Attachment_6__Revised_Cost_Proposal_0002.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Gambrill House Porches/Balcony Preservation, HPTC
Solicitation number
140P2124R0051
Issued by

About this file

This document appears to be a revised cost proposal attachment related to a federal contract opportunity for the rehabilitation of exterior porches at the Gambrill Mansion.

The key details are:

  • The solicitation number is 140P2124R0051.
  • The contract type is Firm Fixed Price (FFP).
  • The period of performance is 201 days after Notice to Proceed.
  • The summary pricing data shows a total of $0.00 for the base requirement of the Front Porch and Option #1 for the Side Porch & Balcony Repairs.
  • The statement of work includes tasks such as demolition, repair/replacement of structural members, roofing, gutters, balustrade, and painting for the Front Porch and Side Porch/Balcony.
  • The contract is being awarded by the Department of the Interior National Park Service.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Price Proposal

PROCUREMENT DATA
Procurement Name:Rehabilitation of Exterior Porches at the Gambrill Mansion
Contract Type:FFP
Solititation Number:140P2124R0051
Period of Performance:201 days after Notice to Proceed
Summary data, below, is autopulated from the worksheets. Do not edit this section.
SUMMARY DATATOTAL
Base Requirement: Front Porch$0.00
Option #1: Side Porch & Balcony Repairs$0.00

PROCUREMENT TOTAL: $0.00

Base Req.

FRONT PORCH Structure (NORTH) - LABOR
UnitHoursLabor RateAmount
1Install temporary roof supporthr0$0.00$0.00
2Demo balustrade, metal roof and gutter, roof substrate and ceiling boardshr0$0.00$0.00
3Demo, repair/replace compromised structural members of the roofhr0$0.00$0.00
4Repair decking and investigate and repair sturctural members of the floorhr0$0.00$0.00
5Repair / replace all wooden components to match exisiting components and paint new componentshr0$0.00$0.00
6Replace roof sheetinghr0$0.00$0.00
7Install high temperture resistant self adhering ice and water shieldhr0$0.00$0.00
8Replace metal roof/box gutter, leaders and downspoutshr0$0.00$0.00
9Replace/repair balustradehr0$0.00$0.00
SUBTOTAL$0.00
Materials & Supplies
Item DescriptionUnitQuantityCostTotal
1T-posteach0$0.00$0.00
2Plastic construction fenceeach0$0.00$0.00
3Caulktubes0$0.00$0.00
4Primergal0$0.00$0.00
5paintgal0$0.00$0.00
6paint supplieslump0$0.00$0.00
76 mil polyeach0$0.00$0.00
8Black metal screeningeach0$0.00$0.00
9Lumberlump0$0.00$0.00
10High temp ice and watershieldeach0$0.00$0.00
1116oz lead coated coppereach0$0.00$0.00
12Galvanized nailspackage0$0.00$0.00
13copper nailspackage0$0.00$0.00
14custom mill worklump0$0.00$0.00
15Soldering supplieslump0$0.00$0.00
16Cleaning agentgal0$0.00$0.00
SUBTOTAL$0.00
MOBILIZATION / DEMOBILIZATION
Item DescriptionUnitQuanityCost/UnitAmount
1Install tempory fence and controlslump0$0.00$0.00
2Porta John & Handwash Station (rental/service)weeks0$0.00$0.00
3Scaffolding (erection/dismantel)lump0$0.00$0.00
4Site Restoration & Repairlump0$0.00$0.00
SUBTOTAL$0.00
Subtotal Labor & Materials$0.00
Overhead and Admin at X% (Update formula in F43)$0.00
Contractor's Profit at X% (Update formula in F44)$0.00
Total Labor & Materials$0.00

Option #1

Task #1: 3rd Floor BalconyMaterialLaborEquipmentTotals
QtyUnitCost/UnitMtrl CostQtyUnitCost/UnitLabor CostQtyUnitCost/UnitEqmt Cost
Intall protection for below structures and achitechural elements1lump--0hr$ - 0$ - 01Lump$ - 0$ - 0
Clean, prep, prime and paint metal roof (Acrymax)1lump--0hr$ - 0$ - 01Lump$ - 0$ - 0$ - 0
Remove and replace animal control screen1lump--0hr$ - 0$ - 0$ - 0$ - 0
Remove and replace damaged/deteriorated finials and balustrade and replace with Sapele or Spanish Cedar1lump--0hr$ - 0$ - 0$ - 0$ - 0
Prepare, prime and paint all wooden components1lump--0hr$ - 0$ - 0$ - 0$ - 0
Subtotals$ - 0-$ - 0$ - 0$ - 0
Task #2: Side Porch (East)MaterialLaborEquipmentTotals
QtyUnitCost/UnitMtrl CostQtyUnitCost/UnitLabor CostQtyUnitCost/UnitEqmt Cost
Replace non-historic steps1lump0-0hr$ - 0$ - 0$ - 0$ - 0
Repair/replace/remove deteriorated wood components1lump0-0hr$ - 0$ - 0$ - 0$ - 0
Prepare, prime and paint all wooden components to include 3 vents1lump0-0hr$ - 0$ - 0$ - 0$ - 0
Repair, prepare, prime and paint metal handrails1lump--0hr$ - 0$ - 0$ - 0$ - 0
Prepare, prime and paint metal roof with Acrmax or similar product1lump--0hr$ - 0$ - 0$ - 0$ - 0
Replace gutters, leaders and add gutter guards1lump--0hr$ - 0$ - 0$ - 0
Subtotals$ - 0-$ - 0$ - 0$ - 0
Subtotal Labor & Materials$ - 0
Overhead and Admin at X% (Update formula in N21)$ - 0
Contractor's Profit at X% (Update formula in N22)$ - 0
Total Labor & Materials$ - 0