Attachment 5 - Technical Worksheet_Guam SRTS.docx
DOCX document 45 KB Posted
- Attached to
- Guam S&RTS Solicitation
- Solicitation number
- HTC711-26-R-E133
About this file
This is a Technical Worksheet attachment to Request for Proposal HTC71126RE133 for Stevedoring and Related Terminal Services (S&RTS) at ports in Guam. Offerors must provide substantive responses to five evaluation areas based on requirements outlined in the Performance Work Statement (PWS), with written technical responses limited to 15 pages including all narrative, descriptive content, appendices, annexes, figures, and tables.
The evaluation criteria require offerors to demonstrate their ability to: (1) provide qualified labor capable of flexible scheduling, multiple work sites, and 24/7 contingency operations; (2) execute conveyance loading and discharge operations for all cargo classes; (3) secure and operate Material Handling Equipment including tow equipment for vehicles up to 150,000 lbs and ramps rated to 70 tons, with maintenance support capabilities; (4) meet training and certification requirements for Ammunition and Explosives (AE) handling per applicable regulations; and (5) obtain required certifications and port access, specifically including current HAZMAT certification for at least two personnel per 49 CFR Title 49 Section 172.702, valid business licenses or work permits from the Host Nation within 30 days of award, and demonstrated ability to support secondary ports in Saipan and Tinian with appropriate certifications and compliance with international, country, and local regulations. Responses rated "unacceptable" on any question will result in overall rejection of the technical proposal.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP HTC71126RE133 – Attachment 5 Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)
Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)
Attachment 5: Technical Worksheet
Request for Proposal: HTC71126RE133
** Submission Rules & Instructions: **
1. Basis for Responses: All Offeror responses within this Technical Worksheet must be based on the requirements outlined in Attachment 1, Performance Work Statement (PWS). Offerors shall assume the Government has no prior knowledge of their company's experience.
2. Substantive Responses Required: Offerors shall not simply rephrase or restate the Government's requirements. They must provide clear and convincing rationale demonstrating how they intend to meet the minimum requirements identified in the PWS. Responses that merely paraphrase the PWS, provide flowcharts listing PWS activities without explanation, or use generic phrases like "standard procedures will be employed" without detailed descriptions will be considered unacceptable.
3. Page Limit for Technical Evaluation: The Offeror's written technical response within this Worksheet shall not exceed 15 pages. This limit applies to all narrative and descriptive content provided for evaluation, including appendices, annexes, figures, and tables directly supporting the written response. Content exceeding this 15-page limit will be removed before evaluation.
4. Exclusions from Page Limit: The following content will not be subjected to the page limit:
· Cover Sheet
· Table of Contents
· Government-provided Instruction Page(s)
· Material Handling Equipment (MHE) Photographs
· HAZMAT Certification
· Signed self-certified letters
· Business Licenses
· Work Permits
5. Foreign Language Documents: Offerors must provide certified English translations for any supporting document issued in a language other than English (e.g., port certifications, licenses, permits). Documents shall be clearly titled and/or marked to allow easy identification of the original document and its corresponding English translation.
NOTE** Failure to complete this document in its entirety or attach requested documents may result in an Offeror being ineligible for award.
RATINGS:
| ACCEPTABLE |
| Proposal clearly meets the minimum requirements of the solicitation |
| UNACCEPTABLE |
| Proposal does not clearly meet the minimum requirements of the solicitation |
*An “unacceptable” rating on any question below will result in an overall “unacceptable” Technical Worksheet rating.
The Government will evaluate the Offeror’s technical approach to determine if the Offeror submitted a sound approach for accomplishing the PWS task areas identified below:
Offeror Name:
1. Labor Please describe your company’s ability to provide qualified and appropriate labor types necessary to meet the Government’s port support needs and required productivity. Include in your response how this labor will be utilized to provide flexible start times, operate multiple work sites, and transition to contingency operations, maintaining work schedules 24/7 as outlined in the PWS. (PWS Sections 3, 4, 5, and 6) Click here to enter text.
2. Conveyance Loading/Discharge.
Please provide your experience and process for unloading/discharging conveyances associated with the requirements outlined in the PWS. (PWS - Section 5) Click here to enter text.
3. Equipment Please describe your company’s ability to secure, provide, and safely use the following: Material Handling Equipment (MHE), gear capable of moving all classes of cargo (vehicles, containers, aircraft, and breakbulk), and ramps (fixed or portable) with a capacity up to 70 Ton (or 72,574 Kgs). Include in your response how you will provide heavy tow equipment capable of handling inoperable wheel or track vehicles weighing up to 150,000 Lbs. (68,038.9 Kgs). Your response shall also address how you will provide maintenance support for the required equipment. (PWS Sections 4, 5, and 6) Click here to enter text.
4. Explosive Cargo Handling, Training, and Qualification Requirements Please describe your company’s ability to meet required training and certification to perform tasks related to handling Ammunition and Explosives (AE). (PWS paragraphs 6.9.9. – 6.9.9.7.)
Click here to enter text.
5. Certifications/Port Access
5a. HAZMAT Certifications. Provide proof of current certification or signed self-certified letter stating at least two proposed personnel are trained and tested in handling Hazardous Material per the requirements of the Code of Federal Regulation (CFR) Title 49, Section 172.702, or Host Nation equivalent. (PWS Sections 5 and 6) Click here to enter text.
5b. Port Access - Guam. Describe how your company will comply with PWS 4.1.1. (e.g., what steps will be taken) to obtain a valid and current business license or work permit for the prime and/or subcontractors issued by the applicable Host Nation as evidence to legally work at Naval Base Guam and Guam Port Authority within thirty (30) calendar days of contract award. (PWS Section 4) Click here to enter text.
5c. Port Access – Secondary Ports. Describe your company’s ability to provide S&RTS services IAW PWS requirements at secondary port locations of Saipan and Tinian if/when requirements are identified. Include your company’s ability to meet the technical acceptability requirements in PWS Appendix C, paragraph 3.4.1., to provide required labor and equipment; documentary evidence of port certifications, licensing, permits, and/or HAZMAT certificates; and ability to meet international, country, and local standards and regulations and DoD statutory and regulatory requirements. (PWS Appendix C) Click here to enter text.
File details come from the government source that posted it. Updated .