Attachment_6__Revised_Cost_Proposal_0002.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- 140P2124R0051
About this file
This document appears to be a revised cost proposal attachment related to a federal contract opportunity for the rehabilitation of exterior porches at the Gambrill Mansion.
The key details are:
- The solicitation number is 140P2124R0051.
- The contract type is Firm Fixed Price (FFP).
- The period of performance is 201 days after Notice to Proceed.
- The summary pricing data shows a total of $0.00 for the base requirement of the Front Porch and Option #1 for the Side Porch & Balcony Repairs.
- The statement of work includes tasks such as demolition, repair/replacement of structural members, roofing, gutters, balustrade, and painting for the Front Porch and Side Porch/Balcony.
- The contract is being awarded by the Department of the Interior National Park Service.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Price Proposal
| PROCUREMENT DATA | |
| Procurement Name: | Rehabilitation of Exterior Porches at the Gambrill Mansion |
| Contract Type: | FFP |
| Solititation Number: | 140P2124R0051 |
| Period of Performance: | 201 days after Notice to Proceed | |
| Summary data, below, is autopulated from the worksheets. Do not edit this section. | ||
| SUMMARY DATA | TOTAL | |
| Base Requirement: Front Porch | $0.00 | |
| Option #1: Side Porch & Balcony Repairs | $0.00 |
PROCUREMENT TOTAL: $0.00
Base Req.
| FRONT PORCH Structure (NORTH) - LABOR | |||||
| Unit | Hours | Labor Rate | Amount | ||
| 1 | Install temporary roof support | hr | 0 | $0.00 | $0.00 |
| 2 | Demo balustrade, metal roof and gutter, roof substrate and ceiling boards | hr | 0 | $0.00 | $0.00 |
| 3 | Demo, repair/replace compromised structural members of the roof | hr | 0 | $0.00 | $0.00 |
| 4 | Repair decking and investigate and repair sturctural members of the floor | hr | 0 | $0.00 | $0.00 |
| 5 | Repair / replace all wooden components to match exisiting components and paint new components | hr | 0 | $0.00 | $0.00 |
| 6 | Replace roof sheeting | hr | 0 | $0.00 | $0.00 |
| 7 | Install high temperture resistant self adhering ice and water shield | hr | 0 | $0.00 | $0.00 |
| 8 | Replace metal roof/box gutter, leaders and downspouts | hr | 0 | $0.00 | $0.00 |
| 9 | Replace/repair balustrade | hr | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| Materials & Supplies | |||||
| Item Description | Unit | Quantity | Cost | Total | |
| 1 | T-post | each | 0 | $0.00 | $0.00 |
| 2 | Plastic construction fence | each | 0 | $0.00 | $0.00 |
| 3 | Caulk | tubes | 0 | $0.00 | $0.00 |
| 4 | Primer | gal | 0 | $0.00 | $0.00 |
| 5 | paint | gal | 0 | $0.00 | $0.00 |
| 6 | paint supplies | lump | 0 | $0.00 | $0.00 |
| 7 | 6 mil poly | each | 0 | $0.00 | $0.00 |
| 8 | Black metal screening | each | 0 | $0.00 | $0.00 |
| 9 | Lumber | lump | 0 | $0.00 | $0.00 |
| 10 | High temp ice and watershield | each | 0 | $0.00 | $0.00 |
| 11 | 16oz lead coated copper | each | 0 | $0.00 | $0.00 |
| 12 | Galvanized nails | package | 0 | $0.00 | $0.00 |
| 13 | copper nails | package | 0 | $0.00 | $0.00 |
| 14 | custom mill work | lump | 0 | $0.00 | $0.00 |
| 15 | Soldering supplies | lump | 0 | $0.00 | $0.00 |
| 16 | Cleaning agent | gal | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| MOBILIZATION / DEMOBILIZATION | |||||
| Item Description | Unit | Quanity | Cost/Unit | Amount | |
| 1 | Install tempory fence and controls | lump | 0 | $0.00 | $0.00 |
| 2 | Porta John & Handwash Station (rental/service) | weeks | 0 | $0.00 | $0.00 |
| 3 | Scaffolding (erection/dismantel) | lump | 0 | $0.00 | $0.00 |
| 4 | Site Restoration & Repair | lump | 0 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||||
| Subtotal Labor & Materials | $0.00 | ||||
| Overhead and Admin at X% (Update formula in F43) | $0.00 | ||||
| Contractor's Profit at X% (Update formula in F44) | $0.00 | ||||
| Total Labor & Materials | $0.00 |
Option #1
| Task #1: 3rd Floor Balcony | Material | Labor | Equipment | Totals | |||||||||
| Qty | Unit | Cost/Unit | Mtrl Cost | Qty | Unit | Cost/Unit | Labor Cost | Qty | Unit | Cost/Unit | Eqmt Cost | ||
| Intall protection for below structures and achitechural elements | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | 1 | Lump | $ - 0 | $ - 0 | |
| Clean, prep, prime and paint metal roof (Acrymax) | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | 1 | Lump | $ - 0 | $ - 0 | $ - 0 |
| Remove and replace animal control screen | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Remove and replace damaged/deteriorated finials and balustrade and replace with Sapele or Spanish Cedar | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prepare, prime and paint all wooden components | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Subtotals | $ - 0 | - | $ - 0 | $ - 0 | $ - 0 |
| Task #2: Side Porch (East) | Material | Labor | Equipment | Totals | |||||||||
| Qty | Unit | Cost/Unit | Mtrl Cost | Qty | Unit | Cost/Unit | Labor Cost | Qty | Unit | Cost/Unit | Eqmt Cost | ||
| Replace non-historic steps | 1 | lump | 0 | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Repair/replace/remove deteriorated wood components | 1 | lump | 0 | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prepare, prime and paint all wooden components to include 3 vents | 1 | lump | 0 | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Repair, prepare, prime and paint metal handrails | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Prepare, prime and paint metal roof with Acrmax or similar product | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Replace gutters, leaders and add gutter guards | 1 | lump | - | - | 0 | hr | $ - 0 | $ - 0 | $ - 0 | ||||
| Subtotals | $ - 0 | - | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal Labor & Materials | $ - 0 | ||||||||||||
| Overhead and Admin at X% (Update formula in N21) | $ - 0 | ||||||||||||
| Contractor's Profit at X% (Update formula in N22) | $ - 0 | ||||||||||||
| Total Labor & Materials | $ - 0 |