Attachment 6-B585 Existing Utilities.pdf
PDF 1 MB Posted
- Attached to
- Replace HVAC West Fitness Center
- Solicitation number
- FA940126R0019
About this file
This document is a utility layout map for Building 585 (BLDG 585) that illustrates the existing infrastructure systems servicing the facility. The map identifies six primary utility systems: the Water Supply System (G-1) with main and service water lines, fire hydrants, and gates; the Sewer System (G-2) featuring wastewater gravity mains and service lines with clean-outs and manholes; the Electrical Distribution System (G-4) showing overhead and underground primary and secondary lines, utility poles, exterior lighting, electrical meters, pole-mounted transformers, and overhead disconnects; the Steam Supply System (G-5) with valves and supply fittings; and the Natural Gas Distribution System (G-6) with control valves and service lines marked as either in-service or abandoned.
The aerial photograph component of the map displays the physical location of Building 585 (shown in blue) relative to surrounding facilities including a red brick building with sports courts and a green athletic field to the west, parking areas to the south along Aberdeen Avenue SE, and various utility infrastructure elements positioned throughout the area. The utility lines are color-coded and overlaid on the imagery to show their spatial relationships and routing across the property and surrounding areas. A scale of 0 to 200 feet and directional compass are provided for reference. This attachment serves as reference documentation for understanding existing utility connections and infrastructure that may be relevant to facility modifications, maintenance planning, or capital improvement projects.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jason Cir SE Jason Cir SE
Aberdeen Ave SE Aberdeen Ave SE
E il e e n S t S E l l l l
!2!
!2!
!2!
!2!
R
!!2
!!2 !!2 ss &.
&.!Ñ
!Ñ !Ñ
!Ñ
!Ñ
!Ñ
!Ñ
!Ñ
!G !G
!G
!G !G
MRCOG-NM,BHI,BernCo GIS, Microsoft, Vantor, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community
BLDG 585 Utility Layout
Comm Comm Line
!G Comm Manhole
G-1 Water Supply System
!Ñ Fire Hydrant
&. Gate
Water Lines Main Water Line
Service Water Line
Irrigation
G-2 Sewer System s Wastewater Clean Out
!!2 Wastewater Manhole
Wastewater Lines Wastewater Gravity Main
Wastewater Gravity Service
G-4 Electrical Distribution System
! Utility Poles /. Electrical Exterior Light
R Electrical Meter
!2! Manhole l Pole Mount XFM
Overhead Disconnect
Electrical Lines Electrical Primary - Overhead
Electrical Primary - Underground
Electrical Secondary - Overhead
Electrical Secondary - Underground
Electrical Transmission - Overhead
G-5 Steam Supply System
Valve
Steam Supply
Fitting
G-6 Natural Gas Distrbitution System $ Natural Gas Control
Valve
Natural Gas Lines In Service
Abandoned
Abandoned
In Service
0 50 100 150 200 Feet ±
Attachment C- B585 Existing Utilities