TRANS #1
CONTRACTOR'S SUBMITTAL TRANSMITTAL CONTRACT NO. TRANSMITTAL NO. DATE
FROM CONTRACTOR PROJECT TITLE & LOCATION
TO
| CONTRACTOR USE ONLY | | | | REVIEWER USE ONLY | |
| List only one specification division per form. | | | | ** ACTION CODES | |
| | | | A - Approved | |
| List only one of the following categories on each transmittal form, | | | | D - Disapproved | |
| and indicate which is being submitted | | | | AN - Approved as noted | |
| Contractor Approval | | OICC Approval Deviation / Sub | | RA - Receipt acknowledged | |
| | For OICC Approval | | C - Comments | |
| | | | R - Resubmit | |
| ITEM NO. | PROJ. SPEC. SECT. | ITEM IDENTIFICATION | NO. OF COPIES | ACTION CODES | REVIEWER'S |
| & PARA. AND/OR | (TYPE, SIZE, MODEL NO., MFG. NAME, DWG. OR | | ** | INITIALS |
| PROJ. DWG. NO. | BROCHURE NUMBER) | | | CODE & DATE |
CONTRACTOR'S COMMENTS :
COPY OF TRANSMITTAL AND SUBMITTALS TO ROICC CONTRACTOR REPRESENTATIVE (Signature)
DATE RECEIVED BY REVIEWER FROM (REVIEWER) TO
| Submittals are returned with action indicated. Approval of an item does not include approval of any deviation from the contract |
| requirements unless the contractor calls attention to and supports the deviation. |
| Submittals are forwarded to LANTDIV with A & E recommendations indicated in REVIEWER USE ONLY Section and in |
| comments below on ONE COPY of the transmittal form. |
| REVIEWER'S COMMENTS | |
COPIES TO: DATE SIGNATURE
Register
| SUBMITTAL REGISTER | | CONTRACT NO. |
| TITLE AND LOCATION | CONTRACTOR | |
| ACTIVITY NO | TRANSMITTAL NO | | | | | CLASSIFICATION GOVT OR A/E REVWR | CONTRACTOR : SCHEDULE DATES | | | CONTRACTOR ACTION | | | APPROVING AUTHORITY | | | | | |
| | SPEC SECT | REVISION DATE | DESCRIPTION ITEM SUBMITTED | PARAGRAPH # | | SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | ACTION CODE | DATE OF ACTION | MAILED TO CONTR/ DATE RCD FRM APPR AUTH | REMARKS |
| (a) | (b) | (c) | | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| | | | TB Test reports | | | | | | | | | | | | | | |
| | | | OSHA 30 & OSHA 10 | | | | | | | | | | | | | | |
| | | | Suptintendent Appointment Letter | | | | | | | | | | | | | | |
| | | | List of Subcontractors | | | | | | | | | | | | | | |
| | | | Schedule of Values | | | | | | | | | | | | | | |
| | | | Construction Schedule | | | | | | | | | | | | | | |
| | | | Construction Schedule | | | | | | | | | | | | | | |
| | 010000 | 01-21 | Security Plan | 1.5.A | | | | | | | | | | | | | |
| | 010000 | 01-21 | Phasing/Work Plan/Scheduling Plan | 1.6.I | | | | | | | | | | | | | |
| | 010000 | 01-21 | Utility Services Plan | 1.6.M.1 | | | | | | | | | | | | | |
| | 010000 | 01-21 | PreWork Survey | 1.7.A | | | | | | | | | | | | | |
| | 010000 | 01-21 | ReSurvey (30 days prior to turn over) | 1.7.C | | | | | | | | | | | | | |
| | 010000 | 01-21 | As-Built Drawings | 1.14 | | | | | | | | | | | | | |
| | 010000 | 01-21 | Warranty Management Plan | 1.15 | | | | | | | | | | | | | |
| | 010000 | 01-21 | Tests | 1.24 | | | | | | | | | | | | | |
| | 010000 | 01-21 | Maintenance/Operating Manuals | 1.25 | | | | | | | | | | | | | |
| 013216.15 | 03-20 | Critical Path Method Plan | 1.1.A |
| 013216.15 | 03-20 | Contractor's Consultant | 1.3 |
| 013216.15 | 03-20 | Computer produced schedule | 1.4.A |
| 013216.15 | 03-20 | Interim Project Schedule | 1.5.A |
| 013216.15 | 03-20 | Responsibility Code | 1.6.C |
| 013216.15 | 03-20 | Project Schedule Supporting Data | 1.7.B |
| 013216.15 | 03-20 | Compact Disk Requirements and CPM Activity/Event Record | 1.7.D |
| 013216.15 | 03-20 | Application and Certificate for Payment | 1.8.A |
| 013216.15 | 03-20 | Monthly Schedule Update Meetings | 1.9.A |
| 013216.15 | 03-20 | Updated Schedule | 1.9.B |
| 013216.15 | 03-20 | Monthly Schedule Update | 1.9.C |
| 013216.15 | 03-20 | Proposed Schedule Changes | 1.10.B |
| 013216.15 | 03-20 | Updated Project Schedule | 1.11.A |
| 013216.15 | 03-20 | CPM Revisions | 1.11.B |
| 013216.15 | 03-20 | Request for change to contract completion date | 1.12.C |
| 013323 | 06-21 | Submittal Register | 1.3.E |
| 013323 | 06-21 | Transmittal Form | 1.5.E |
| 013526 | 11-21 | Interpretations of Standards | 1.3.A |
| 013526 | 11-21 | APP (Accident Prevention Plan) | 1.4 |
| 013526 | 11-21 | Lift Plan | 1.4.B.4 |
| 013526 | 11-21 | AHAS (Activity Hazard Analysis) | 1.5 |
| 013526 | 11-21 | Training Records | 1.8.E |
| 013526 | 11-21 | Contractor's Safety Briefing | 1.8.F |
| 013526 | 11-21 | Weekly Safety Inspections | 1.9.A |
| 013526 | 11-21 | Monthly Safety Inspection | 1.9.B |
| 013526 | 11-21 | Accident Notification | 1.10 |
| 013526 | 11-21 | COVID Protocol | 1.12 |
| 013526 | 11-21 | Infection Control AHA | 1.13.B |
| 013526 | 11-21 | Dust control program | 1.13.F |
| 013526 | 11-21 | Tuberculosis Screening | 1.14.A |
| 013526 | 11-21 | Influenza Vaccination | 1.15.A |
| 013526 | 11-21 | Fire Safety Plan | 1.16.A |
| 013526 | 11-21 | Egress Route Inspections | 1.16.G |
| 013526 | 11-21 | Request for Fire Protection Interruption | 1.16.L |
| 013526 | 11-21 | Hot Work Permits | 1.16.N |
| 013526 | 11-21 | Lift permit | 1.21.C |
| 014500 | 02-21 | CQC Plan | 3.2 |
| 014500 | 02-21 | Tests | 3.7 |
| 017419 | 01-21 | Demo Debris Management Plan | 1.5.B |
| 017419 | 01-21 | Monthly Waste Reports (with invoice) | 1.5.D |
| 017419 | 01-21 | Final Report | 1.5.F |
| 017419 | 01-21 | Materials List - salvaged, recycled, reused vs. taken to landfill | 2.1.A |
| 017419 | 01-21 | Materials Tracking Data | 2.1.B |
| 19100 | 04-22 | Schedule for operation and maintenance | 1.10.C.7 |
| 19100 | 04-22 | Submittal Plan | 1.12.1 |
| 19100 | 04-22 | Preliminary Comissioning Plan | 1.13.A |
| 19100 | 04-22 | Final Comissioning Plan | 1.13.B |
| 19100 | 04-22 | Systems Functional Performance Test Procedure | 1.13.C |
| 19100 | 04-22 | Pre-Functional Checklists | 1.13.D |
| 19100 | 04-22 | Test and Inspection Reports | 1.13.E |
| 19100 | 04-22 | Corrective Action Document | 1.13.F |
| 19100 | 04-22 | Preliminary Commissioning Report | 1.13.G |
| 19100 | 04-22 | Final Commissiong Report | 1.13.H |
| 19100 | 04-22 | Data for Commissioning | 1.13.I |
| 19100 | 04-22 | Coordination | 1.16 |
| 19100 | 04-22 | Startup Plan | 3.2.A.2.c |
| 19100 | 04-22 | Deficiencies, Noncomformance and Approval | 3.3 |
| 19100 | 04-22 | Development of Systems Functional Performance | 3.6.C |
| 19100 | 04-22 | Commissioning Field Report | 3.7.B.4.a |
| 19100 | 04-22 | Failure Due to Manufacturer Defect | 3.7.D |
| 19100 | 04-22 | Training Module Submittals | 3.9.C |
| 19100 | 04-22 | Instruction Program | 3.9.E.3, 3.9.F |
| 033000 | 12-15 | Shop Drawings | 1.6.B |
| 033000 | 12-15 | Mill Test Reports | 1.6.C |
| 033000 | 12-15 | Manufacturer's Certificate | 1.6.D |
| 033000 | 12-15 | Testing Agency for Concrete Mix Design | 1.6.E |
| 033000 | 12-15 | Test Report for Concrete Mix Designgs | 1.6.F |
| 033000 | 12-15 | Shoring & Reshoring Sequence | 1.6.G |
| 033000 | 12-15 | Test Reports on Splitting Tensil Strength | 1.6.H |
| 040513 | 10-17 | Manfacturer's Literature & Data | 1.4.B |
| 040513 | 10-17 | Test Reports | 1.4.C |
| 040513 | 10-17 | Certificates | 1.4.D |
| 040513 | 10-17 | Qualifications | 1.4.E |
| 040513 | 10-17 | Preconstruction Tests | 1.5.A |
| 040516 | 01-21 | Manfacturer's Literature & Data | 1.4.B |
| 040516 | 01-21 | Sustainable Construction Submittals | 1.4.C |
| 040516 | 01-21 | Test Report | 1.4.D |
| 040516 | 01-21 | Certificates | 1.4.E |
| 040516 | 01-21 | Quality Assurance | 1.5.A |
| 042000 | 08-17 | Submittal Drawings | 1.4.B |
| 042000 | 08-17 | Manfacturer's Literature & Data | 1.4.C |
| 042000 | 08-17 | Samples | 1.4.D |
| 042000 | 08-17 | Sustainable Construction Submittals | 1.4.E |
| 042000 | 08-17 | Test Report | 1.4.F |
| 042000 | 08-17 | Certificates | 1.4.G |
| 042000 | 08-17 | Delegated Design Drawings & Calculations | 1.4.H |
| 051200 | 11-18 | Submittal Drawings | 1.4.B |
| 051200 | 11-18 | Test Reports | 1.4.C |
| 051200 | 11-18 | Certificates | 1.4.D |
| 051200 | 11-18 | Qualifications | 1.4.E |
| 051200 | 11-18 | Delegated Design Drawings & Calculations | 1.4.F |
| 051200 | 11-18 | Record Surveys | 1.4.G |
| 152100 | 11-18 | Shop & Erection Drawings | 1.5.B |
| 152100 | 11-18 | Certificates | 1.5.C |
| 152100 | 11-18 | Design Calculations | 1.5.D |
| 152100 | 11-18 | Quality Assurance | 1.6 |
| 061000 | 10-17 | Shop Drawings | 1.3.B |
| 061000 | 10-17 | Manfacturer's Literature & Data | 1.3.C |
| 061000 | 10-17 | Manfacturer's Certificate for Unmarked Lumber | 1.3.D |
| 070800 | 01-21 | Shop Drawings, Product Data, Samples | 1.6 |
| 070800 | 01-21 | Pre-functional Checklist | 3.2.A |
| 070800 | 01-21 | Training Agenda | 3.5 |
| 072113 | 01-21 | Submittal Drawings | 1.4.B |
| 072113 | 01-21 | Manfacturer's Literature & Data | 1.4.C |
| 072200 | 01-21 | Submittal Drawings | 1.4.B |
| 072200 | 01-21 | Manfacturer's Literature & Data | 1.4.C |
| 072200 | 01-21 | Samples | 1.4.D |
| 072200 | 01-21 | Qualifications | 1.4.E |
| 072200 | 01-21 | Quality Assurance | 1.5 |
| 072400 | 01-21 | Submittal Drawings | 1.5.B |
| 072400 | 01-21 | Manfacturer's Literature & Data | 1.5.C |
| 072400 | 01-21 | Samples | 1.5.D |
| 072400 | 01-21 | Test Reports | 1.5.E |
| 072400 | 01-21 | Quality Assurance | 1.6 |
| 075423 | 01-21 | Submittal Drawings | 1.5.B |
| 075423 | 01-21 | Manfacturer's Literature & Data | 1.5.C |
| 075423 | 01-21 | Samples | 1.5.D |
| 075423 | 01-21 | Certificates | 1.5.E |
| 075423 | 01-21 | Qualifications | 1.5.F |
| 075423 | 01-21 | Field Quality Control Reports | 1.5.G |
| 075423 | 01-21 | Temporary Protection Plan | 1.5.H |
| 075423 | 01-21 | Operation & Maintenance Data | 1.5.I |
| 075423 | 01-21 | Quality Assurance | 1.6 |
| 076000 | 01-21 | Shop Drawings | 1.5.B |
| 076000 | 01-21 | Manfacturer's Literature & Data | 1.5.C |
| 076000 | 01-21 | Certificates | 1.5.D |
| 077100 | 01-21 | Samples | 1.5.B |
| 077100 | 01-21 | Shop Drawings | 1.5.C |
| 077100 | 01-21 | Manfacturer's Literature & Data | 1.5.D |
| 077100 | 01-21 | Certificates | 1.5.E |
| 078100 | 10-17 | Installer Qualifications | 1.3.C |
| 078100 | 10-17 | Testing Laboratory Accreditations | 1.3.D |
| 078100 | 10-17 | Manufacturer's Literature & Data | 1.3.E |
| 078100 | 10-17 | Certificates - Testing Laboratory & Manufacturer | 1.3.F |
| 078100 | 10-17 | Miscellaneous - Manufacturer | 1.3.G |
| 078400 | 01-21 | Installer Qualifications | 1.3.B |
| 078400 | 01-21 | Inspector Qualifications | 1.3.C |
| 078400 | 01-21 | Manfacturer's Literature & Data | 1.3.D |
| 078400 | 01-21 | List of FM, UL or WH Classification of Number of Systems Installed | 1.3.E |
| 078400 | 01-21 | Certified Laboratory Test Reports | 1.3.F |
| 078400 | 01-21 | Manufacturer Certificates | 1.3.G |
| 078400 | 01-21 | Installer Qualifications | 1.5.B |
| 078400 | 01-21 | Inspector Qualifications | 1.5.C |
| 078400 | 01-21 | Product Data & Installation Instructions | 3.1.A |
| 079200 | 10-17 | Installer Qualifications | 1.3.A |
| 079200 | 10-17 | Lab Tests | 1.3.D |
| 079200 | 10-17 | Joint Certification | 1.4.A |
| 079200 | 10-17 | Installer Qualification | 1.5.B |
| 079200 | 10-17 | Contractor Certification | 1.5.C |
| 079200 | 10-17 | Manufacturer's installation instructions | 1.5.D |
| 079200 | 10-17 | Cured samples | 1.5.E |
| 079200 | 10-17 | Manufacturer's Literature and Data | 1.5.F |
| 079200 | 10-17 | Manufacturer warranty | 1.5.H |
| 081113 | 01-21 | Submittal Drawings | 1.4.B |
| 081113 | 01-21 | Manufacturer's Literature/Data | 1.4.C |
| 081113 | 01-21 | Test reports | 1.4.D |
| 081113 | 01-21 | Qualifications | 1.4.E |
| 083513.13 | 01-21 | Shop Drawings | 1.5.B |
| 083513.13 | 01-21 | Samples | 1.5.C |
| 083513.13 | 01-21 | Manufacturer's Literature and Data | 1.5.D |
| 083513.13 | 01-21 | Manufacturer’s qualifications | 1.5.E |
| 087100 | 01-21 | installation instructions | 1.5.A |
| 087100 | 01-21 | Schedules | 1.6.A |
| 087100 | 01-21 | hardware schedule | 1.6.B |
| 087100 | 01-21 | Samples and Manufacturers' Literature | 1.6.C |
| 087100 | 01-21 | Certificate of Compliance and Test Reports | 1.6.D |
| 092216 | 06-18 | Manufacturer's Literature and Data | 1.4.B |
| 092216 | 06-18 | Shop Drawings | 1.4.C |
| 092216 | 06-18 | Test Results | 1.4.D |
| 092900 | 04-20 | Manufacturer's Literature and Data | 1.4.B |
| 092900 | 04-20 | Shop Drawings | 1.4.C |
| 092900 | 04-20 | Samples | 1.4.D |
| 095100 | 12-18 | Submittal Drawings | 1.4.B |
| 095100 | 12-18 | Manufacturer's Literature and Data | 1.4.C |
| 095100 | 12-18 | Samples | 1.4.D |
| 095100 | 12-18 | Certificates | 1.4.E |
| 095100 | 12-18 | Qualifications | 1.4.F |
| 095100 | 12-18 | Operation and Maintenance Data | 1.4.G |
| 096513 | 01-21 | Manufacturer's Literature and Data | 1.4.B |
| 096513 | 01-21 | Samples | 1.4.C |
| 096513 | 01-21 | Operation and Maintenance Data | 1.4.D |
| 096516 | 05-18 | Manufacturer's Literature and Data | 1.4.B |
| 096516 | 05-18 | Samples | 1.4.C |
| 096516 | 05-18 | Certificates | 1.4.D |
| 096516 | 05-18 | Qualifications | 1.4.E |
| 099100 | 01-21 | Painter qualifications | 1.3.B |
| 099100 | 01-21 | Manufacturer's Literature and Data | 1.3.C |
| 099100 | 01-21 | Sample Panels | 1.3.D |
| 099100 | 01-21 | Sample of identity markers if used | 1.3.E |
| 099100 | 01-21 | Manufacturers' Certificates indicating compliance with specified requirements | 1.3.F |
| 099100 | 01-21 | Qualification of Painters | 1.5.A |
| 099100 | 01-21 | manufacturer’s technical data sheets | 2.1.A |
| 101113 | 01-21 | Shop Drawings | 1.4.B |
| 101113 | 01-21 | Manufacturer's Literature and Data | 1.4.C |
| 101113 | 01-21 | Samples | 1.4.D |
| 101113 | 01-21 | Manufacturer’s qualifications | 1.4.E |
| 102226.13 | 01-21 | Shop Drawings | 1.5.B |
| 102226.13 | 01-21 | Samples | 1.5.C |
| 102226.13 | 01-21 | Manufacturers' Literature and Data | 1.5.D |
| 102226.13 | 01-21 | Test Reports | 1.5.E |
| 102226.13 | 01-21 | Manufacturer's Certificates | 1.5.F |
| 102226.13 | 01-21 | Manufacturer’s qualifications | 1.5.G |
| 102226.13 | 01-21 | Installer’s qualifications | 1.5.H |
| 102226.13 | 01-21 | Manufacturer’s warranty | 1.5.I |
| 130541 | 01-21 | Experience quailifications | 1.3.A.1 |
| 130541 | 01-21 | Design tables | 1.3.A.2 |
| 130541 | 01-21 | bracing dwgs - achorage | 1.4.A |
| 130541 | 01-21 | piping dwgs | 1.4.B |
| 130541 | 01-21 | suspended ductwork, electrical & cable | 1.4.C |
| 210800 | 11-16 | List of Submittals | 1.6 |
| 210800 | 11-16 | Pre-functional Checklists | 3.2 |
| 210800 | 11-16 | Training agenda | 3.5 |
| 211313 | 06-15 | Qualifications | 1.4.A.1 |
| 211313 | 06-15 | Drawings | 1.4.A.2 |
| 211313 | 06-15 | Manufacturer’s Data Sheets | 1.4.A.3 |
| 211313 | 06-15 | Calculation Sheets | 1.4.A.4 |
| 211313 | 06-15 | Valve Charts | 1.4.A.5 |
| 211313 | 06-15 | Final Document Submittals - as-built drawings | 1.4.A.6.a |
| 211313 | 06-15 | Final Document Submittals - Material and Testing Certificate | 1.4.A.6.b |
| 211313 | 06-15 | Final Document Submittals - Operations and Maintenance Manuals | 1.4.A.6.c |
| 211313 | 06-15 | Final Document Submittals - One paper copy of the Material and Testing Certificates and the Operations and Maintenance | 1.4.A.6.d |
| 211313 | 06-15 | Final Document Submittals - one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover | 1.4.A.6.e |
| 230511 | 02-20 | Contractor - Manufacturer certifications | 1.4.E |
| 230511 | 02-20 | Coordination/Shop Drawings | 1.4.G |
| 230511 | 02-20 | Manufacturer's Literature and Data | 1.4.H |
| 230511 | 02-20 | Rigging Plan | 1.4.I |
| 230511 | 02-20 | HVAC Maintenance Data and Operating Instructions | 1.4.J |
| 230511 | 02-20 | approved HVAC equipment submittals | 1.4.K |
| 230511 | 02-20 | Completed System Readiness Checklist | 1.4.L |
| 230511 | 02-20 | training plans and instructor qualifications | 1.4.M |
| 230511 | 02-20 | HVAC Equipment Service Providers - contact information | 1.5.E |
| 230511 | 02-20 | HVAC Mechanical Systems Welding - certificate | 1.5.F |
| 230511 | 02-20 | Manufacturer's Recommendations | 1.5.G |
| 230511 | 02-20 | Execution (Installation, Construction) Quality - manufacturer’s installation instructions | 1.5.H.1 |
| 230511 | 02-20 | Complete coordination/shop drawings | 1.5.H.3 |
| 230511 | 02-20 | AS-BUILT DOCUMENTATION - manufacturer’s literature and data | 1.7.A |
| 230511 | 02-20 | AS-BUILT DOCUMENTATION - operation and maintenance data | 1.7.B |
| 230511 | 02-20 | AS-BUILT DOCUMENTATION - Certification documentation | 1.7.E |
| 230511 | 02-20 | coordination/shop drawings | 3.2.A |
| 230511 | 02-20 | test reports and records | 3.12.A |
| 230511 | 02-20 | training plans and instructor qualifications | 3.14.B |
| 230512 | 02-20 | Submit motor submittals with driven equipment | 1.4.C |
| 230512 | 02-20 | Shop Drawings | 1.4.D |
| 230512 | 02-20 | Manufacturer's Literature and Data including | 1.4.E |
| 230512 | 02-20 | Complete operating and maintenance manuals | 1.4.F |
| 230512 | 02-20 | Certification | 1.4.G |
| 230512 | 02-20 | AS-BUILT DOCUMENTATION - manufacturer’s literature and data | 1.5.A |
| 230512 | 02-20 | AS-BUILT DOCUMENTATION - operation and maintenance data | 1..5.B |
| 230512 | 02-20 | AS-BUILT DOCUMENTATION - Certification documentation | 1.5.E |
| 230541 | 02-20 | Manufacturer's Literature and Data | 1.4.B |
| 230541 | 02-20 | load calculations for selection of isolators for selection of isolators | 1.4.C |
| 230593 | 02-20 | names and qualifications of TAB agency and TAB specialists | 1.4.B |
| 230593 | 02-20 | one complete set of applicable AABC, NEBB or TABB publications | 1.4.C |
| 230593 | 02-20 | Design Review Report | 1.4.D.1 |
| 230593 | 02-20 | Systems inspection report | 1.4.D.2 |
| 230593 | 02-20 | Duct Air Leakage Test Report | 1.4.D.3 |
| 230593 | 02-20 | Systems Readiness Report | 1.4.D.4 |
| 230593 | 02-20 | Intermediate and Final TAB reports | 1.4.D.5 |
| 230593 | 02-20 | uncorrected installation deficiencies | 1.4.D.6 |
| 230593 | 02-20 | critical path for each balanced branch | 1.4.D.7 |
| 230593 | 02-20 | Test and Balance report | 1.4.E |
| 230593 | 02-20 | SYSTEM READINESS REPORTS | 3.5 |
| 230593 | 02-20 | TAB REPORTS | 3.6 |
| 230593 | 02-20 | VIBRATION TESTING | 3.8.B |
230711 02-20 Shop drawings, product data and samples 1.4.A
| 230711 | 02-20 | Shop Drawings | 1.4.B |
| 230711 | 02-20 | Samples | 1.4.C |
| 230808 | 04-22 | List of Submittals | 1.6 |
| 230808 | 04-22 | Pre-functional Checklists | 3.2 |
| 230808 | 04-22 | Training Agenda | 3.5 |
| 230923 | 08-20 | resumes | 1.4.A.5 |
| 230923 | 08-20 | Manufacturer’s literature and data | 1.7.B |
| 230923 | 08-20 | Product Certificates | 1.7.C |
| 230923 | 08-20 | Licenses | 1.7.D |
| 230923 | 08-20 | As Built Control Drawings | 1.7.E |
| 230923 | 08-20 | Operation and Maintenance (O/M) Manuals) | 1.7.F |
| 230923 | 08-20 | Performance Report | 1.7.G |
| 230923 | 08-20 | BACnet Building Controllers - Device PICS | 2.6.A.1 |
| 230923 | 08-20 | BACnet Advanced Application Controllers - Device’s PICS | 2.6.A.2 |
| 230923 | 08-20 | BACnet Application Specific Controllers - Device’s PICS | 2.6.A.3 |
| 230923 | 08-20 | BACnet Smart Actuators - Device PICS | 2.6.A.4 |
| 230923 | 08-20 | BACnet Smart Sensors - Device PICS | 2.6.A.5 |
| 230923 | 08-20 | BACnet routers and gateways - Device PICS | 2.6.A.6 |
| 230923 | 08-20 | validation test plan including test procedures for the performance verification tests | 3.2.B.1 |
| 230923 | 08-20 | Installer - Test Check List | 3.2.B.2 |
| 230923 | 08-20 | training plans and instructor qualifications | 3.5.B |
| 232113 | 02-20 | Manufacturer's Literature and Data including | 1.4.C |
| 232113 | 02-20 | welder’s qualifications | 1.4.D |
| 232113 | 02-20 | Coordination Drawings | 1.4.E |
| 232113 | 02-20 | As-Built Piping Diagrams | 1.4.F |
| 232113 | 02-20 | Complete operating and maintenance manuals | 1.4.G |
| 232113 | 02-20 | Completed System Readiness Checklist | 1.4.H |
| 232113 | 02-20 | training plans and instructor qualifications | 1.4.I |
| 232113 | 02-20 | welder’s certification | 1.5.B |
| 232113 | 02-20 | AS-BUILT DOCUMENTATION - manufacturer’s literature and data | 1.6.A |
| 232113 | 02-20 | AS-BUILT DOCUMENTATION - operation and maintenance data | 1.6.B |
| 232113 | 02-20 | AS-BUILT DOCUMENTATION - Certification documentation | 1.6.E |
| 233100 | 02-20 | Manufacturer's Literature and Data | 1.4.B |
| 233100 | 02-20 | Coordination Drawings | 1.4.C |
| 233100 | 02-20 | manufacturer's installation instructions | 2.4.C.2 |
| 233600 | 02-20 | Manufacturer's Literature and Data | 1.4.B |
| 233600 | 02-20 | Samples | 1.4.C |
| 233600 | 02-20 | Certificates | 1.4.D |
| 233600 | 02-20 | Operation and Maintenance Manuals | 1.4.E |
| 233700 | 02-20 | Manufacturer's Literature and Data | 1.4.B |
| 233700 | 02-20 | Coordination Drawings | 1.4.C |
| 237413 | 03-20 | Manufacturer's Literature and Data | 1.4.B |
| 237413 | 03-20 | Maintenance and operating manuals | 1.4.C |
| 237413 | 03-20 | written test procedures | 1.4.D |
| 237413 | 03-20 | Completed System Readiness Checklists | 1.4.E |
| 237413 | 03-20 | shipping information | 1.4.F |
| 238216 | 03-20 | Manufacturer's Literature and Data for Heating and Cooling Coils | 1.4.B |
| 238216 | 03-20 | installation, operating and maintenance instructions | 1.4.C |
| 238216 | 03-20 | Certification Compliance | 1.4.D |
| 238216 | 03-20 | Coils may be submitted with Section 23 36 00 and Section 23 74 13 | 1.4.E |
| 260511 | 01-16 | Service Qualifications - contact list(s) | 1.4.C |
| 260511 | 01-16 | job specific work plan | 19.C.3 |
| 260511 | 01-16 | Government's approval shall be obtained for all materials and equipment before delivery to the job site | 1.12.B |
| 260511 | 01-16 | adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary | 1.12.C |
| 260511 | 01-16 | individual systems and equipment assemblies which consist of more than one item or component | 1.12.D |
| 260511 | 01-16 | Information that confirms compliance with contract requirements | 1.12.E.1 |
| 260511 | 01-16 | Elementary and interconnection wiring diagrams for communication and signal systems, control systems, and equipment assemblies | 1.12.E.3 |
| 260511 | 01-16 | Parts list | 1.12.E.4 |
| 260511 | 01-16 | Maintenance and Operation Manuals | 1.12.F |
| 260511 | 01-16 | Samples - minimum 300 mm (12 inches) length of each type and size of wire | |
and cable along with the tag from the coils or reels from which the
| sample was taken | 1.12.H.1 | | | | |
| | 260511 | 01-16 | Samples - Each type of conduit coupling, bushing, and termination fitting | 1.12.H.2 |
| | 260511 | 01-16 | Samples - Conduit hangers, clamps, and supports | 1.12.H.3 |
| | 260511 | 01-16 | Samples - Duct sealing compound | 1.12.H.4 |
| | 260511 | 01-16 | Samples - Each type of receptacle, toggle switch, lighting control sensor, outlet box, manual motor starter, device wall plate, engraved nameplate, wire and cable splicing and terminating material, and branch circuit single pole molded case circuit breaker. | 1.12.H.5 |
| | 260511 | 01-16 | Contractor - training schedule | 1.16.C |
| 260519 | 01-17 | Shop Drawings | 1.4.1 |
| 260519 | 01-17 | Certifications | 1.4.2 |
| 260526 | 01-17 | Shop Drawings | 1.4.A.1 |
| 260526 | 01-17 | Test Reports | 1.4.A.2 |
| 260526 | 01-17 | Certifications | 1.4.A.3 |
| | 260533 | 01-18 | Shop Drawings | 1.4.A.1 |
| | 260533 | 01-18 | Certifications | 1.4.A.2 |
| | 260533 | 01-18 | Layout and Homeruns - proposed deviations | 3.2.E.2 |
| | 260533 | 01-18 | CONCEALED WORK INSTALLATION - drawing showing location, size, and position of each | |
| penetration | 3.3.A.3.b | | | | |
| 260573 | 01-18 | Product data on the software program to be used for the study | 1.4.A.1 |
| 260573 | 01-18 | Complete study as described in paragraph 1.6 | 1.4.A.2 |
| 260573 | 01-18 | Certifications | 1.4.A.3 |
| 260800 | 11-16 | List of Submittals | 1.6 |
| 260800 | 11-16 | Pre-Functional Checklists | 3.2 |
| 260800 | 11-16 | Training | 3.5 |
| 260923 | 01-18 | Shop Drawings | 1.4.A.1 |
| 260923 | 01-18 | Manuals | 1.4.A.2 |
| 260923 | 01-18 | Certifications | 1.4.A.3 |
| 260923 | 01-18 | contractor - written instructions on training and maintenance as reviewed in training session | 3.4.B |
| 262726 | 01-18 | Shop Drawings | 1.4.A.1 |
| 262726 | 01-18 | Manuals | 1.4.A.2 |
| 262726 | 01-18 | Certifications | 1.4.A.3 |
| 265100 | 01-18 | Shop Drawings | 1.4.A.1 |
| 265100 | 01-18 | Manuals | 1.4.A.2 |
| 265100 | 01-18 | Certifications | 1.4.A.3 |
| 270511 | 09-19 | RELATED WORK - Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. | 1.5.A.2 |
| 270511 | 09-19 | Provide parts list including quantity of spare parts | 1.7.B |
| 270511 | 09-19 | Provide manufacturer product information | 1.7.C |
| 270511 | 09-19 | Provide Source Quality Control Submittal | 1.7.D |
| 270511 | 09-19 | Installer Qualifications | 1.7.E |
| 270511 | 09-19 | Provide delegated design submittals (e.g. seismic support design) | 1.7.F |
| 270511 | 09-19 | all equipment anchors and supports | 1.7.G |
| 270511 | 09-19 | Test Equipment List | 1.7.H |
| 270511 | 09-19 | Submittal Drawings - Telecommunications Space Plans/Elevations | 1.7.I.1 |
| 270511 | 09-19 | Submittal Drawings - Logical Drawings | 1.7.I.2 |
| 270511 | 09-19 | Submittal Drawings - Access Panel Schedule | 1.7.I.3 |
| 270511 | 09-19 | Provide sustainable design submittals | 1.7.J |
| 270511 | 09-19 | Furnish electronic certified test reports | 1.7.K |
| 270511 | 09-19 | closeout submittals | 1.8.A |
| 270511 | 09-19 | Maintenance and Operation Manuals | 1.8.B |
| 270511 | 09-19 | Record Wiring Diagrams | 1.8.C |
| 270511 | 09-19 | Service Qualifications | 1.8.D |
| 270511 | 09-19 | MAINTENANCE MATERIAL | 1.9.A |
| 270511 | 09-19 | Product and System Qualification | 1.9.B |
| 270511 | 09-19 | Trade Contractor Qualifications | 1.9.C |
| 270511 | 09-19 | System Supplier Qualifications | 1.9.D |
| 270511 | 09-19 | written evidence of current OEM certifications for installers | 1.9.E |
| 270511 | 09-19 | Manufacturer’s Qualifications | 1.10.A |
| 270511 | 09-19 | Product and System Qualification | 1.10.B |
| 270511 | 09-19 | Trade Contractor Qualifications | 1.10.C |
| 270511 | 09-19 | System Supplier Qualifications | 1.10.D |
| 270511 | 09-19 | Telecommunications technicians | 1.10.E |
| 270511 | 09-19 | Manufactured Products | 1.10.F |
| 270511 | 09-19 | Testing Agencies | 1.10.G |
| 270511 | 09-19 | Delivery and Acceptance Requirements | 1.11.A |
| 270511 | 09-19 | written notice | 3.6.D |
| 270511 | 09-19 | Acceptance Test | 3.6.I |
| 270511 | 09-19 | training schedule | 3.8.C |
| 270533 | 10-18 | REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS | 1.3.A |
| 270533 | 10-18 | Layout and Homeruns - Deviations | 3.1.C.22 |
| 270533 | 10-18 | drawing showing location, size, and position of each penetration | 3.1.D.2 |
| 270800 | 11-16 | List of Submittals | 1.3 |
| 270800 | 11-16 | Closeout Submittals | 1.4 |
| 271500 | 01-16 | REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS | 1.3.A |
| 271500 | 01-16 | Certifications | 1.3.B |
| 271500 | 01-16 | Closeout Submittal | 1.3.C |
| 271500 | 01-16 | Active and passive equipment | 2.1.B.5 |
| 271500 | 01-16 | pretest results and certification | 3.2.C.1 |
| 275116 | 01-18 | Contractor - written statement attesting this requirement | 1.1.F |
| 275116 | 01-18 | QUALIFICATIONS - names, locations and point of contact for these installations | 1.5.A |
| 275116 | 01-18 | QUALIFICATIONS - certified documentation that they have been an authorized distributor and service organization for the OEM for a minimum of three (3) years | 1.5.B |
| 275116 | 01-18 | QUALIFICATIONS - formal written evidence of current OEM certification(s) for the installer(s) | 1.5.C |
| 275116 | 01-18 | QUALIFICATIONS - Certificate of successful completion of OEM’s installation/training school | 1.5.E |
| 275116 | 01-18 | drawings and product data on all proposed equipment and system | 1.8.A |
| 275116 | 01-18 | Support all submittals with descriptive materials | 1.8.B |
| 275116 | 01-18 | complete and through equipment list of equipment expected to be installed in the system, with spares, as a part of the submittal | 1.8.C |
| 275116 | 01-18 | Provide four (4) copies to the PM for technical review | 1.8.D |
| 275116 | 01-18 | Contractor - System survey(s) | 1.8.I |
| 275116 | 01-18 | PROJECT CLOSE-OUT - Contractor submissions | 1.13.A |
| 275116 | 01-18 | PROJECT CLOSE-OUT - Contractor written notice | 1.13.B |
| 275116 | 01-18 | MANUFACTURERS - published and distributed descriptive literature and equipment specifications on the items of equipment | 2.3.A.3 |
| 275116 | 01-18 | Contractor - four (4) copies of the recorded system pretest measurements and the written certification that the System is ready for the formal acceptance test | 4.1.B.3 |
| 275116 | 01-18 | Acceptance Test - acceptance test date giving RE 30 days notice | 4.1.C.1 |
| 275116 | 01-18 | Contractor - test equipment list | 4.1.E |
| 280500 | 04-18 | Contractor submissions | 1.1.C |
| 280500 | 04-18 | Security Contractor - necessary maintenance and troubleshooting manuals | 1.1.D |
| 280500 | 04-18 | Contractor - copies of system manufacturer certification for all technicians | 1.4.C.1 |
| 280500 | 04-18 | Contractor - provide proof project superintendent with BICSI Certified Commercial Installer Level 1, Level 2, or Technician to provide oversight of the project | 1.4.C.2 |
| 280500 | 04-18 | Service Qualifications | 1.4.D |
| 280500 | 04-18 | Government's approval shall be obtained for all equipment and material before delivery to the job site | 1.6.B |
| 280500 | 04-18 | Submittals for individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assembly as a whole | 1.6.C |
| 280500 | 04-18 | Submittal inclusions | 1.6.D |
| 280500 | 04-18 | Submittal compliance | 1.6.E |
| 280500 | 04-18 | Maintenance and Operation Manuals | 1.6.E.6.f.1 |
| 280500 | 04-18 | Contractor - Product Data | 1.6.E.9 |
| 280513 | 10-18 | Manufacturer's Literature and Data | 1.5.A.1 |
| 280513 | 10-18 | Certificates | 1.5.A.2 |
| 280513 | 10-18 | Shop Drawings | 1.5.A.3 |
| 280513 | 10-18 | Wiring Diagrams | 1.5.A.4 |
| 280513 | 10-18 | Cable Administration Drawings | 1.5.A.5 |
| 280513 | 10-18 | Project planning documents as specified in Part 3 | 1.5.A.6 |
| 280513 | 10-18 | Maintenance Data | 1.5.A.7 |
| 280800 | 11-16 | List of Submittlas | 1.6 |
| 280800 | 11-16 | Pre-functional Checklists | 3.2 |
| 280800 | 11-16 | Training | 3.5 |