Attachment 5 - Submittal Register.xlsx

XLSX spreadsheet 80 KB Posted

Attached to
Y1DA--EHRM Training and Admin Phase II - Poplar Bluff Federal contract opportunity
Solicitation number
36C77623B0028
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a submittal register for a federal construction project to provide training and administration services to the Department of Veterans Affairs. It details over 200 submittal items required of the contractor organized by specification section and paragraph, including schedules, plans, shop drawings, manuals, certificates, test reports, and closeout documents. Key submittals include a critical path schedule, safety plan, commissioning plan, operations and maintenance manuals, staff qualifications, and training agenda. The register specifies due dates for initial and updated submissions and allows space to track review status and actions required for each item. It appears to be a comprehensive checklist the agency can use to monitor and ensure completeness and compliance of all contractor documentation required for the project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Training and Admin Phase II - Poplar Bluff, newest first.
File Type Posted
Technical Questions Tracking Spreadsheet - PB TASS PH2 - Updated Final Response 8-9-2023.pdf PDF
36C77623B0028 0004.docx DOCX document
Technical Questions Tracking Spreadsheet - PB TASS PH2 - Final Response 8-8-2023.pdf PDF
Wage Determination - Construction - Butler - 6-30-2023.pdf PDF
36C77623B0028 0003.docx DOCX document
36C77623B0028 0002.docx DOCX document
36C77623B0028 0001.docx DOCX document
657A4-22-706 Construction Prebid Attendance Site Visit sign-in sheet.pdf PDF
Attachment 11 - Site Visit Instructions.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 1 - EHRM Training and Adm - Specs.pdf PDF
Attachment 7 - RECORDS MANAGEMENT OBLIGATIONS.pdf PDF
Attachment 2 - EHRM Training and Admin -Drawings.pdf PDF
36C77623B0028_1.docx DOCX document
Attachment 12 - Site Visit Map.pdf PDF
Attachment 10 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 8 - Wage Determination - Butler County - 06.16.23.pdf PDF
Attachment 6 - OIT for SOW VA Handbook 6500.6 Appendix C POP_PrivacyOnly.pdf PDF
Attachment 4 - Asbestos and Lead Inspection Report - Building 1 - Part 2 of 2.pdf PDF
Attachment 3 - Asbestos and Lead Inspection Report - Building 1 - Part 1 of 2.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANS #1

CONTRACTOR'S SUBMITTAL TRANSMITTAL CONTRACT NO. TRANSMITTAL NO. DATE

FROM CONTRACTOR PROJECT TITLE & LOCATION

TO

CONTRACTOR USE ONLYREVIEWER USE ONLY
List only one specification division per form.** ACTION CODES
A - Approved
List only one of the following categories on each transmittal form,D - Disapproved
and indicate which is being submittedAN - Approved as noted
Contractor ApprovalOICC Approval Deviation / SubRA - Receipt acknowledged
For OICC ApprovalC - Comments
R - Resubmit
ITEM NO.PROJ. SPEC. SECT.ITEM IDENTIFICATIONNO. OF COPIESACTION CODESREVIEWER'S
& PARA. AND/OR(TYPE, SIZE, MODEL NO., MFG. NAME, DWG. OR**INITIALS
PROJ. DWG. NO.BROCHURE NUMBER)CODE & DATE

CONTRACTOR'S COMMENTS :

COPY OF TRANSMITTAL AND SUBMITTALS TO ROICC CONTRACTOR REPRESENTATIVE (Signature)

DATE RECEIVED BY REVIEWER FROM (REVIEWER) TO

Submittals are returned with action indicated. Approval of an item does not include approval of any deviation from the contract
requirements unless the contractor calls attention to and supports the deviation.
Submittals are forwarded to LANTDIV with A & E recommendations indicated in REVIEWER USE ONLY Section and in
comments below on ONE COPY of the transmittal form.
REVIEWER'S COMMENTS

COPIES TO: DATE SIGNATURE

Register

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATIONCONTRACTOR
ACTIVITY NOTRANSMITTAL NOCLASSIFICATION GOVT OR A/E REVWRCONTRACTOR : SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
SPEC SECTREVISION DATEDESCRIPTION ITEM SUBMITTEDPARAGRAPH #SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH/ DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTHER REVIEWERACTION CODEDATE OF ACTIONMAILED TO CONTR/ DATE RCD FRM APPR AUTHREMARKS
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
TB Test reports
OSHA 30 & OSHA 10
Suptintendent Appointment Letter
List of Subcontractors
Schedule of Values
Construction Schedule
Construction Schedule
01000001-21Security Plan1.5.A
01000001-21Phasing/Work Plan/Scheduling Plan1.6.I
01000001-21Utility Services Plan1.6.M.1
01000001-21PreWork Survey1.7.A
01000001-21ReSurvey (30 days prior to turn over)1.7.C
01000001-21As-Built Drawings1.14
01000001-21Warranty Management Plan1.15
01000001-21Tests1.24
01000001-21Maintenance/Operating Manuals1.25
013216.1503-20Critical Path Method Plan1.1.A
013216.1503-20Contractor's Consultant1.3
013216.1503-20Computer produced schedule1.4.A
013216.1503-20Interim Project Schedule1.5.A
013216.1503-20Responsibility Code1.6.C
013216.1503-20Project Schedule Supporting Data1.7.B
013216.1503-20Compact Disk Requirements and CPM Activity/Event Record1.7.D
013216.1503-20Application and Certificate for Payment1.8.A
013216.1503-20Monthly Schedule Update Meetings1.9.A
013216.1503-20Updated Schedule1.9.B
013216.1503-20Monthly Schedule Update1.9.C
013216.1503-20Proposed Schedule Changes1.10.B
013216.1503-20Updated Project Schedule1.11.A
013216.1503-20CPM Revisions1.11.B
013216.1503-20Request for change to contract completion date1.12.C
01332306-21Submittal Register1.3.E
01332306-21Transmittal Form1.5.E
01352611-21Interpretations of Standards1.3.A
01352611-21APP (Accident Prevention Plan)1.4
01352611-21Lift Plan1.4.B.4
01352611-21AHAS (Activity Hazard Analysis)1.5
01352611-21Training Records1.8.E
01352611-21Contractor's Safety Briefing1.8.F
01352611-21Weekly Safety Inspections1.9.A
01352611-21Monthly Safety Inspection1.9.B
01352611-21Accident Notification1.10
01352611-21COVID Protocol1.12
01352611-21Infection Control AHA1.13.B
01352611-21Dust control program1.13.F
01352611-21Tuberculosis Screening1.14.A
01352611-21Influenza Vaccination1.15.A
01352611-21Fire Safety Plan1.16.A
01352611-21Egress Route Inspections1.16.G
01352611-21Request for Fire Protection Interruption1.16.L
01352611-21Hot Work Permits1.16.N
01352611-21Lift permit1.21.C
01450002-21CQC Plan3.2
01450002-21Tests3.7
01741901-21Demo Debris Management Plan1.5.B
01741901-21Monthly Waste Reports (with invoice)1.5.D
01741901-21Final Report1.5.F
01741901-21Materials List - salvaged, recycled, reused vs. taken to landfill2.1.A
01741901-21Materials Tracking Data2.1.B
1910004-22Schedule for operation and maintenance1.10.C.7
1910004-22Submittal Plan1.12.1
1910004-22Preliminary Comissioning Plan1.13.A
1910004-22Final Comissioning Plan1.13.B
1910004-22Systems Functional Performance Test Procedure1.13.C
1910004-22Pre-Functional Checklists1.13.D
1910004-22Test and Inspection Reports1.13.E
1910004-22Corrective Action Document1.13.F
1910004-22Preliminary Commissioning Report1.13.G
1910004-22Final Commissiong Report1.13.H
1910004-22Data for Commissioning1.13.I
1910004-22Coordination1.16
1910004-22Startup Plan3.2.A.2.c
1910004-22Deficiencies, Noncomformance and Approval3.3
1910004-22Development of Systems Functional Performance3.6.C
1910004-22Commissioning Field Report3.7.B.4.a
1910004-22Failure Due to Manufacturer Defect3.7.D
1910004-22Training Module Submittals3.9.C
1910004-22Instruction Program3.9.E.3, 3.9.F
03300012-15Shop Drawings1.6.B
03300012-15Mill Test Reports1.6.C
03300012-15Manufacturer's Certificate1.6.D
03300012-15Testing Agency for Concrete Mix Design1.6.E
03300012-15Test Report for Concrete Mix Designgs1.6.F
03300012-15Shoring & Reshoring Sequence1.6.G
03300012-15Test Reports on Splitting Tensil Strength1.6.H
04051310-17Manfacturer's Literature & Data1.4.B
04051310-17Test Reports1.4.C
04051310-17Certificates1.4.D
04051310-17Qualifications1.4.E
04051310-17Preconstruction Tests1.5.A
04051601-21Manfacturer's Literature & Data1.4.B
04051601-21Sustainable Construction Submittals1.4.C
04051601-21Test Report1.4.D
04051601-21Certificates1.4.E
04051601-21Quality Assurance1.5.A
04200008-17Submittal Drawings1.4.B
04200008-17Manfacturer's Literature & Data1.4.C
04200008-17Samples1.4.D
04200008-17Sustainable Construction Submittals1.4.E
04200008-17Test Report1.4.F
04200008-17Certificates1.4.G
04200008-17Delegated Design Drawings & Calculations1.4.H
05120011-18Submittal Drawings1.4.B
05120011-18Test Reports1.4.C
05120011-18Certificates1.4.D
05120011-18Qualifications1.4.E
05120011-18Delegated Design Drawings & Calculations1.4.F
05120011-18Record Surveys1.4.G
15210011-18Shop & Erection Drawings1.5.B
15210011-18Certificates1.5.C
15210011-18Design Calculations1.5.D
15210011-18Quality Assurance1.6
06100010-17Shop Drawings1.3.B
06100010-17Manfacturer's Literature & Data1.3.C
06100010-17Manfacturer's Certificate for Unmarked Lumber1.3.D
07080001-21Shop Drawings, Product Data, Samples1.6
07080001-21Pre-functional Checklist3.2.A
07080001-21Training Agenda3.5
07211301-21Submittal Drawings1.4.B
07211301-21Manfacturer's Literature & Data1.4.C
07220001-21Submittal Drawings1.4.B
07220001-21Manfacturer's Literature & Data1.4.C
07220001-21Samples1.4.D
07220001-21Qualifications1.4.E
07220001-21Quality Assurance1.5
07240001-21Submittal Drawings1.5.B
07240001-21Manfacturer's Literature & Data1.5.C
07240001-21Samples1.5.D
07240001-21Test Reports1.5.E
07240001-21Quality Assurance1.6
07542301-21Submittal Drawings1.5.B
07542301-21Manfacturer's Literature & Data1.5.C
07542301-21Samples1.5.D
07542301-21Certificates1.5.E
07542301-21Qualifications1.5.F
07542301-21Field Quality Control Reports1.5.G
07542301-21Temporary Protection Plan1.5.H
07542301-21Operation & Maintenance Data1.5.I
07542301-21Quality Assurance1.6
07600001-21Shop Drawings1.5.B
07600001-21Manfacturer's Literature & Data1.5.C
07600001-21Certificates1.5.D
07710001-21Samples1.5.B
07710001-21Shop Drawings1.5.C
07710001-21Manfacturer's Literature & Data1.5.D
07710001-21Certificates1.5.E
07810010-17Installer Qualifications1.3.C
07810010-17Testing Laboratory Accreditations1.3.D
07810010-17Manufacturer's Literature & Data1.3.E
07810010-17Certificates - Testing Laboratory & Manufacturer1.3.F
07810010-17Miscellaneous - Manufacturer1.3.G
07840001-21Installer Qualifications1.3.B
07840001-21Inspector Qualifications1.3.C
07840001-21Manfacturer's Literature & Data1.3.D
07840001-21List of FM, UL or WH Classification of Number of Systems Installed1.3.E
07840001-21Certified Laboratory Test Reports1.3.F
07840001-21Manufacturer Certificates1.3.G
07840001-21Installer Qualifications1.5.B
07840001-21Inspector Qualifications1.5.C
07840001-21Product Data & Installation Instructions3.1.A
07920010-17Installer Qualifications1.3.A
07920010-17Lab Tests1.3.D
07920010-17Joint Certification1.4.A
07920010-17Installer Qualification1.5.B
07920010-17Contractor Certification1.5.C
07920010-17Manufacturer's installation instructions1.5.D
07920010-17Cured samples1.5.E
07920010-17Manufacturer's Literature and Data1.5.F
07920010-17Manufacturer warranty1.5.H
08111301-21Submittal Drawings1.4.B
08111301-21Manufacturer's Literature/Data1.4.C
08111301-21Test reports1.4.D
08111301-21Qualifications1.4.E
083513.1301-21Shop Drawings1.5.B
083513.1301-21Samples1.5.C
083513.1301-21Manufacturer's Literature and Data1.5.D
083513.1301-21Manufacturer’s qualifications1.5.E
08710001-21installation instructions1.5.A
08710001-21Schedules1.6.A
08710001-21hardware schedule1.6.B
08710001-21Samples and Manufacturers' Literature1.6.C
08710001-21Certificate of Compliance and Test Reports1.6.D
09221606-18Manufacturer's Literature and Data1.4.B
09221606-18Shop Drawings1.4.C
09221606-18Test Results1.4.D
09290004-20Manufacturer's Literature and Data1.4.B
09290004-20Shop Drawings1.4.C
09290004-20Samples1.4.D
09510012-18Submittal Drawings1.4.B
09510012-18Manufacturer's Literature and Data1.4.C
09510012-18Samples1.4.D
09510012-18Certificates1.4.E
09510012-18Qualifications1.4.F
09510012-18Operation and Maintenance Data1.4.G
09651301-21Manufacturer's Literature and Data1.4.B
09651301-21Samples1.4.C
09651301-21Operation and Maintenance Data1.4.D
09651605-18Manufacturer's Literature and Data1.4.B
09651605-18Samples1.4.C
09651605-18Certificates1.4.D
09651605-18Qualifications1.4.E
09910001-21Painter qualifications1.3.B
09910001-21Manufacturer's Literature and Data1.3.C
09910001-21Sample Panels1.3.D
09910001-21Sample of identity markers if used1.3.E
09910001-21Manufacturers' Certificates indicating compliance with specified requirements1.3.F
09910001-21Qualification of Painters1.5.A
09910001-21manufacturer’s technical data sheets2.1.A
10111301-21Shop Drawings1.4.B
10111301-21Manufacturer's Literature and Data1.4.C
10111301-21Samples1.4.D
10111301-21Manufacturer’s qualifications1.4.E
102226.1301-21Shop Drawings1.5.B
102226.1301-21Samples1.5.C
102226.1301-21Manufacturers' Literature and Data1.5.D
102226.1301-21Test Reports1.5.E
102226.1301-21Manufacturer's Certificates1.5.F
102226.1301-21Manufacturer’s qualifications1.5.G
102226.1301-21Installer’s qualifications1.5.H
102226.1301-21Manufacturer’s warranty1.5.I
13054101-21Experience quailifications1.3.A.1
13054101-21Design tables1.3.A.2
13054101-21bracing dwgs - achorage1.4.A
13054101-21piping dwgs1.4.B
13054101-21suspended ductwork, electrical & cable1.4.C
21080011-16List of Submittals1.6
21080011-16Pre-functional Checklists3.2
21080011-16Training agenda3.5
21131306-15Qualifications1.4.A.1
21131306-15Drawings1.4.A.2
21131306-15Manufacturer’s Data Sheets1.4.A.3
21131306-15Calculation Sheets1.4.A.4
21131306-15Valve Charts1.4.A.5
21131306-15Final Document Submittals - as-built drawings1.4.A.6.a
21131306-15Final Document Submittals - Material and Testing Certificate1.4.A.6.b
21131306-15Final Document Submittals - Operations and Maintenance Manuals1.4.A.6.c
21131306-15Final Document Submittals - One paper copy of the Material and Testing Certificates and the Operations and Maintenance1.4.A.6.d
21131306-15Final Document Submittals - one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover1.4.A.6.e
23051102-20Contractor - Manufacturer certifications1.4.E
23051102-20Coordination/Shop Drawings1.4.G
23051102-20Manufacturer's Literature and Data1.4.H
23051102-20Rigging Plan1.4.I
23051102-20HVAC Maintenance Data and Operating Instructions1.4.J
23051102-20approved HVAC equipment submittals1.4.K
23051102-20Completed System Readiness Checklist1.4.L
23051102-20training plans and instructor qualifications1.4.M
23051102-20HVAC Equipment Service Providers - contact information1.5.E
23051102-20HVAC Mechanical Systems Welding - certificate1.5.F
23051102-20Manufacturer's Recommendations1.5.G
23051102-20Execution (Installation, Construction) Quality - manufacturer’s installation instructions1.5.H.1
23051102-20Complete coordination/shop drawings1.5.H.3
23051102-20AS-BUILT DOCUMENTATION - manufacturer’s literature and data1.7.A
23051102-20AS-BUILT DOCUMENTATION - operation and maintenance data1.7.B
23051102-20AS-BUILT DOCUMENTATION - Certification documentation1.7.E
23051102-20coordination/shop drawings3.2.A
23051102-20test reports and records3.12.A
23051102-20training plans and instructor qualifications3.14.B
23051202-20Submit motor submittals with driven equipment1.4.C
23051202-20Shop Drawings1.4.D
23051202-20Manufacturer's Literature and Data including1.4.E
23051202-20Complete operating and maintenance manuals1.4.F
23051202-20Certification1.4.G
23051202-20AS-BUILT DOCUMENTATION - manufacturer’s literature and data1.5.A
23051202-20AS-BUILT DOCUMENTATION - operation and maintenance data1..5.B
23051202-20AS-BUILT DOCUMENTATION - Certification documentation1.5.E
23054102-20Manufacturer's Literature and Data1.4.B
23054102-20load calculations for selection of isolators for selection of isolators1.4.C
23059302-20names and qualifications of TAB agency and TAB specialists1.4.B
23059302-20one complete set of applicable AABC, NEBB or TABB publications1.4.C
23059302-20Design Review Report1.4.D.1
23059302-20Systems inspection report1.4.D.2
23059302-20Duct Air Leakage Test Report1.4.D.3
23059302-20Systems Readiness Report1.4.D.4
23059302-20Intermediate and Final TAB reports1.4.D.5
23059302-20uncorrected installation deficiencies1.4.D.6
23059302-20critical path for each balanced branch1.4.D.7
23059302-20Test and Balance report1.4.E
23059302-20SYSTEM READINESS REPORTS3.5
23059302-20TAB REPORTS3.6
23059302-20VIBRATION TESTING3.8.B

230711 02-20 Shop drawings, product data and samples 1.4.A

23071102-20Shop Drawings1.4.B
23071102-20Samples1.4.C
23080804-22List of Submittals1.6
23080804-22Pre-functional Checklists3.2
23080804-22Training Agenda3.5
23092308-20resumes1.4.A.5
23092308-20Manufacturer’s literature and data1.7.B
23092308-20Product Certificates1.7.C
23092308-20Licenses1.7.D
23092308-20As Built Control Drawings1.7.E
23092308-20Operation and Maintenance (O/M) Manuals)1.7.F
23092308-20Performance Report1.7.G
23092308-20BACnet Building Controllers - Device PICS2.6.A.1
23092308-20BACnet Advanced Application Controllers - Device’s PICS2.6.A.2
23092308-20BACnet Application Specific Controllers - Device’s PICS2.6.A.3
23092308-20BACnet Smart Actuators - Device PICS2.6.A.4
23092308-20BACnet Smart Sensors - Device PICS2.6.A.5
23092308-20BACnet routers and gateways - Device PICS2.6.A.6
23092308-20validation test plan including test procedures for the performance verification tests3.2.B.1
23092308-20Installer - Test Check List3.2.B.2
23092308-20training plans and instructor qualifications3.5.B
23211302-20Manufacturer's Literature and Data including1.4.C
23211302-20welder’s qualifications1.4.D
23211302-20Coordination Drawings1.4.E
23211302-20As-Built Piping Diagrams1.4.F
23211302-20Complete operating and maintenance manuals1.4.G
23211302-20Completed System Readiness Checklist1.4.H
23211302-20training plans and instructor qualifications1.4.I
23211302-20welder’s certification1.5.B
23211302-20AS-BUILT DOCUMENTATION - manufacturer’s literature and data1.6.A
23211302-20AS-BUILT DOCUMENTATION - operation and maintenance data1.6.B
23211302-20AS-BUILT DOCUMENTATION - Certification documentation1.6.E
23310002-20Manufacturer's Literature and Data1.4.B
23310002-20Coordination Drawings1.4.C
23310002-20manufacturer's installation instructions2.4.C.2
23360002-20Manufacturer's Literature and Data1.4.B
23360002-20Samples1.4.C
23360002-20Certificates1.4.D
23360002-20Operation and Maintenance Manuals1.4.E
23370002-20Manufacturer's Literature and Data1.4.B
23370002-20Coordination Drawings1.4.C
23741303-20Manufacturer's Literature and Data1.4.B
23741303-20Maintenance and operating manuals1.4.C
23741303-20written test procedures1.4.D
23741303-20Completed System Readiness Checklists1.4.E
23741303-20shipping information1.4.F
23821603-20Manufacturer's Literature and Data for Heating and Cooling Coils1.4.B
23821603-20installation, operating and maintenance instructions1.4.C
23821603-20Certification Compliance1.4.D
23821603-20Coils may be submitted with Section 23 36 00 and Section 23 74 131.4.E
26051101-16Service Qualifications - contact list(s)1.4.C
26051101-16job specific work plan19.C.3
26051101-16Government's approval shall be obtained for all materials and equipment before delivery to the job site1.12.B
26051101-16adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary1.12.C
26051101-16individual systems and equipment assemblies which consist of more than one item or component1.12.D
26051101-16Information that confirms compliance with contract requirements1.12.E.1
26051101-16Elementary and interconnection wiring diagrams for communication and signal systems, control systems, and equipment assemblies1.12.E.3
26051101-16Parts list1.12.E.4
26051101-16Maintenance and Operation Manuals1.12.F
26051101-16Samples - minimum 300 mm (12 inches) length of each type and size of wire

and cable along with the tag from the coils or reels from which the

sample was taken1.12.H.1
26051101-16Samples - Each type of conduit coupling, bushing, and termination fitting1.12.H.2
26051101-16Samples - Conduit hangers, clamps, and supports1.12.H.3
26051101-16Samples - Duct sealing compound1.12.H.4
26051101-16Samples - Each type of receptacle, toggle switch, lighting control sensor, outlet box, manual motor starter, device wall plate, engraved nameplate, wire and cable splicing and terminating material, and branch circuit single pole molded case circuit breaker.1.12.H.5
26051101-16Contractor - training schedule1.16.C
26051901-17Shop Drawings1.4.1
26051901-17Certifications1.4.2
26052601-17Shop Drawings1.4.A.1
26052601-17Test Reports1.4.A.2
26052601-17Certifications1.4.A.3
26053301-18Shop Drawings1.4.A.1
26053301-18Certifications1.4.A.2
26053301-18Layout and Homeruns - proposed deviations3.2.E.2
26053301-18CONCEALED WORK INSTALLATION - drawing showing location, size, and position of each
penetration3.3.A.3.b
26057301-18Product data on the software program to be used for the study1.4.A.1
26057301-18Complete study as described in paragraph 1.61.4.A.2
26057301-18Certifications1.4.A.3
26080011-16List of Submittals1.6
26080011-16Pre-Functional Checklists3.2
26080011-16Training3.5
26092301-18Shop Drawings1.4.A.1
26092301-18Manuals1.4.A.2
26092301-18Certifications1.4.A.3
26092301-18contractor - written instructions on training and maintenance as reviewed in training session3.4.B
26272601-18Shop Drawings1.4.A.1
26272601-18Manuals1.4.A.2
26272601-18Certifications1.4.A.3
26510001-18Shop Drawings1.4.A.1
26510001-18Manuals1.4.A.2
26510001-18Certifications1.4.A.3
27051109-19RELATED WORK - Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.1.5.A.2
27051109-19Provide parts list including quantity of spare parts1.7.B
27051109-19Provide manufacturer product information1.7.C
27051109-19Provide Source Quality Control Submittal1.7.D
27051109-19Installer Qualifications1.7.E
27051109-19Provide delegated design submittals (e.g. seismic support design)1.7.F
27051109-19all equipment anchors and supports1.7.G
27051109-19Test Equipment List1.7.H
27051109-19Submittal Drawings - Telecommunications Space Plans/Elevations1.7.I.1
27051109-19Submittal Drawings - Logical Drawings1.7.I.2
27051109-19Submittal Drawings - Access Panel Schedule1.7.I.3
27051109-19Provide sustainable design submittals1.7.J
27051109-19Furnish electronic certified test reports1.7.K
27051109-19closeout submittals1.8.A
27051109-19Maintenance and Operation Manuals1.8.B
27051109-19Record Wiring Diagrams1.8.C
27051109-19Service Qualifications1.8.D
27051109-19MAINTENANCE MATERIAL1.9.A
27051109-19Product and System Qualification1.9.B
27051109-19Trade Contractor Qualifications1.9.C
27051109-19System Supplier Qualifications1.9.D
27051109-19written evidence of current OEM certifications for installers1.9.E
27051109-19Manufacturer’s Qualifications1.10.A
27051109-19Product and System Qualification1.10.B
27051109-19Trade Contractor Qualifications1.10.C
27051109-19System Supplier Qualifications1.10.D
27051109-19Telecommunications technicians1.10.E
27051109-19Manufactured Products1.10.F
27051109-19Testing Agencies1.10.G
27051109-19Delivery and Acceptance Requirements1.11.A
27051109-19written notice3.6.D
27051109-19Acceptance Test3.6.I
27051109-19training schedule3.8.C
27053310-18REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS1.3.A
27053310-18Layout and Homeruns - Deviations3.1.C.22
27053310-18drawing showing location, size, and position of each penetration3.1.D.2
27080011-16List of Submittals1.3
27080011-16Closeout Submittals1.4
27150001-16REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS1.3.A
27150001-16Certifications1.3.B
27150001-16Closeout Submittal1.3.C
27150001-16Active and passive equipment2.1.B.5
27150001-16pretest results and certification3.2.C.1
27511601-18Contractor - written statement attesting this requirement1.1.F
27511601-18QUALIFICATIONS - names, locations and point of contact for these installations1.5.A
27511601-18QUALIFICATIONS - certified documentation that they have been an authorized distributor and service organization for the OEM for a minimum of three (3) years1.5.B
27511601-18QUALIFICATIONS - formal written evidence of current OEM certification(s) for the installer(s)1.5.C
27511601-18QUALIFICATIONS - Certificate of successful completion of OEM’s installation/training school1.5.E
27511601-18drawings and product data on all proposed equipment and system1.8.A
27511601-18Support all submittals with descriptive materials1.8.B
27511601-18complete and through equipment list of equipment expected to be installed in the system, with spares, as a part of the submittal1.8.C
27511601-18Provide four (4) copies to the PM for technical review1.8.D
27511601-18Contractor - System survey(s)1.8.I
27511601-18PROJECT CLOSE-OUT - Contractor submissions1.13.A
27511601-18PROJECT CLOSE-OUT - Contractor written notice1.13.B
27511601-18MANUFACTURERS - published and distributed descriptive literature and equipment specifications on the items of equipment2.3.A.3
27511601-18Contractor - four (4) copies of the recorded system pretest measurements and the written certification that the System is ready for the formal acceptance test4.1.B.3
27511601-18Acceptance Test - acceptance test date giving RE 30 days notice4.1.C.1
27511601-18Contractor - test equipment list4.1.E
28050004-18Contractor submissions1.1.C
28050004-18Security Contractor - necessary maintenance and troubleshooting manuals1.1.D
28050004-18Contractor - copies of system manufacturer certification for all technicians1.4.C.1
28050004-18Contractor - provide proof project superintendent with BICSI Certified Commercial Installer Level 1, Level 2, or Technician to provide oversight of the project1.4.C.2
28050004-18Service Qualifications1.4.D
28050004-18Government's approval shall be obtained for all equipment and material before delivery to the job site1.6.B
28050004-18Submittals for individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assembly as a whole1.6.C
28050004-18Submittal inclusions1.6.D
28050004-18Submittal compliance1.6.E
28050004-18Maintenance and Operation Manuals1.6.E.6.f.1
28050004-18Contractor - Product Data1.6.E.9
28051310-18Manufacturer's Literature and Data1.5.A.1
28051310-18Certificates1.5.A.2
28051310-18Shop Drawings1.5.A.3
28051310-18Wiring Diagrams1.5.A.4
28051310-18Cable Administration Drawings1.5.A.5
28051310-18Project planning documents as specified in Part 31.5.A.6
28051310-18Maintenance Data1.5.A.7
28080011-16List of Submittlas1.6
28080011-16Pre-functional Checklists3.2
28080011-16Training3.5