Attachment_6_Project_Drawings_and_Photos.pdf

PDF 3 MB Posted

Attached to
OLYM Rehabilitate Log Cabin Drainfield
Solicitation number
140P8326Q0021
Issued by

About this file

This file is Attachment 6 to a federal contract opportunity for rehabilitating a log cabin drainfield at Olympic National Park (OLYM), contract number 140P8326Q0021. The attachment contains as-built record drawings and construction photographs documenting the drainfield system design and installation.

The project involves a subsurface drainfield system comprising five disposal zones (Zones 1-5) with Geoflow Wasteflow PC dripline technology. The system includes 2-inch PVC inlet feed headers and 1.5-inch PVC flush return lines serving Zones 1 through 4, which are centrally located in a common trench. Each zone features subsurface dripline with looped ends between connection points. The design includes air relief and vacuum breaker components for Zones 1 and 3, check valves, and a dosing building with potable water supply. The plan view drawing indicates specific measurements and layout specifications, with the drainfield spanning approximately 100 feet in length and incorporating multiple disposal zones configured across the site. The construction photographs show the Zone 1 dripline layout prior to end loop installation, the central PVC header and flush return line infrastructure, and the completed subsurface dripline connections with looped configuration. This attachment serves as a technical reference for the as-built conditions of the drainfield rehabilitation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6: Project Drawings and Photos Rehabilitate Log Cabin Drainfield 140P8326Q0021 Olympic National Park (OLYM)

LOG CABIN DRAINFIELD REPAIR ATTACHMENTS

AS-BUILT RECORD DRAWINGS

Drainfield Dosing Building w/ potable water

Central PVC header & flush return line trench for Zones 1 – 4

140P8326Q0021 Olympic National Park (OLYM)

ORIGINAL CONSTRUCTION PHOTOS

Figure 1. Zone 1 Geoflow Wasteflow PC dripline layout prior to installation of end loops, looking east.

Central PVC header & flush

140P8326Q0021 Olympic National Park (OLYM)

Figure 2. Zone 1 Geoflow Wasteflow PC dripline layout prior to installation of end loops, looking west.

Central PVC header & flush

140P8326Q0021 Olympic National Park (OLYM)

Figure 3. 2-inch PVC inlet headers and 1.5-inch PVC flush return lines for Zones 1, 2, 3 and 4 in central trench, looking west.

Air relief / vacuum breaker for Zone 1

140P8326Q0021 Olympic National Park (OLYM)

Figure 4. 2-inch PVC inlet headers and 1.5-inch PVC flush return lines for Zones 2 and 4 in the foreground, plus Zones 1 and 3 in central trench, looking west.

Air relief / vacuum breaker for Zone 1

140P8326Q0021 Olympic National Park (OLYM)

Figure 5. Zones 2 and 4 example of subsurface dripline connected to 2-inch PVC inlet feed headers and 1.5-inch PVC flush return lines with looped ends between connection points.

Air relief / vacuum breakers for Zones 1 & 3

AS-BUILT RECORD DRAWINGS
ORIGINAL CONSTRUCTION PHOTOS

File details come from the government source that posted it. Updated .