ATTACHMENT 6 General Conditions Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C24926R0037
About this file
This is a General Conditions Breakout spreadsheet that appears to serve as a reference document for contract terms and conditions applicable to the construction project. The file functions as an appendix or supporting document rather than a substantive requirements document, organizing general contract conditions that would typically be incorporated into the main solicitation for the Primary Care Building renovation project at the Department of Veterans Affairs facility under Solicitation 36C24926R0037.
As a template or organizational tool, this spreadsheet does not specify products or services, pricing terms, response dates, or other transactional details. Instead, it provides a structured breakdown of standard general conditions that would govern contractor performance, liability, insurance requirements, compliance obligations, and other administrative and legal provisions applicable to the construction renovation work. Contractors responding to this solicitation would need to reference this document in conjunction with the main RFP, Statement of Work, and other solicitation attachments to understand the complete scope of general contractual obligations for the Veterans Health Administration project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | ||
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage. | ||
| General Condition Description | Value | |
| Project Management: | $ - 0 | |
| Superintendent(s) | $ - 0 | |
| Safety Manager | $ - 0 | |
| CPM Scheduler | $ - 0 | |
| Quality Assurance/Quality Control | $ - 0 | |
| Project Manager (s) | $ - 0 | |
| Project Executive | $ - 0 | |
| Field Office Engineer | $ - 0 | |
| Field Office Support Staff | $ - 0 | |
| Project Expeditor | $ - 0 | |
| Assistant Superintendent (s) | $ - 0 | |
| Project Manager Subtotal: | $ - 0 | |
| Bonds and Insurance (excluding any for Subcontractors): | $ - 0 | |
| Builder’s Risk Insurance | $ - 0 | |
| General Liability Insurance | $ - 0 | |
| Security, Payment & Performance Bonds | $ - 0 | |
| Bonds and Insurance Subtotal: | $ - 0 | |
| Site Conditions: | $ - 0 | |
| Temporary Power Consumption (Offices) | $ - 0 | |
| Temporary Power Consumption (General Site Use) | $ - 0 | |
| Temporary Water and Sewer Consumption | $ - 0 | |
| Temporary Water Hookup, Distribution & Meters | $ - 0 | |
| Temporary Electrical Hookup, Distribution & Meters | $ - 0 | |
| Temporary Telephone & Network System Installation | $ - 0 | |
| Temporary Telephone & Internet Consumption Fees | $ - 0 | |
| Temporary Fire Protection | $ - 0 | |
| Temporary Heating & Cooling | $ - 0 | |
| Temporary Fencing | $ - 0 | |
| Temporary Covered Walkways | $ - 0 | |
| SWPPP Measures | $ - 0 | |
| Temporary Entries and Truck Washes | $ - 0 | |
| Street Cleaning (by G.C.) | $ - 0 | |
| Traffic Control Measures | $ - 0 | |
| Temporary Barricades & Signage | $ - 0 | |
| Temporary Roads & Walkways (install & maintenance) | $ - 0 | |
| Temporary Lighting | $ - 0 | |
| Temporary Partitions & Covered Floor Openings | $ - 0 | |
| Temporary Toilets/Sanitary Measures | $ - 0 | |
| Temporary Laydown (prep and restoration) | $ - 0 | |
| Security System/Watchman | $ - 0 | |
| Pre-construction Photo Documentation | $ - 0 | |
| Progress Photos | $ - 0 | |
| Temporary Protection (in place work/adjacent structures) | $ - 0 | |
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| General Conditions Total | $ - 0 |
File details come from the government source that posted it. Updated .