About this file
This document is a Quality Assurance Surveillance Plan (QASP) template for the U.S. Department of Agriculture (USDA), specifically for the Brush Creek/Hayden Ranger District Office janitorial services contract.
The QASP establishes the systematic procedures and methodologies the USDA Forest Service will use to monitor contractor performance against established standards. The contract requires the contractor to provide regularly scheduled cleaning services including vacuuming and cleaning floor mats, general spot cleaning and dusting, complete restroom cleaning and sanitization, floor sweeping and mopping, and restocking of restroom supplies. Performance is measured against three primary objectives: Basic Cleaning Services (floors, baseboards, trash, glass, and carpets maintained to contract standards), Basic Restroom and Utility Room Cleaning Services (all surfaces clean, disinfected, and properly stocked), and Periodic Cleaning Services (floors with glossy appearance free of marks and stains, windows and carpets free of dirt and discoloration). The Acceptable Quality Level for all three service areas is not to exceed five customer complaints per month, with compliance evaluated through random sampling of COR inspection reports. The COR will conduct inspections every two weeks using a standardized checklist that rates performance as Excellent, Satisfactory, Unsatisfactory, or Not Applicable based on whether all duties are performed to contract standards or defects are discovered. The contractor is responsible for implementing a Quality Control Plan describing its methods for meeting performance standards, while the Contracting Officer oversees contract administration and the COR performs day-to-day surveillance and monitoring, including issuing discrepancy reports and recommendations for corrective actions when performance falls below established thresholds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 1 - Solicitation Terms and Conditions.pdf | ||
| Attachment 2 Performance Work Statement.pdf | ||
| Attachment 4 Map layout.pdf | ||
| Attachment 5 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
c
US Department of Agriculture (USDA)
Quality Assurance Surveillance Plan
Contents Project Name Solicitation / Contract Number Section 1: Introduction
1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance of Performance Progression
1.3 QASP Relation to the Quality Control Plan (QCP)
Section 2: Performance Description
2.1 Performance Standards and Acceptable Quality Levels (AQLs)
2.1.1 Allowable Deviation
2.1.2 Substantially Complete
2.2 Non-Performance
2.2.1 Documentation
2.2.2 Remedial Actions
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
3.2.2 Contracting Officer Representative (COR)
3.2.3 Customers.................................................................................................................................. Error! Bookmark not defined.
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
4.2 Analysis and Results
Appendix A: Example Performance Requirement Summaries Appendix B: Example Discrepancy Report .................................................................................................. Error! Bookmark not defined.
Appendix C: Customer Feedback Record .................................................................................................... Error! Bookmark not defined.
Appendix D: Example Guide / Inspection List Appendix E: Example Quality Assurance Monitoring.................................................................................. Error! Bookmark not defined.
Appendix F: Example Customer Complaint Investigation ........................................................................... Error! Bookmark not defined.
Appendix G: Example Surveillance Activity Checklist ................................................................................. Error! Bookmark not defined.
Project Name BCH Janitorial Contract
Solicitation / Contract Number Insert Solicitation / Contract Number
Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled [Janitorial Services for Brush Creek/Hayden Ranger District Office. Including regularly scheduled cleaning of the entire facility: Vacuum and Clean floor mats, General Spot Cleaning, General Dusting, Cleaning of restrooms (all surfaces), Sweep and mop restroom floors, Restock all supplies for restrooms, etc.]. This plan sets forth the procedures and guidelines that the USDA, [U.S. Forest Service] will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression
As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP)
The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.
Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.
2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.
The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.
2.1.1 Allowable Deviation
The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).
2.1.2 Substantially Complete
In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.
2.2 Non-Performance
Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement.
Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.
When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.
2.2.1 Documentation
Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix D/ Inspection List.
The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
2.2.2 Remedial Actions
The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.
3.2.2 Contracting Officer Representative (COR)
The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP;
and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.
1. The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR 8.406-2 Inspection and acceptance.
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.
The methods of surveillance will be COR Inspection of work Every 2 weeks, review of completed janitor checklists, random sampling, and Customer complaint records.
4.2 Analysis and Results
When the inspections and [Appendix C: Customer Feedback Record] validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:
PWS
Para.
No.
Performance Objective Performance Threshold
3.0 Basic Cleaning Services. Floors, baseboards, corners and wall edges are free of dirt, dust and debris. Trash is empty. Plastic liners are in good condition. Trash containers are free of odors and visible dirt.
Trash is emptied into outdoor trash collection containers. Glass and mirrors have no traces of film, dirt, smudges, or water. Drinking fountains are disinfected and free of streaks, stains, spots, smudges, scale, and other deposits. Carpets are free of dirt, debris, litter and other foreign matter. Dust is not visible.
Not to exceed 5 customer complaints per month.
Random sampling of inspection reports by COR.
3.0.1 Basic Restroom And Utility Room Cleaning Services.
Surfaces of sinks, toilet bowls, and base of toilet, urinals, lavatories, dispensers, plumbing fixtures, partitions, dispensers, doors, walls, and other such surfaces are clean and disinfected. Surfaces shall be free from streaks, stains, scale, scum, urine deposits, and rust stains. Restrooms are stocked sufficiently.
reports by COR.
3.0.2 Periodic Cleaning Services. Floors have a glossy uniform appearance free of scuffmarks, heel marks, wax build-up, and other stains and discoloration. Windows are free of film, dirt, smudges, water, and other foreign matter. Carpets are free of stains and discoloration.
reports by COR
Appendix A: Performance Requirement Summaries
PERFORMANCE REQUIREMENT SUMMARY
Performance Task (PWS Reference)
Performance
Indicator
Performance
Standard
Acceptable Quality
Level (AQL)
Method of Surveillance
Timeliness and Accuracy of Delivery-Supplies/ Services (PWS, Section 6.6.4)
Supplies/Services delivered as ordered – Quantity / Quality
Delivery matches Order quantity and Supplies/ Services description
95% of all deliveries match order quantity and supplies / services
Inspection of Monthly Sales and Delivery Report.
Appendix B: Guide/ Inspection List
CONTRACT NUMBER: ___________________________________
SERVICE FUNCTION:
PWS SECTION:
1 Method of Surveillance:
2 Office Size:
3 Sample Size:
4 Performance Requirement: Performance is Excellent (E) when all duties have be performed to contract standards or fewer defects are discovered per month. Performance is Satisfactory (S) when most task have been completed but only a few were not completed to contract standard or fewer defects are discovered per month. Performance is Unsatisfactory (U) when task are not complete or to contract standards or more defects are discovered per month.
5 Sampling Procedure: Instructions on how to select the sample must be clear and complete
6 Inspection Procedure: Inspections shall be done once every two weeks. Inspector will go around the office with a checklist and inspect the contractors’ work and take notes on what is not to contract standard. The inspector will check yes/no on whether the work is Excellent (E) Satisfactory (S) or Unsatisfactory (U)
Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)
PRS Requirements Timeliness Quality of Work Notes
Overall Rating Of Inspection (E, S, U or N/A)
COR/Inspector Comments:
Contractor Signature: ___ Date: __
COR Signature: ____________________Date: _________________
| Project Name |
| Solicitation / Contract Number |
| Section 1: Introduction |
| 1.1 Purpose |
| 1.2 QASP Relation to the Contract |
| 1.2.1 QASP Revisions |
| 1.2.2 Surveillance of Performance Progression |
| 1.3 QASP Relation to the Quality Control Plan (QCP) |
| Section 2: Performance Description |
| 2 |
| 2.1 Performance Standards and Acceptable Quality Levels (AQLs) |
| 2.1.1 Allowable Deviation |
| 2.1.2 Substantially Complete |
| 2.2 Non-Performance |
| 2.2.1 Documentation |
| 2.2.2 Remedial Actions |
| Section 3: Contractor and Government Responsibilities |
| 3 |
| 3.1 Contractor Responsibility |
| 3.2 Government Responsibility |
| 3.2.1 Contracting Officer (CO) |
| 3.2.2 Contracting Officer Representative (COR) |
| Section 4: Surveillance Methods to Perform Quality Assurance |
| 4 |
| 4.1 Surveillance Methods |
| 4.2 Analysis and Results |
| Appendix A: Performance Requirement Summaries |
| Appendix B: Guide/ Inspection List |
File details come from the government source that posted it. Updated .