Attachment 6 Self-Performed Work Calculations.docx

DOCX document 26 KB Posted

Attached to
Y1DA--Upgrade Fire Alarm System Campus Wide (Waco) Project 674A4-21-108
Solicitation number
36C25725R0069
Issued by

About this file

The document is an Attachment 6 providing instructions for Self-Performed Work Calculations for a Veterans Affairs contract relating to a fire alarm system upgrade at a campus in Waco. The attachment outlines specific calculation requirements for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) regarding subcontracting limitations, specifically mandating that the SDVOSB prime contractor cannot pay more than 85% of the government contract amount (excluding material costs) to non-VetCert firms. Offerors must complete a detailed worksheet calculating their total proposed price, projected payments to non-VetCert SDVOSBs, percentage of non-VetCert work, and percentage of self-performed work at the time of proposal submission.

View the file

Other files

File Type Posted
36C25725R0069 0003.docx DOCX document
P03 36C257-25-AP-0477-FY25-926 JOFOC NCO17 Upgrade Fire Alarm System - HCA Approved_all signed v1_Redacted.pdf PDF
Attachment 4 RFIs 36C25725R0069 Upgrade Fire Alarm System.docx DOCX document
Attachment 9 Price Breakout_with alternates.xlsx XLSX spreadsheet
36C25725R0069_0002 Amendment 2.docx DOCX document
P09 Attachment 1 - Upgrade Fire Alarm SOW_24 July 25.docx DOCX document
Attachment 6 Self-Performed Work Calculations Specialized.docx DOCX document
36C25725R0069 0002.docx DOCX document
Attachment 1_36C25725R0069_0001 Amendment 1.pdf PDF
36C25725R0069 0001.docx DOCX document
Attachment 2_CTX Upgrade Fire Alarm System Site Visit_07082025.pdf PDF
Attachment 1 SOW - Upgrade Fire Alarm_28 Jan 25.docx DOCX document
Attachment 7 Site visit map.docx DOCX document
Attachment 5 Sealed VA.WAC Fire Alarm - 100 Bid Set Narrative.pdf PDF
Attachment 3 Sealed VA.WAC Fire Alarm - 100 Bid Set Drawings.pdf PDF
Attachment 2 McLennan County Wage Determination.pdf PDF
36C25725R0069.docx DOCX document
Attachment 8 Unofficial ICRA_PCRA Guidance for Solicitation.docx DOCX document
Attachment 4 Sealed VA.WAC Fire Alarm - 100 Bid Set Specifications.pdf PDF
Attachment 9 Price Breakout.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFEROR’S SELF PERFORMED CALCULATIONS

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to Non-VetCert listed SDVOSBs: $ __________ (not including materials)

c) Offeror’s percentage of estimated Non-VetCert work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified VetCert SDVOSBs.

File details come from the government source that posted it. Updated .