Attachment_6__Cost_Proposal.xlsx
XLSX spreadsheet 35 KB Posted
- Solicitation number
- 140P2124R0051
About this file
This document appears to be an Attachment_6__Cost_Proposal.xlsx file related to a federal contract opportunity for the Rehabilitation of Exterior Porches at the Gambrill Mansion. The contract is a Firm Fixed Price (FFP) type with Solicitation Number 140P2124R0051.
The document outlines the cost proposal for the base requirement of repairing the front porch, as well as two options for repairing the side porch/balcony and the rear porch. The cost breakdown includes labor, materials, and mobilization/demobilization for each area. No specific total price is provided, as the cost details are left blank. The related federal contract opportunity is for the National Park Service to procure the repair and preservation of the porches and balcony at the Gambrill House in Frederick, MD. The period of performance is 201 days after notice to proceed.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Price Proposal
| PROCUREMENT DATA | |
| Procurement Name: | Rehabilitation of Exterior Porches at the Gambrill Mansion |
| Contract Type: | FFP |
| Solititation Number: | 140P2124R0051 |
| Period of Performance: | 201 day after NTP | |
| Summary data, below, is autopulated from the worksheets. Do not edit this section. | ||
| SUMMARY DATA | TOTAL | |
| Base Requirement: Front Porch | $0.00 | |
| Option #1:Side Porch & Balcony Repairs | $0.00 | |
| Option #2: Rear Porch Repairs | $0.00 | |
| PROCUREMENT TOTAL: | $0.00 |
Base Req.
| FRONT PORCH Structure (NORTH) - LABOR | |||||
| Unit | Hours | Labor Rate | Amount | ||
| 1 | Install temporary roof support | hr | 0 | $0.00 | $0.00 |
| 2 | Demo balustrade, metal roof and gutter, roof substrate and ceiling boards | hr | 0 | $0.00 | $0.00 |
| 3 | Demo, repair/replace compromised structural members of the roof | hr | 0 | $0.00 | $0.00 |
| 4 | Repair decking and investigate and repair sturctural members of the floor | hr | 0 | $0.00 | $0.00 |
| 5 | Repair / replace all wooden components to match exisiting components and paint new components | hr | 0 | $0.00 | $0.00 |
| 6 | Replace roof sheeting | hr | 0 | $0.00 | $0.00 |
| 7 | Install high temperture resistant self adhering ice and water shield | hr | 0 | $0.00 | $0.00 |
| 8 | Replace metal roof/box gutter, leaders and downspouts | hr | 0 | $0.00 | $0.00 |
| 9 | Replace/repair balustrade | hr | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| Materials & Supplies | |||||
| Item Description | Unit | Quantity | Cost | Total | |
| 1 | T-post | each | 0 | $0.00 | $0.00 |
| 2 | Plastic construction fence | each | 0 | $0.00 | $0.00 |
| 3 | Caulk | tubes | 0 | $0.00 | $0.00 |
| 4 | Primer | gal | 0 | $0.00 | $0.00 |
| 5 | paint | gal | 0 | $0.00 | $0.00 |
| 6 | paint supplies | lump | 0 | $0.00 | $0.00 |
| 7 | 6 mil poly | each | 0 | $0.00 | $0.00 |
| 8 | Black metal screening | each | 0 | $0.00 | $0.00 |
| 9 | Lumber | lump | 0 | $0.00 | $0.00 |
| 10 | High temp ice and watershield | each | 0 | $0.00 | $0.00 |
| 11 | 16oz lead coated copper | each | 0 | $0.00 | $0.00 |
| 12 | Galvanized nails | package | 0 | $0.00 | $0.00 |
| 13 | copper nails | package | 0 | $0.00 | $0.00 |
| 14 | custom mill work | lump | 0 | $0.00 | $0.00 |
| 15 | Soldering supplies | lump | 0 | $0.00 | $0.00 |
| 16 | Cleaning agent | gal | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| MOBILIZATION / DEMOBILIZATION | |||||
| Item Description | Unit | Quanity | Cost/Unit | Amount | |
| 1 | Install tempory fence and controls | lump | 0 | $0.00 | $0.00 |
| 2 | Porta John & Handwash Station (rental/service) | weeks | 0 | $0.00 | $0.00 |
| 3 | Scaffolding (erection/dismantel) | lump | 0 | $0.00 | $0.00 |
| 4 | Site Restoration & Repair | lump | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| Subtotal Labor & Materials | $0.00 | ||||
| Overhead and Admin at X% (Update formula in F43) | $0.00 | ||||
| Contractor's Profit at X% (Update formula in F44) | $0.00 | ||||
| Total Labor & Materials | $0.00 |
Option #1
| Task #1: 3rd Floor Balcony | Material | Labor | Equipment | Totals | |||||||||
| Qty | Unit | Cost/Unit | Mtrl Cost | Qty | Unit | Cost/Unit | Labor Cost | Qty | Unit | Cost/Unit | Eqmt Cost | ||
| Intall protection for below structures and achitechural elements | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | 1 | Lump | $ - 0 | $ - 0 | |
| Clean, prep, prime and paint metal roof (Acrymax) | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | 1 | Lump | $ - 0 | $ - 0 | $ - 0 |
| Remove and replace animal control screen | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Remove and replace damaged/deteriorated finials and balustrade and replace with Sapele or Spanish Cedar | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prepare, prime and paint all wooden components | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Subtotals | $ - 0 | - | $ - 0 | $ - 0 | $ - 0 |
| Task #2: Side Porch (East) | Material | Labor | Equipment | Totals | |||||||||
| Qty | Unit | Cost/Unit | Mtrl Cost | Qty | Unit | Cost/Unit | Labor Cost | Qty | Unit | Cost/Unit | Eqmt Cost | ||
| Replace non-historic steps | 1 | lump | 0 | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Repair/replace/remove deteriorated wood components | 1 | lump | 0 | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prepare, prime and paint all wooden components to include 3 vents | 1 | lump | 0 | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Repair, prepare, prime and paint metal handrails | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prepare, prime and paint metal roof with Acrmax or similar product | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Replace gutters, leaders and add gutter guards | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | ||||
| Subtotals | $ - 0 | - | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal Labor & Materials | $ - 0 | ||||||||||||
| Overhead and Admin at X% (Update formula in N21) | $ - 0 | ||||||||||||
| Contractor's Profit at X% (Update formula in N22) | $ - 0 | ||||||||||||
| Total Labor & Materials | $ - 0 |
Option #2
| TASK: Rear Porch Structure (West) | |||||
| Unit | Hours | Labor Rate | Amount | ||
| 1 | Install temporary roof support | hr | 0 | $0.00 | $0.00 |
| 2 | Demo metal roof and gutter, roof substrate and ceiling boards | hr | 0 | $0.00 | $0.00 |
| 3 | Demo, repair/replace compromised structural members of the roof | hr | 0 | $0.00 | $0.00 |
| 4 | Raise sagging corner at column failure | hr | 0 | $0.00 | $0.00 |
| 5 | Repair / replace all wooden components to match | hr | 0 | $0.00 | $0.00 |
| 6 | Replace roof sheeting | hr | 0 | $0.00 | $0.00 |
| 7 | Install high temperture resistant self adhering ice and water shield | hr | 0 | $0.00 | $0.00 |
| 8 | Replace metal roof/ gutters, leaders, jucntion boxes and downspouts | hr | 0 | $0.00 | $0.00 |
| 9 | Install gutter guards | hr | 0 | $0.00 | $0.00 |
| 10 | Reroute mini split condensation line for possitive flow | hr | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| Materials & Supplies | |||||
| Item Description | Quantity | Cost | Total | ||
| 1 | T-post | 0 | $0.00 | $0.00 | |
| 2 | Plastic construction fence | 0 | $0.00 | $0.00 | |
| 3 | Caulk | 0 | $0.00 | $0.00 | |
| 4 | Primer | 0 | $0.00 | $0.00 | |
| 5 | Paint | 0 | $0.00 | $0.00 | |
| 6 | Paint supplies | 0 | $0.00 | $0.00 | |
| 7 | 6 mil poly | 0 | $0.00 | $0.00 | |
| 8 | Black metal screening | 0 | $0.00 | $0.00 | |
| 9 | Lumber | 0 | $0.00 | $0.00 | |
| 10 | High temp ice and watershield | 0 | $0.00 | $0.00 | |
| 11 | 16oz lead coated copper | 0 | $0.00 | $0.00 | |
| 12 | Galvanized nails | 0 | $0.00 | $0.00 | |
| 13 | Copper nails | 0 | $0.00 | $0.00 | |
| 14 | Custom mill work | 0 | $0.00 | $0.00 | |
| 15 | Soldering supplies | 0 | $0.00 | $0.00 | |
| 16 | Cleaning agent | 0 | $0.00 | $0.00 | |
| 17 | Gutter Guards | 0 | $0.00 | $0.00 | |
| SUBTOTAL | $0.00 | ||||
| TASK: MOBILIZATION / DEMOBILIZATION | |||||
| Unit | Quanity | Lump | Amount | ||
| 1 | Install tempory fence and controls | lump | 1 | $0.00 | $0.00 |
| 2 | Porta John & Handwash Station (rental/service) | weeks | 5 | $0.00 | $0.00 |
| 3 | Scaffolding (erection/dismantel) | lump | 1 | $0.00 | $0.00 |
| 4 | Site Restoration & Repair | lump | 1 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| Subtotal Labor & Materials | $0.00 | ||||
| Overhead and Admin at X% (Update formula in F46) | $0.00 | ||||
| Contractor's Profit at X% (Update formula in F47) | $0.00 | ||||
| Total Labor & Materials | $0.00 |