ATTACHMENT 4 Calc. of Self Performed Work.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z2DA--Project # 614-17-113 - Construction to Renovate Bldg. 1 Primary Care
Solicitation number
36C24926R0037
Issued by

About this file

This is a spreadsheet template for calculating self-performed work requirements in response to Solicitation 36C24926R0037 for construction services to renovate Building 1 Primary Care at a Department of Veterans Affairs facility under Veterans Integrated Service Network 9. The spreadsheet serves as an appendix tool to support contractor proposals and does not itself specify required products or services. Rather, it provides a structured format for contractors to document and calculate the percentage and dollar value of work they intend to self-perform versus subcontract, which is a standard compliance requirement for federal construction contracts. Contractors would use this template to demonstrate their commitment to direct performance of contract work and to meet any applicable self-performance thresholds or evaluation criteria established in the solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide
at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .