Attachment_6_Cost_Proposal_Spreadsheet.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- NUWC Division Keyport 2MMTR Services
- Solicitation number
- N6572626R3101
About this file
This is a Cost Proposal Spreadsheet template for Solicitation N6572626R3101, a Naval Sea Systems Command requirement for Miniature Microminiature (2M) Repair and Module Test & Repair (MTR) services. The spreadsheet is designed to capture cost data for a Cost Plus Fixed Fee (CPFF) task order with a base period and four optional years. The template requires offerors to submit detailed labor costs organized by eCRAFT labor categories, including direct labor hours and rates for individual employees, as well as indirect costs such as overhead, fringe benefits, and General & Administrative (G&A) expenses for both prime contractors and subcontractors. The spreadsheet also includes sections for Other Direct Costs (ODCs), fixed fee calculations, pass-through cost analysis, and fee analysis, with specific constraints limiting pass-through costs to a maximum of 8% and addressing prime contractor fees on subcontractor labor as defined in the SeaPort-e IDIQ contract terms. Offerors must demonstrate compliance with these cost allocation rules while providing transparent pricing across all contract line items and option years, with all costs tied to the Defense Priorities and Allocations System (DPAS) rating of DO-C9 for this small business set-aside requirement under the SeaPort Next Generation multiple-award contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CUI_N6572626R3101_QA_28MAY2026.pdf | ||
| Attachment 9_Wage Determination 2015-4341 REV 33.pdf | ||
| Attachment_5_Past_Performance_Reference.docx | DOCX document | |
| Solicitation - N6572626R3101.pdf | ||
| Attachment_3_Staffing_Plan.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal Spreadsheet
| SOLICITATION NO. N6572626R3101 - ATTACHMENT 6 |
| COST PROPOSAL SPREADSHEEET |
| Prime Offeror Name: | |||||||||||||||||||
| Subcontractor Name (if applicable): | |||||||||||||||||||
| DCAA Point of Contact Information: | |||||||||||||||||||
| Total for All Years | Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||
| Cost Elements | Company Labor Category | eCRAFT Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||
| Employee Name 1 | |||||||||||||||||||
| Employee Name 2 | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Total Direct Labor Cost | |||||||||||||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||
| Overhead | |||||||||||||||||||
| Fringe Benefits | |||||||||||||||||||
| G&A | |||||||||||||||||||
| Total Indirect Labor Cost | |||||||||||||||||||
| Total Direct and Indirect Labor cost | |||||||||||||||||||
| COM | |||||||||||||||||||
| Total Prime Contractor Labor Cost |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor * |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all CLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | ||
| Pass Through Amount (not including fee) | ||
| Prime Contractor Fee for Subcontractor Labor * | ||
| Total Pass Through Amount (including fee) | ERROR:#DIV/0! | |
| Maximum Pass Through Allowed by SeaPort-e IDIQ Contract | 8.00% |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | ||
| Fixed Fee for Labor Performed by Prime Contractor | ERROR:#DIV/0! | |
| Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract | ||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
File details come from the government source that posted it. Updated .