Attachment 5 - Technical Worksheet.docx

DOCX document 35 KB Posted

Attached to
S&RTS Mid-Atlantic Ports
Solicitation number
HTC71125RE133
Issued by

About this file

The document is a Technical Worksheet for Request for Proposal (RFP) HTC71125RE133, providing detailed submission guidelines for a Stevedoring and Related Terminal Services (S&RTS) contract for the Mid-Atlantic Ports. The worksheet outlines strict technical response requirements, including a 25-page limit, mandating that offerors provide substantive, detailed explanations of how they will meet contract specifications for labor, equipment, certifications, and port access.

Key technical evaluation areas include: (1) Labor capabilities for providing qualified personnel to support port operations with flexible start times and 24/7 work schedules, (2) Equipment provisions for Material Handling Equipment (MHE) capable of moving all cargo classes, including heavy tow equipment for vehicles up to 150,000 lbs, and (3) Certifications demonstrating HAZMAT handling capabilities and valid business licenses/work permits for operations at ports in Charleston (SC), Savannah (GA), Wilmington (NC), and Morehead City (NC). Proposals will be rated as either "Acceptable" or "Unacceptable" based on meeting minimum solicitation requirements, with an unacceptable rating on any section resulting in an overall unacceptable technical evaluation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP HTC71125RE133 – Attachment 5 Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)

Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)

Attachment 5: Technical Worksheet

Request for Proposal: HTC71125RE133

** Submission Rules & Instructions: **

1. Basis for Responses: All Offeror responses within this Technical Worksheet must be based on the requirements outlined in Attachment 1, Performance Work Statement (PWS). Offerors shall assume the Government has no prior knowledge of their company's experience.

2. Substantive Responses Required: Offerors shall not simply rephrase or restate the Government's requirements. They must provide clear and convincing rationale demonstrating how they intend to meet the minimum requirements identified in the PWS. Responses that merely paraphrase the PWS, provide flowcharts listing PWS activities without explanation, or use generic phrases like "standard procedures will be employed" without detailed descriptions will be considered unacceptable.

3. Page Limit for Technical Evaluation: The Offeror's written technical response within this Worksheet shall not exceed 25 pages. This limit applies to all narrative and descriptive content provided for evaluation, including appendices, annexes, figures, and tables directly supporting the written response. Content exceeding this 25-page limit will be removed before evaluation.

4. Exclusions from Page Limit: The following content will not be subjected to the page limit:

· Cover Sheet

· Table of Contents

· Government-provided Instruction Page(s)

· Material Handling Equipment (MHE) Photographs

· HAZMAT Certification

· Signed self-certified letters

· Business Licenses

· Work Permits

5. Foreign Language Documents: Offerors must provide certified English translations for any supporting document issued in a language other than English (e.g., port certifications, licenses, permits). Documents shall be clearly titled and/or marked to allow easy identification of the original document and its corresponding English translation.

NOTE** Failure to complete this document in its entirety or attach requested documents may result in an Offeror being ineligible for award.

RATINGS:

ACCEPTABLE
Proposal clearly meets the minimum requirements of the solicitation
UNACCEPTABLE
Proposal does not clearly meet the minimum requirements of the solicitation

*An “unacceptable” rating on any question below will result in an overall “unacceptable” Technical Worksheet rating.

The Government will evaluate the Offeror’s technical approach to determine if the Offeror submitted a sound approach for accomplishing the PWS task areas identified below:

1. Labor

Please describe your company’s ability to provide qualified and appropriate labor types necessary to meet the Government’s port support needs and required productivity. Include in your response how this labor will be utilized to provide flexible start times, operate multiple work sites, and transition to contingency operations, maintaining work schedules 24/7 as outlined in the PWS. (Ref PWS - 4.1.4, 4.12, 4.17, 4.26, 4.26.3) Click here to enter text.

2. Equipment

Please describe your company’s ability to secure, provide, and safely use the following: Material Handling Equipment (MHE), gear capable of moving all classes of cargo (vehicles, containers, aircraft, and breakbulk), and ramps (fixed or portable) with a capacity up to 70 Ton (or 72,574 Kgs). Include in your response how you will provide heavy tow equipment capable of handling inoperable wheel or track vehicles weighing up to 150,000 Lbs (68,038.9 Kgs). Your response shall also address how you will provide maintenance support for the required equipment. (Ref PWS - 1.2.1.3, 3.2.4, 5.0, 5.11, 5.11.3, 5.12.3, 5.12.5.1) Click here to enter text.

3. Certifications/Port Access

3a. HAZMAT Certifications. Provide proof of current certification or signed self-certified letter stating at least two proposed personnel are trained and tested in handling Hazardous Material per the requirements of the Code of Federal Regulation (CFR) Title 49, Section 172.702, or Host Nation equivalent. (Ref PWS 5.2.7) Click here to enter text.

3b. Port Access. Provide proof of a valid and current business license or work permit for the prime and/or subcontractors issued by the applicable Host Nation as evidence to legally work at all named ports within the PWS. (Ref PWS 4.1.1) Click here to enter text.