Attachment 6 Quality Assurance Surveillance Plan (1).docx
DOCX document 80 KB Posted
- Attached to
- HC108426R0004 Enterprise Storage Solutions IV Managed Storage Service Draft Request for Proposal
- Solicitation number
- HC108426R0004
- Issued by
-
Defense Information Systems Agency
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for the Enterprise Storage Solutions (ESS) IV contract with the Defense Information Systems Agency (DISA). The QASP provides a systematic method to evaluate contractor performance across multiple critical tasks, including storage solutions, system interoperability, remote management, asset management, and reporting requirements. Key performance standards include 99.99% solution availability, 100% compliance with security requirements, and stringent delivery and reporting timelines.
The surveillance plan outlines detailed performance metrics for 13 specific subtasks, with acceptable quality levels ranging from 90% to 100%, depending on the task criticality. The government will conduct periodic inspections, 100% inspections for certain tasks, and use performance assessment reports to track contractor performance. Performance will be rated using a five-tier system from Exceptional to Unsatisfactory, with potential impacts on future contract payments and contractor performance assessments. The QASP serves as a comprehensive tool for monitoring and documenting the contractor's adherence to contract requirements throughout the contract lifecycle.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Sample Task Orders (1).docx | DOCX document | |
| Attachment 7 Small Business Participation Plan Template (1).docx | DOCX document | |
| Attachment 9 SOFA Contract Clauses (1).docx | DOCX document | |
| Attachment 12 DD Form 254 (1).pdf | ||
| Appendix 12 - PWS Technical Requirements (1).xlsx | XLSX spreadsheet | |
| HC108426R0004 Draft Solicitation.docx | DOCX document | |
| Attachment 3 ESS IV Sample Cert Ltr (1).docx | DOCX document | |
| Attachment 4 ESS IV Offeror Technical Specifications (1).xlsx | XLSX spreadsheet | |
| Attachment 11 Mission-Essential Contractor Services ESS IV (1).pdf | ||
| Appendix 9 - EPL Worksheet (1).xlsx | XLSX spreadsheet | |
| Attachment 2 ESS IV Self-Certification Checklist (1).xlsx | XLSX spreadsheet | |
| Attachment 5 ESS IV Price Model (1).xlsx | XLSX spreadsheet | |
| Attachment 8 Performance Work Statement (1).docx | DOCX document | |
| Attachment 10 DISA Subcontracting Plan Checklist (1).docx | DOCX document | |
| Appendix 8 - DISA NDA (1).docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Attachment 6, ESS IV QASP
CUI
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title (Add contract/task order number at award):
Enterprise Storage Solutions (ESS) IV
2. Purpose:
This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
4. Primary Method of Surveillance:
a. Periodic Inspection as required for:
· Task 1 – 6.1 Storage Solutions and Capabilities
· Task 3 – 6.3.3 Subtask 3.3, ESM Interoperability
· Task 3 – 6.3.5 Subtask 3.5, Remove Management
· Task 5 – 6.5.1 Subtask 5.1, Availability
· Task 6 – 6.6.1.1 Subtask 6.1.1, Delivery, Installation and RFU
· Task 6 – 6.6.1.4 Subtask 6.1.4, Equipment Report
· Task 7 – 6.7.5 Subtask 7.5, Asset Management
· Task 8 – 6.8.1 Subtask 8.1, Monthly Inventory Report (Physical Level)
· Task 8 – 6.8.2 Subtask 8.2, Weekly Order Summary Report
· Task 8 – 6.8.3 Subtask 8.3, Monthly Incident Summary Report
· Task 8 – 6.8.5 Subtask 8.5, Monthly Metered Usage Billing Report
· Task 12 – 6.12.1.1 Subtask 12.1.1, Ordering Process
b. 100% inspection and acceptance required for:
· Task 4 – 6.4.2 Subtask 4.2, Storage Resource Management (SRM).
· Task 12 – 6.12.3 Subtask 12.3, Acceptance
· Task 13.5.4 – Requirement to Inform Employees of Whistleblower Rights
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished. Therefore, you know exactly when to conduct the evaluations. Periodic inspections automatically become 100 percent evaluations or "100 percent checks." Inspections should be divided and scheduled by frequency: annual, semiannual, quarterly, monthly, weekly, and as required. Sometimes services are required for which the time or frequency cannot be predicted, such as accident investigations, one-time special tasking by higher headquarters, etc. These would be labeled "as required inspections." Others are known and predictable such as the quarterly status report or the monthly travel report currently included in some DISA service contracts.
· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.
1. 5. Performance Standards.
| PWS Reference |
| Performance Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Task 1 - 6.1 - Storage Solutions and Capabilities |
| Comply with all security requirements. |
| 97% |
| Periodic inspection of security procedures. |
Task 3 - 6.3.3 Subtask 3.3
- ESM Interoperability
| Provide infrastructure that interoperates with the Government specified Enterprise Systems Management (ESM) architecture. |
| 100% |
| Periodic inspection of downtime reports for software interoperability. |
Task 3 - 6.3.5 Subtask 3.5
- Remote Management Provide infrastructure components capable of being managed remotely via a dedicated Government management network.
| 100% |
| Periodic inspection of reports for maintenance requirements. |
Task 4 - 6.4.2 Subtask 4.2
- SRM
| Within 90 calendar days after the date of the contract award, the contractor must provide a single integrated SRM solution to provide business process and multi-tiered lifecycle management utilizing built-in AI, which fully sustains all storage services provided under this contract, and maximizes the integration with the Government’s current installed inventory. |
| 100% |
| 100% inspection and acceptance of the SRM solution. |
Task 5 - 6.5.1 Subtask 5.1
- Availability Measurement 1. Solution availability must meet 99.99% based on the calculation: (Total available hours for number of calendar days in reporting month) - Measurement Exceptions - Time storage is unavailable, unable to perform core function, or core function is significantly degraded) / (Total available hours for number of calendar days in reporting month - Measurement Exceptions) *100=Service Level Attained. Total available hours = 24x number of calendar days in reporting month for EACH orderable system.
Measurement 2A (summary): Solution availability for Enterprise Systems must meet 99.9999% based on the following calculations: Total available hours for number of calendar days in reporting month - Measurement Exceptions - Time storage is unavailable, unable to perform core function, or core function is significantly degraded) / (Total available hours for number of calendar days in reporting month - Measurement Exceptions) *100=Service Level Attained. Total available hours = 24xnumber of calendar days in reporting month AVERAGED over all orderable systems.
Measurement 2B (per system): Solution availability for Enterprise Systems must meet 99.9999% based on the following calculations: Total available hours for number of calendar days in reporting month - Measurement Exceptions - Time storage is unavailable, unable to perform core function, or core function is significantly degraded) / (Total available hours for number of calendar days in reporting month - Measurement Exceptions) *100=Service Level Attained. Total available hours = 24x number of calendar days in reporting month for EACH orderable system.
| 100% |
| Periodic inspection of performance and downtime reports. |
Task 6 - 6.6.1.1 Subtask
6.1.1 - Delivery, Installation and RFU
| Delivery of equipment must occur within 30 calendar days for CONUS and 45 calendar days for OCONUS after the acceptance date of the call order by the contractor. |
| 90% |
| Periodic inspection of delivery timelines. |
Task 6 - 6.6.1.4 Subtask
6.1.4 - Equipment Report
| Provide report no less than five calendar days prior to equipment delivery |
| 95% |
| Periodic inspection of Equipment Report. |
Task 7 - 6.7.5 Subtask 7.5
- Asset Management
| Coordinate all assets with the Government prior to deployment into the storage environment and an established process for handling asset returns and redeployment within the same Government location or redeployment to another Government location |
| 100% |
| Periodic inspection of Storage environment. |
Task 8 - 6.8.1 Subtask 8.1
- Monthly Inventory Report (Physical Level)
| Provide reports. |
| 95% |
| Periodic inspection of materials upon delivery. |
Task 8 - 6.8.2 Subtask 8.2
- Weekly Order Summary Report
| Provide reports. |
| 95% |
| Periodic inspection of materials upon delivery. |
Task 8 - 6.8.3 Subtask 8.3
- Monthly Incident Summary Report
| Provide reports. |
| 95% |
| Periodic inspection of materials upon delivery. |
Task 8 - 6.8.5 Subtask 8.5
- Monthly Metered Usage Billing Report
| Provide reports. |
| 100% |
| Periodic inspection of materials upon delivery. |
Task 12 - 6.12.1.1 Subtask 12.1.1 - Ordering Process
| Provide an ordering process to manage the introduction or termination of technology, and changes to current and existing capacity offerings. |
| 100% |
| Periodic inspection of lapses of time between when the call order is dispatched to the contractor and acceptance. |
Task 12 - 6.12.3 Subtask
12.3 - Acceptance
| Develop acceptance-testing methodology. |
| 90% |
| 100% inspection of acceptance for each asset |
Installed.
| Task 13.5.4 Affirmation of Requirement to Inform Employees of Whistleblower Rights |
| Provide a written affirmation that a written notification was provided to the contractor employees and the format. |
| 100% |
| Annual Review |
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication and may be through the PAR template (Appendix 2). The COR shall document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor must present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions determined necessary by the KO.
7. Mandatory or regulatory compliance items: The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
8. Acceptable Quality Level (AQL):
The AQL for this project is 100% due to the critical support provided by mainframe operations.
9. Evaluation Method:
The COR will track the response to the requirements of inspected tasks, conduct a comparison with actual maintenance performance, and otherwise verify and validate contractor performance. Help desk ticket logs will be used as documentation and compared to the AQL specific to the task to verify and validate contractor performance.
10. Performance Rating
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
| Rating |
| Definition |
| Note |
| Exceptional |
| Performance meets contractual requirements and exceeds much to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, environmental deficiency report or letter). |
| Unsatisfactory |
| Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
| To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters). |
Appendix 1 - Surveillance Matrix Performance Standard Acceptable Quality Levels Methods of Calculation
| Surveillance |
| Results/Ratings |
| Does the contractor comply with all security requirements. |
| 97% |
| Review of compliance with security requirements. |
| Periodic inspection of security procedures |
| (Exceptional |
Very Good Satisfactory Marginal Unsatisfactory)
(A rollup of assessment of the Surveillance Inspection Results to develop an overall rating for this objective)
| Does the contractor provide infrastructure that interoperates with the Government specified Enterprise Systems Management (ESM) architecture. |
| 100% |
| Review of downtime reports for software interoperability. |
| Periodic inspection of downtime reports for software interoperability. |
Does the contractor provide infrastructure components capable of being managed remotely via a dedicated Government management network.
| 100% |
| Review of reports for maintenance requirements. |
| Periodic inspection of reports for maintenance requirements. |
| Does the contractor provide a single integrated SRM solution within 90 calendar days after the date of the contract award. |
| 100% |
| Review and acceptance of the SRM solution. |
| 100% inspection and acceptance. |
| Does the contractor perform deinstallation of equipment within 15 calendar days of the acceptance of the deactivation call order by the contractor. |
| 100% |
| Review of deactivation timelines. |
| Periodic inspection of performance and downtime reports. |
| Does the contractor provide the equipment report no less than 5 business days prior to delivery. |
| 90% |
| Review of equipment report. |
| Periodic inspection. |
| Does the contractor provide the training plan 30 calendar days after contract award and as required if /when new hardware or capabilities are introduced into the processing environment. |
| 100% |
| Review of training plan. |
| Initial and Periodic inspection |
| Does the contractor provide infrastructure that interoperates with the Government’s specified Enterprise Systems Management (ESM) architecture and without disruption, conflicts, or interference. |
| 100% |
| Review of downtime reports for software interoperability. |
| Periodic inspection. |
| Does the contractor provide infrastructure components capable of being managed remotely via a dedicated DISA management network. |
| 100% |
| Review of reports for maintenance requirements. |
| Periodic inspection. |
| Does the contractor provide infrastructure components capable of being backed up via a dedicated backup network. |
| 100% |
| Review of backup network to ensure backups occurs. |
| Periodic inspection. |
| Does the contractor comply with all security requirements. |
| 100% |
| Review of security requirements. |
| Periodic inspection. |
| Does the contractor ensure all assets are coordinated with DISA prior to introduction into the environment. |
| 100% |
| Inspection of environment. |
| Periodic inspection. |
| Does the contractor validate a call order for accuracy within 8 business hours of receipt. |
| 80% |
| Review of lapse of time between when Govt call order is dispatched to the contractor and Acceptance occurs. |
| Periodic inspection. |
| Does the contractor develop acceptance testing methodology. |
| 90% |
| Review of acceptance for each asset installed |
| 100% inspection performed at the time of installation. |
Appendix 2 – Performance Assessment Report
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 3 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4 FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Controlled By: DISA CUI Controlled By: J-9331 Page 1 of 46 Pages CUI Category: PROCURE Distribution/Dissemination Control: FEDCON POC: DISA HC121, disa.meade.hacc.list.operations-support-hc121-all@mail.mil
CUI Attachment 6, ESS IV QASP Page 1 of 12 Pages