Attachment_6_SOW_Appendix_A_5pgs.pdf

PDF 3 MB Posted

Attached to
MORA-PARADISE FIBER INSTALL Federal contract opportunity
Solicitation number
140P8326Q0055
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This is an appendix document containing project overview maps and a fiber/conduit layout diagram for the Paradise Fiber/Conduit Install Project at Mount Rainier National Park, managed by the National Park Service (NPS) Telecommunications Program located in Ashford, Washington. The document does not constitute a solicitation or contractual requirement but rather serves as a reference guide for understanding the scope of work to be completed.

The project involves installing fiber optic cables and conduit infrastructure throughout the Paradise area of Mount Rainier National Park. Key infrastructure components include twelve vaults (handholes), multiple building penetrations at the Jackson Visitor Center, Ski Dorm, Glacier Dorm, and Wastewater Treatment Plant, and approximately 475 to 1,700 linear feet of new and existing conduit pathways. The work requires installation of various conduit sizes (1x2", 1x3", 2x2") in both Schedule 40 and Schedule 80 specifications, with both new installation and utilization of existing vacant conduits. Cable specifications include single-mode fiber (1x48F SM, 2x12F SM, and 1x12F SM configurations) distributed across multiple vault connections. All conduit paths must include pull tape with weaved-in tracer wire for future use and cable location. The layout diagrams indicate approximate distances and note that vendors must verify measurements for accuracy. The project encompasses connections from the JVC basement cage through multiple vaults to serve the Ski Dorm, Glacier Dorm, and Wastewater Treatment Plant facilities.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Paradise Picnic Area Comfort

Station

Paradise Ski Tow Powerhouse

Paradise Employee Ski Dorm

Paradise Guide House

Paradise Old Ranger Station

Paradise Glacier Dorm

Paradise "Slate" Parking Lot Comfort Station

Paradise Picnic Area Comfort

Station

Paradise Picnic Area Comfort

Station

Paradise Waste Water

Treatment Plant

Paradise Picnic Area Comfort

Station

Paradise Jackson Visitor Center

Maintenance Shed

2x 2"

Sc h8

Co nd ui t -

NE

W

2x2" Sch40

Conduit - NEW

1x2" Sch80 Conduit

- EXISTING

1x2" Sch80 Conduit- EXISTING

PROJECT START

Ski Dorm Penetration

Glacier Dorm Penetration

Vault 1

Vault 2

Vault 3

Vault 4

Vault 5

Vault 6

Vault 7 Vault 8Vault 9

Vault 10

Vault 11

Vault 12

Microsoft, Vantor, Park Tiles Team

Legend

Handholes Existing Handhole

New Handhole

Misc Points Building Penetration

Project Start

Conduit Path 1x2" Sch40 Conduit -

NEW

1x2" Sch80 Conduit -

EXISTING

1x3" Sch80 Conduit -

EXISTING

2x2" Sch40 Conduit -

NEW

2x2" Sch80 Conduit -

NEW

National Park Service Mount Rainier National Park Paradise Fiber/Conduit Install Project Appendix - Project Overview Map

Paradise Jackson Visitor Center

1x 3"

Sc h8

Co nd ui t

EX

IS

T

IN

G

2x 2"

Sc h8 0 Co nd uit

- NEW

1x 2"

Sch

Con du it

- EX

IST

ING

1x2" Sch80 Conduit

- EXISTING

PROJECT START

Vault 1

Vault 2

Microsoft, Vantor, Park Tiles Team

Legend

Handholes Existing Handhole

New Handhole

Misc Points Building Penetration

Project Start

Conduit Path 1x2" Sch40 Conduit -

NEW

1x2" Sch80 Conduit -

EXISTING

1x3" Sch80 Conduit -

EXISTING

2x2" Sch40 Conduit -

NEW

2x2" Sch80 Conduit -

NEW

National Park Service Mount Rainier National Park

Appendix - Project Overview - Section A

Paradise Employee Ski Dorm

Paradise Glacier Dorm

Maintenance Shed

1x2" Sch

Conduit

N

EW

2x 2"

Sc h8

Co nd ui t -

NE

W

1x2" Sch80 Conduit

- EXISTING

1x 2"

Sc h8

0 Co nd uit

- EX

IS

TIN

G

2x2" Sch40

Conduit - NEW

2x2" Sch40 Conduit - NEW

Ski Dorm Penetration

Glacier Dorm Penetration

Vault 2

Vault 3

Vault 7 Vault 8

Vault 9

Vault 10

Vault 11

Vault 12

Microsoft, Vantor, Park Tiles Team

Legend

Handholes Existing Handhole

New Handhole

Misc Points Building Penetration

Project Start

Conduit Path 1x2" Sch40 Conduit -

NEW

1x2" Sch80 Conduit -

EXISTING

1x3" Sch80 Conduit -

EXISTING

2x2" Sch40 Conduit -

NEW

2x2" Sch80 Conduit -

NEW

National Park Service Mount Rainier National Park

Appendix - Project Overview - Section B

Paradise Picnic Area Comfort

Station

Paradise Employee Ski Dorm

Paradise Glacier Dorm

Paradise Picnic Area Comfort

Station

Paradise Picnic Area Comfort Station

Paradise Waste Water

Treatment Plant

Paradise Picnic Area Comfort Station

Paradise Jackson

Visitor Center

Maintenance Shed

2x 2"

Sc h8

Co nd ui t -

NE

W

2x2" Sch40

Conduit - NEW

1x2" Sch80 Conduit

- EXISTING

1x2" Sch80 Conduit- EXISTING

1x 2"

Sc h8

Co nd u it

EX

IS

TI

NG

PROJECT START

Ski Dorm

Penetration

Glacier Dorm Penetration

Vault 1

Vault 2

Vault 3

Vault 4

Vault 5

Vault 6

Vault 7 Vault 8Vault 9

Vault 10

Vault 11

Vault 12

Microsoft, Vantor, Park Tiles Team

National Park Service Mount Rainier National Park Paradise Fiber/Conduit Install Project Appendix - Project Overview - Section C

Legend

Handholes Existing Handhole

New Handhole

Misc Points Building Penetration

Project Start

Conduit Path 1x2" Sch40 Conduit -

NEW

1x2" Sch80 Conduit -

EXISTING

1x3" Sch80 Conduit -

EXISTING

2x2" Sch40 Conduit -

NEW

2x2" Sch80 Conduit -

NEW

Vault 7

1" = 1 1

1- -

Paradise Conduit/Fiber Install

Hicks, Casey A 27 JUN 2026

NPS MORA IT/

Telecom Program

55210 238 th

Ave E

Ashford, WA 98304

360-569-6555

SOW Appendix

Fiber/Conduit Layout Diagram

1" = 1 1

1- -

Paradise Conduit/Fiber Install

Hicks, Casey A 27 JUN 2026

NPS MORA IT/

Telecom Program

55210 238 th

Ave E

Ashford, WA 98304

360-569-6555

SOW Appendix

Fiber/Conduit Layout Diagram

B

SCALE

SIZE

SHEET OF

REVFSCM NO DRAWING NUMBER

DRAWING TITLE

PROJECT

DRAWN BY DATE

COMPANY

C DBA

C DBA

B

SCALE

SIZE

SHEET OF

REVFSCM NO DRAWING NUMBER

DRAWING TITLE

PROJECT

DRAWN BY DATE

COMPANY

C DBA

C DBA

NOTES:

Statement of Work supersedes this drawing. This drawing is intended to provide clarity in the work to be completed, but is not intended to deviate from what has been contractually obligated within the Statement of

Work. Any discrepancies shall be brought to the attention of the COR & Project Lead.

All conduit paths shall include pull tape with weaved-in tracer wire for future use and so cable can be located.

P003 – JVC Basement Cage Vault 1

Outside JVC Vault 3 Vault 4 Vault 5

Vault 8

Vault 12

Ski Dorm

Glacier Dorm

Mech. Room

Boiler Room

ALL DISTANCES LISTED ARE APPROXIMATE. Vendors will need to wheel their own measurements if more accuracy is required.

To WWTP

To Ski Dorm

To Glacier Dorm

Vault 2

Vault 6

Next to

WWTP

B

SCALE

SIZE

SHEET OF

REVFSCM NO DRAWING NUMBER

DRAWING TITLE

PROJECT

DRAWN BY DATE

COMPANY

C DBA

C DBA

B

SCALE

SIZE

SHEET OF

REVFSCM NO DRAWING NUMBER

DRAWING TITLE

PROJECT

DRAWN BY DATE

COMPANY

C DBA

C DBA

1x48F SM Leave ~400 ft coiled up in vault for future use

Vacant 3" Existing Conduit ~75 ft

Vacant 2" Existing Conduit ~650 ft

Vacant 2" Existing Conduit ~1500 ft

NEW 2x2" Sch 80 Conduit ~475 ft

Install both cables in one conduit

2x12F SM

Bore Under Main Road at Lower Parking Lot Intersection

2x12F SM

Vault 9

1x48F SM + 2x12F SM

Vacant 2" Existing Conduit ~800 ft

Vacant 2" Existing Conduit ~1100 ft

Vacant 2" Existing Conduit ~1700 ft

1x48F SM1x48F SM1x48F SM1x48F SM 1x48F SM + 2x12F SM

NEW 2x2" Conduit ~75 ft

Install both cables in one conduit

2x12F SM NEW 2x2" Conduit

~500 ft Install both cables in one conduit

Vault 10

2x12F SM NEW 2x2" Conduit

~500 ft Install both cables in one conduit

Lower Parking Lot Below Rock Wall

Lower Parking Lot Below Rock Wall

Along Main Road Shoulder Across From Lower Parking Lot

Vault 11

2x12F SM NEW 2x2" Conduit

~500 ft Install both cables in one conduit

Between Lower Parking Lot & Ski Dorm

1x12F SM

NEW 1x2" Conduit ~75 ft

1x12F SM

NEW 1x2" Conduit ~250 ft

NEW 1x2" Conduit ~50 ft

1x12F SM

Paradise Project Overview Map
Paradise Section A
Paradise Section B
Paradise Section C
Layout Diagram
Layout Diagram.vsdx
Phase 2 Diagram

File details come from the government source that posted it. Updated .