Attachment 6 - MAHG121108 Repair Repaint Convault Tanks - MSS.xls

XLS spreadsheet 49 KB Posted

Attached to
Repair and Repaint Convault Tanks Federal contract opportunity
Solicitation number
FA301023R0023
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a material submittal schedule for the federal contract opportunity titled "Repair and Repaint Convault Tanks" with solicitation number FA301023R0023 from the Department of the Air Force Air Education and Training Command. Key submittals and due dates include hazardous material questionnaires and MSDS five days prior to start, recycling and landfill reports at end of contract, float and level mechanisms and paint for tanks submittals 20 days following notice to proceed, and manufacturer and contractor warranties at end of contract. The schedule also includes columns to track submittal dates received from the contractor, dates under civil engineering review, return suspense dates, approval notifications, and resubmittal numbers.

View the file

Other files for this federal contract opportunity

Other files attached to Repair and Repaint Convault Tanks, newest first.
File Type Posted
Attachment 12 - MAHG121108 Repair Repaint Convault Tanks - Additional Questions and Answers.pdf PDF
Solicitation Amendment FA301023R00230003 SF 30.pdf PDF
Solicitation Amendment - FA301023R00230003.pdf PDF
Attachment 13 - MAHG121108 Repair Repaint Convault Tanks - Removable Bollards Specs .pdf PDF
Attachment 14 - MAHG121108 Repair Repaint Convault Tanks - Addendum 1.pdf PDF
Solicitation Amendment 2 - FA301023R00230002.pdf PDF
Solicitation Amendment 2 FA301023R00230002 SF 30.pdf PDF
Solicitation Amendment FA301023R00230001 SF 30.pdf PDF
Solicitation Amendment - FA301023R00230001.pdf PDF
Attachment 11 - MAHG121108 Repair Repaint Convault Tanks - Questions and Answers.pdf PDF
Pre-Bid Site Visit - Repair Repaint Convault Tanks - 20230807.pdf PDF
Attachment 1 - MAHG121108 Repair Repaint Convault Tanks - SOW.pdf PDF
Attachment 2 - MAHG121108 Repair Repaint Convault Tanks - Specs.pdf PDF
Attachment 4 - MAHG121108 Repair Repaint Convault Tanks - Convault Guidelines.pdf PDF
Attachment 10 - Convault Tank Photos.pdf PDF
Solicitation - FA301023R0023.pdf PDF
Attachment 8 - Past Performance Questionnaire.pdf PDF
Attachment 3 - MAHG121108 Repair Repaint Convault Tanks - Drawings.pdf PDF
Attachment 5 - MAHG121108 Repair Repaint Convault Tanks - UFC Guide.pdf PDF
Attachment 7 - Wage Determination.pdf PDF
Attachment 9 - Past Performance Reference List.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG121108Project Title:
Repair Repaint Convault TanksSolicitation / Contract Number:

FA301023R0023; Attachment #6

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HazMat Questionnaire15 Days Prior to Start Date
2HazMat MSDS15 Days Prior to Start Date
3Hazmat Reporting Entry Form15 Days Prior to Start Date
4Hazmat Reporting Entry Form1End of Contract
5Recycling and Landfill Report1End of Contract
6Warranty (Manufacturer's)1End of Contract
71-Year Warranty (Contractor)1End of Contract
8Float/Level Mechanisms1120 days following NTP
9Removable Bollards11120 days following NTP
10Paint for Tanks1120 days following NTP
1120 days following NTP
1220 days following NTP
1320 days following NTP
1420 days following NTP
1520 days following NTP
1620 days following NTP
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)