This document appears to be an Attachment_6__Cost_Proposal.xlsx file related to a federal contract opportunity for the Rehabilitation of Exterior Porches at the Gambrill Mansion. The contract is a Firm Fixed Price (FFP) type with Solicitation Number 140P2124R0051.

The document outlines the cost proposal for the base requirement of repairing the front porch, as well as two options for repairing the side porch/balcony and the rear porch. The cost breakdown includes labor, materials, and mobilization/demobilization for each area. No specific total price is provided, as the cost details are left blank. The related federal contract opportunity is for the National Park Service to procure the repair and preservation of the porches and balcony at the Gambrill House in Frederick, MD. The period of performance is 201 days after notice to proceed.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Price Proposal

PROCUREMENT DATA
Procurement Name:Rehabilitation of Exterior Porches at the Gambrill Mansion
Contract Type:FFP
Solititation Number:140P2124R0051
Period of Performance:201 day after NTP
Summary data, below, is autopulated from the worksheets. Do not edit this section.
SUMMARY DATATOTAL
Base Requirement: Front Porch$0.00
Option #1:Side Porch & Balcony Repairs$0.00
Option #2: Rear Porch Repairs$0.00
PROCUREMENT TOTAL:$0.00

Base Req.

FRONT PORCH Structure (NORTH) - LABOR
UnitHoursLabor RateAmount
1Install temporary roof supporthr0$0.00$0.00
2Demo balustrade, metal roof and gutter, roof substrate and ceiling boardshr0$0.00$0.00
3Demo, repair/replace compromised structural members of the roofhr0$0.00$0.00
4Repair decking and investigate and repair sturctural members of the floorhr0$0.00$0.00
5Repair / replace all wooden components to match exisiting components and paint new componentshr0$0.00$0.00
6Replace roof sheetinghr0$0.00$0.00
7Install high temperture resistant self adhering ice and water shieldhr0$0.00$0.00
8Replace metal roof/box gutter, leaders and downspoutshr0$0.00$0.00
9Replace/repair balustradehr0$0.00$0.00
SUBTOTAL$0.00
Materials & Supplies
Item DescriptionUnitQuantityCostTotal
1T-posteach0$0.00$0.00
2Plastic construction fenceeach0$0.00$0.00
3Caulktubes0$0.00$0.00
4Primergal0$0.00$0.00
5paintgal0$0.00$0.00
6paint supplieslump0$0.00$0.00
76 mil polyeach0$0.00$0.00
8Black metal screeningeach0$0.00$0.00
9Lumberlump0$0.00$0.00
10High temp ice and watershieldeach0$0.00$0.00
1116oz lead coated coppereach0$0.00$0.00
12Galvanized nailspackage0$0.00$0.00
13copper nailspackage0$0.00$0.00
14custom mill worklump0$0.00$0.00
15Soldering supplieslump0$0.00$0.00
16Cleaning agentgal0$0.00$0.00
SUBTOTAL$0.00
MOBILIZATION / DEMOBILIZATION
Item DescriptionUnitQuanityCost/UnitAmount
1Install tempory fence and controlslump0$0.00$0.00
2Porta John & Handwash Station (rental/service)weeks0$0.00$0.00
3Scaffolding (erection/dismantel)lump0$0.00$0.00
4Site Restoration & Repairlump0$0.00$0.00
SUBTOTAL$0.00
Subtotal Labor & Materials$0.00
Overhead and Admin at X% (Update formula in F43)$0.00
Contractor's Profit at X% (Update formula in F44)$0.00
Total Labor & Materials$0.00

Option #1

Task #1: 3rd Floor BalconyMaterialLaborEquipmentTotals
QtyUnitCost/UnitMtrl CostQtyUnitCost/UnitLabor CostQtyUnitCost/UnitEqmt Cost
Intall protection for below structures and achitechural elements1lump--0hr$ - 0$ - 01Lump$ - 0$ - 0
Clean, prep, prime and paint metal roof (Acrymax)1lump--0hr$ - 0$ - 01Lump$ - 0$ - 0$ - 0
Remove and replace animal control screen1lump--0hr$ - 0$ - 0$ - 0$ - 0
Remove and replace damaged/deteriorated finials and balustrade and replace with Sapele or Spanish Cedar1lump--0hr$ - 0$ - 0$ - 0$ - 0
Prepare, prime and paint all wooden components1lump--0hr$ - 0$ - 0$ - 0$ - 0
Subtotals$ - 0-$ - 0$ - 0$ - 0
Task #2: Side Porch (East)MaterialLaborEquipmentTotals
QtyUnitCost/UnitMtrl CostQtyUnitCost/UnitLabor CostQtyUnitCost/UnitEqmt Cost
Replace non-historic steps1lump0-0hr$ - 0$ - 0$ - 0$ - 0
Repair/replace/remove deteriorated wood components1lump0-0hr$ - 0$ - 0$ - 0$ - 0
Prepare, prime and paint all wooden components to include 3 vents1lump0-0hr$ - 0$ - 0$ - 0$ - 0
Repair, prepare, prime and paint metal handrails1lump--0hr$ - 0$ - 0$ - 0$ - 0
Prepare, prime and paint metal roof with Acrmax or similar product1lump--0hr$ - 0$ - 0$ - 0$ - 0
Replace gutters, leaders and add gutter guards1lump--0hr$ - 0$ - 0$ - 0
Subtotals$ - 0-$ - 0$ - 0$ - 0
Subtotal Labor & Materials$ - 0
Overhead and Admin at X% (Update formula in N21)$ - 0
Contractor's Profit at X% (Update formula in N22)$ - 0
Total Labor & Materials$ - 0

Option #2

TASK: Rear Porch Structure (West)
UnitHoursLabor RateAmount
1Install temporary roof supporthr0$0.00$0.00
2Demo metal roof and gutter, roof substrate and ceiling boardshr0$0.00$0.00
3Demo, repair/replace compromised structural members of the roofhr0$0.00$0.00
4Raise sagging corner at column failurehr0$0.00$0.00
5Repair / replace all wooden components to matchhr0$0.00$0.00
6Replace roof sheetinghr0$0.00$0.00
7Install high temperture resistant self adhering ice and water shieldhr0$0.00$0.00
8Replace metal roof/ gutters, leaders, jucntion boxes and downspoutshr0$0.00$0.00
9Install gutter guardshr0$0.00$0.00
10Reroute mini split condensation line for possitive flowhr0$0.00$0.00
SUBTOTAL$0.00
Materials & Supplies
Item DescriptionQuantityCostTotal
1T-post0$0.00$0.00
2Plastic construction fence0$0.00$0.00
3Caulk0$0.00$0.00
4Primer0$0.00$0.00
5Paint0$0.00$0.00
6Paint supplies0$0.00$0.00
76 mil poly0$0.00$0.00
8Black metal screening0$0.00$0.00
9Lumber0$0.00$0.00
10High temp ice and watershield0$0.00$0.00
1116oz lead coated copper0$0.00$0.00
12Galvanized nails0$0.00$0.00
13Copper nails0$0.00$0.00
14Custom mill work0$0.00$0.00
15Soldering supplies0$0.00$0.00
16Cleaning agent0$0.00$0.00
17Gutter Guards0$0.00$0.00
SUBTOTAL$0.00
TASK: MOBILIZATION / DEMOBILIZATION
UnitQuanityLumpAmount
1Install tempory fence and controlslump1$0.00$0.00
2Porta John & Handwash Station (rental/service)weeks5$0.00$0.00
3Scaffolding (erection/dismantel)lump1$0.00$0.00
4Site Restoration & Repairlump1$0.00$0.00
SUBTOTAL$0.00
Subtotal Labor & Materials$0.00
Overhead and Admin at X% (Update formula in F46)$0.00
Contractor's Profit at X% (Update formula in F47)$0.00
Total Labor & Materials$0.00