About this file
This document is the Foundation Design for the Judicial Drive Trail Pedestrian Bridge project, prepared by GEO Design & Engineering, Inc. in collaboration with Professional Design Group, Inc. for the Public Works Department of the City of Fairfax, Virginia.
The project involves the construction of a 70-foot pedestrian bridge over Accotink Creek, as part of the Judicial Drive Trail Connection project. The bridge design includes concrete beams, caissons, and a concrete deck. Key details include the caisson bearing capacity of 5,000 psf, minimum caisson diameter of 36 inches, concrete compressive strengths of 5,000 psi for caissons and 6,000 psi for beams/abutments, and reinforcement requirements. The project has a 6% DBE goal and requires VDOT pre-qualification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
COVER SHEET
DRAWING INDEX
1. COVER SHEET
2. STRUCTURAL NOTES
3. SITE PLAN
4. BRIDGE PLAN
5. CAISSON PLAN
6. CROSS SECTION A-A
7. CROSS SECTION B-B & DETAILS
NTS
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL PEDESTRIAN BRIDGE
CLIENT
Public Works Department, City of Fairfax
Suite #201, 10455 Armstrong Street
Fairfax, VA 22030-3630
PREPARED BY:
PROFESSIONAL DESING GROUP, INC.
4124 Walney Road, Suite M
Chantilly, Va. 20151 in Collaboration With
GEO DESIGN & ENGINEERING, INC.
14301 Sullyfield Circle, Suite I
Chantilly, Virginia 20151
C U s e r s h a f i d
D o c u m e n t s M
A K
J u d i c i a l J u d i c i a l d w g
S H
E E T
C
O V
E R
S H
E E T
A
M
D
W G
T o
P
D F p c
9-26-2023
DIVISION 1 - GENERAL REQUIREMENTS
1. All construction shall be in compliance with the provisions of the 2018 IBC and Virginia Statewide Building Code
(VUSBC) .
2. Work performed shall comply with these general notes unless otherwise noted on plans.
3. Work performed shall comply with all applicable local and state codes, ordinance, and regulations.
4. On-site verification of all dimensions and conditions shall be the responsibility of the general contractor and his subcontractors.
5. Discrepancies: the contractor shall compare and coordinate all drawings; when, in the opinion of the contractor, a discrepancy exists he shall promptly report it to the Designer for proper adjustment before proceeding with the work.
6. Omissions: in the event certain features of the construction are not fully shown on drawings, their construction shall be the same character as conditions that are shown or noted.
7. All work is to be performed in a professional manner and in accordance with standard practice and shall be in strict compliance with manufacturer's specifications and/or recommendations.
8. Dimensions shall be read or calculated and never scaled. All dimensions are rough unless noted otherwise.
9. All dimensions shall be reviewed on structural drawings. AOR notified of any discrepancies and inconsistencies between disciplines.
10. The general and sub-contractors shall carefully examine the drawings inspect the size and acquaint themselves with all governing ordinances, laws, etc. and otherwise familiarize themselves with all matters which affect performance of the work.
11. The structural integrity of the caissons & beams/ abutments is dependent upon completion according to the plans and specifications. The structural engineer of the record assumes no liability for the structure during the construction. The method of construction and sequence of operations is the sole responsibility of the contractor. The contractor shall supply any necessary bracing, guys, etc. to properly brace the structure against wind, dead and live loads until the building is completed according to the plans specifications. Any questions regarding temporary bracing requirements should e forwarded to a structural engineer for review.
SOILS
1. The Caissons end bearing capacity shall be 5,000 psf. (GDE Report E23056)
2. Caisson bearing elevation shall be at 5 feet minimum below adjacent sanitary invert elevation, estimated at 369 feet at start of bridge (west side ) and 367 feet end of bridge (east side). All elevations tobe verified in the field.
DIVISION 2 - CONCRETE
1. Structural concrete shall be constructed in accordance with the requirements of IRC Chapter 19 and ACI 318 as amended in Section 1905 of this code. All concrete construction including, detailing, fabrication, placement of reinforcing, mixing, handling, placing, finishing, and curing shall conform to ACI "Structural Concrete for Building" (ACI 301), ACI
"Manual of Standard Practice for detailing Reinforced Concrete Structures" (ACI-315), and "ACI Building Code
Requirements for Reinforced Concrete" (ACI-318). All reinforcing shall conform to the CRSI Specifications Handbook.
Concrete placement shall meet all cold weather and hot weather requirements outline in ACI 306 & 305 respectively.
2. All Concrete shall conform to ASTM C94. Minimum compressive strength shall be as follows
- Caisson 5,000 psi
- Beam/ Abutment 6,000 psi
3. Maximum aggregate size for regular concrete shall be ¾' and peal-gravel concrete shall be 3/8". Aggregate for regular weight concrete shall conform to ASTM C33 and lightweight concrete shall conform ASTM C330.
4. Owner shall retain the services of a qualified testing agency to provide testing of concrete to include compressive strength, temperature, slump and air entrainment.
5. Contractor shall provide concrete mix design data for each type and strength of concrete shown in the structural drawings. The mix design data should include: concrete strength, slump, air entrainment, proposed aggregates, admixtures, and laboratory test data.
6. Concrete placement should be monitored by GDE personnel or another third party inspection agency. Concrete shall be tested for slump, temperature and air entrainment
7. Concrete cylinders should be fabricated for caissons and beams for laboratory curing and testing for compressove strength at 7 and 28 days
8. The caissons should have a minimum diameter of 36 inches
9. Casing would be needed to prevent the collapse of the sides into the caisson hole
10. Drainage measures should be provided during caisson drilling and construction.
11. Concrete for the caissons
Reinforcement Steelp
1. All reinforcing steel shall conform to ASTM-A615, Grade 40 unless notes otherwise.
2. Fabricate and provide standard supporting accessories in accordance with the ACI Manual of Standard Practice for
Detailing Reinforced Concrete Structures ACI 315.
Concrete Protection for Reinforcement
1. Reinforcing bars to have concrete cover as follows:
Footings and other concrete poured against earth………. 3"
Formed concrete exposed to air for bars larger than #5……….2"
Formed concrete exposed to air for bars for #5 or smaller bars……….1 ½"
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
STRUCTURAL NOTES
NTS
C U s e r s h a f i d
D o c u m e n t s M
J u d i c i a l J u d i c i a l d w g
S H
E E T
S T R
U C
T U
R A
L
N
O T E S
A
M
D
F p c
SITE PLAN
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
1":50'
BRIDGE
C U s e r s h a f i d
D o c u m e n t s M
J u d i c i a l J u d i c i a l d w g
S H
E E T
S I T E
P
L A
N
A
M
D
F p c
CONCRETE DECK
BOTTOM CHORD
BRACE DIAGONAL
DECK BRACING FRAMING
FLOOR BEAM
SIDE DAM
BRIDGE LENGTH 70'-0"
BRIDGE PLAN
CONCRETE BEAM
BRIDGE DESIGN BY OTHERS
CAISSON
CAISSON
CAISSON CAISSON
70'-2"
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
BRIDGE PLAN
NTS
C U s e r s h a f i d
D o c u m e n t s M
J u d i c i a l N e w f l d e r
J u d i c i a l a f s v d w g
S H
E E T
B
R I D
G E
P
L A
N
P
M
D
F p c
27" SEWER
CAISSON
PLAN
BRIDGE LENGTH 70'-0"
END (EAST SIDE) OF BRIDGE
START (WEST SIDE) OF BRIDGE
CAISSONS ARE TO BE SUPPORTED
AT BEARING DEPTHS THAT ARE 5
FEET MINIMUM BELOW SANITARY
INVERT ELEVATION AT EACH END OF
BRIDGE.
CAISSON AT START (WEST SIDE) OF BRIDGE TO BE
SUPPORTED AT BEARING ELEVATION OF 369 FEET.
SANITARY INVERT AND BEARING ELEVATIONS NEED
TO BE VERIFIRED IN FIELD.
CAISSONS AT END (EAST SIDE) OF BRIDGE TO
BE SUPPORTED AT BEARING ELEVATION OF
367 FEET. SANITARY INVERT AND BEARING
ELEVATIONS NEED TO BE VERIFIED IN FIELD.
CAISSON
BRIDGE ABOVE
A
A
B
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
CAISSON PLAN
C U s e r s h a f i d
D o c u m e n t s M
J u d i c i a l J u d i c i a l d w g
S H
E E T
C
A I S S O
N
P
L A
N
A
M
D
F p c
18'-8"
21'-8"
CONCRETE BEAM
CAISSON
3'
CROSS SECTION A-A
BRIDGE
DESIGNED BY OTHERS
Ø 27" SEWER
3' 5' 2'-3"
8'-6"
B
B
ABUTMENT
DECK
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
CROSS SECTION A-A
C U s e r s h a f i d
D o c u m e n t s M
J u d i c i a l N l d e r
J u d i c i a l a f s v d w g
S H
E E
C
R O
S S
S E C
T I O
N
A
A
P
M
D
F p c
CROSS SECTION B-B
(10) #8
#3 STIRRUP @
12" O.C.
OR SPIRALTIE
3" MIN
COVER
(2)#10
(3) #10
(3) #10
(6) #10
#4 @ 12" O.C.
STIRRUP
3'
1'-5" 1'-7"
(3)#10
BEARING PLATE
1'-0"X 1'-0" X 0.75"
WITH (4) Ø 0.75 ",
9" LONG HEADED
ANCHORS
(10) #8 WITH
3" STIRRUP @ 12" O.C.
OR SPIRAL TIE
3'
CAISSON SECTION
DECK
DETAIL
1'-5" 1'-7"
"3"6"
DETAIL
BEARING
PLATE
DECK
1"
GDE Project numberSHEETREV. DATEDATE GDE Project numberSHEETSCALEREV. DATEDATE
GDE
GDEGEO DESIGN & ENGINEERING , INC,
KNOWLEDGE IS OUR FOUNDATION
14301 Sullyfield Circle Suite I
Phone: 703-817-0299 Cell: 703-606-8351 Email: mak@geodesigneng.com
Chantilly, Virginia 20151
E23056
FOUNDATION DESIGN - JUDICIAL DRIVE TRAIL
PEDESTRIAN BRIDGE
09-19-2023
CROSS ECTION B-B
C U s e r s h a f i d
D o c u m e n t s M
J u d i c i a l N l d e r
J u d i c i a l a f s v d w g
S H
E E T
C
R O
S S
S E C
T I O
N
B
B
P
M
D
F p c
| Judicial_1-SHEET 1 COVER SHEET |
| Sheets and Views |
| SHEET 1 COVER SHEET |
| Judicial_1-SHEET 2 STRUCTURAL NOTES |
| Sheets and Views |
| SHEET 2 STRUCTURAL NOTES |
| Judicial_1-SHEET 3 SITE PLAN |
| Sheets and Views |
| SHEET 3 SITE PLAN |
| Judicial_1-SHEET 4 BRIDGE PLAN. |
| Sheets and Views |
| SHEET 4 BRIDGE PLAN |
| Judicial_1-SHEET 5 CAISSON PLAN |
| Sheets and Views |
| SHEET 5 CAISSON PLAN |
| Judicial_1-SHEET 6 CROSS SECTION A-A. |
| Sheets and Views |
| SHEET 6 CROSS SECTION A-A |
| Judicial_1-SHEET 7 CROSS SECTION B-B. |
| Sheets and Views |
| SHEET 7 CROSS SECTION B-B |
| 2023-09-26T15:31:27-0400 | |
| Mohamad Abukassem |
| 2023-09-26T15:31:47-0400 | |
| Mohamad Abukassem |
| 2023-09-26T15:32:10-0400 | |
| Mohamad Abukassem |
| 2023-09-26T15:32:31-0400 | |
| Mohamad Abukassem |
| 2023-09-26T15:32:56-0400 | |
| Mohamad Abukassem |
| 2023-09-26T15:33:14-0400 | |
| Mohamad Abukassem |
| 2023-09-26T15:33:37-0400 | |
| Mohamad Abukassem |
File details come from the government source that posted it. Updated .