fiber/Conduit Layout Diagram
1" = 1 1
1- -
Paradise Conduit/Fiber Install
Hicks, Casey A 27 JUN 2026
NPS MORA IT/
Telecom Program
55210 238 th
Ave E
Ashford, WA 98304
360-569-6555
SOW Appendix
Fiber/Conduit Layout Diagram
B
SCALE
SIZE
SHEET OF
REVFSCM NO DRAWING NUMBER
DRAWING TITLE
PROJECT
DRAWN BY DATE
COMPANY
C DBA
C DBA
B
SCALE
SIZE
SHEET OF
REVFSCM NO DRAWING NUMBER
DRAWING TITLE
PROJECT
DRAWN BY DATE
COMPANY
C DBA
C DBA
NOTES:
Statement of Work supersedes this drawing. This drawing is intended to provide clarity in the work to be completed, but is not intended to deviate from what has been contractually obligated within the Statement of
Work. Any discrepancies shall be brought to the attention of the COR & Project Lead.
All conduit paths shall include pull tape with weaved-in tracer wire for future use and so cable can be located.
P003 – JVC Basement Cage Vault 1
Outside JVC Vault 3 Vault 4 Vault 5
Vault 8
Vault 12
Ski Dorm
Glacier Dorm
Mech. Room
Boiler Room
ALL DISTANCES LISTED ARE APPROXIMATE. Vendors will need to wheel their own measurements if more accuracy is required.
To WWTP
To Ski Dorm
To Glacier Dorm
Vault 2
Vault 6
Next to
WWTP
B
SCALE
SIZE
SHEET OF
REVFSCM NO DRAWING NUMBER
DRAWING TITLE
PROJECT
DRAWN BY DATE
COMPANY
C DBA
C DBA
B
SCALE
SIZE
SHEET OF
REVFSCM NO DRAWING NUMBER
DRAWING TITLE
PROJECT
DRAWN BY DATE
COMPANY
C DBA
C DBA
1x48F SM Leave ~400 ft coiled up in vault for future use
Vacant 3" Existing Conduit ~75 ft
Vacant 2" Existing Conduit ~650 ft
Vacant 2" Existing Conduit ~1500 ft
NEW 2x2" Sch 80 Conduit ~475 ft
Install both cables in one conduit
2x12F SM
Bore Under Main Road at Lower Parking Lot Intersection
2x12F SM
Vault 9
1x48F SM + 2x12F SM
Vacant 2" Existing Conduit ~800 ft
Vacant 2" Existing Conduit ~1100 ft
Vacant 2" Existing Conduit ~1700 ft
1x48F SM1x48F SM1x48F SM1x48F SM 1x48F SM + 2x12F SM
NEW 2x2" Conduit ~75 ft
Install both cables in one conduit
2x12F SM NEW 2x2" Conduit
~500 ft Install both cables in one conduit
Vault 10
2x12F SM NEW 2x2" Conduit
~500 ft Install both cables in one conduit
Lower Parking Lot Below Rock Wall
Lower Parking Lot Below Rock Wall
Along Main Road Shoulder Across From Lower Parking Lot
Vault 11
2x12F SM NEW 2x2" Conduit
~500 ft Install both cables in one conduit
Between Lower Parking Lot & Ski Dorm
1x12F SM
NEW 1x2" Conduit ~75 ft
1x12F SM
NEW 1x2" Conduit ~250 ft
NEW 1x2" Conduit ~50 ft
1x12F SM
| Paradise Project Overview Map |
| Paradise Section A |
| Paradise Section B |
| Paradise Section C |
| Layout Diagram |
| Layout Diagram.vsdx |
| Phase 2 Diagram |
File details come from the government source that posted it. Updated .