Technical Questions Tracking Spreadsheet - PB TASS PH2 - Final Response 8-8-2023.pdf

PDF 90 KB Posted

Attached to
Y1DA--EHRM Training and Admin Phase II - Poplar Bluff Federal contract opportunity
Solicitation number
36C77623B0028
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a technical questions tracking spreadsheet for solicitation number 36C77623B0028 for the EHRM Training and Admin Phase II construction project in Poplar Bluff, Missouri. The VA received eleven technical questions between July 26-31, 2023 regarding specifications for the fiber optic conduit, construction access and gates, driveway and handrail details, and asphalt sealing requirements. The VA provided responses clarifying that the design intent for the conduit must be retained, contact information for the city of Poplar Bluff, discussions with MoDot for alternate access, that the contractor will determine temporary access needs and tree replacement responsibilities, gates will be retained by the contractor, handrails must meet ADA and VHA standards, and asphalt sealing is not required.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Training and Admin Phase II - Poplar Bluff, newest first.
File Type Posted
Technical Questions Tracking Spreadsheet - PB TASS PH2 - Updated Final Response 8-9-2023.pdf PDF
36C77623B0028 0004.docx DOCX document
Wage Determination - Construction - Butler - 6-30-2023.pdf PDF
36C77623B0028 0003.docx DOCX document
36C77623B0028 0002.docx DOCX document
36C77623B0028 0001.docx DOCX document
657A4-22-706 Construction Prebid Attendance Site Visit sign-in sheet.pdf PDF
Attachment 1 - EHRM Training and Adm - Specs.pdf PDF
Attachment 7 - RECORDS MANAGEMENT OBLIGATIONS.pdf PDF
Attachment 2 - EHRM Training and Admin -Drawings.pdf PDF
36C77623B0028_1.docx DOCX document
Attachment 5 - Submittal Register.xlsx XLSX spreadsheet
Attachment 11 - Site Visit Instructions.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 12 - Site Visit Map.pdf PDF
Attachment 10 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 8 - Wage Determination - Butler County - 06.16.23.pdf PDF
Attachment 6 - OIT for SOW VA Handbook 6500.6 Appendix C POP_PrivacyOnly.pdf PDF
Attachment 4 - Asbestos and Lead Inspection Report - Building 1 - Part 2 of 2.pdf PDF
Attachment 3 - Asbestos and Lead Inspection Report - Building 1 - Part 1 of 2.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION # 36C77623B0028

PROJECT NAME: EHRM Training and Admin Phase II - Construction - Poplar Bluff

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

ITEMS

NO.

DATE

QUESTION(S)

RECEIVED

QUESTION GOVERNMENT RESPONSE

1 7/26/2023 Because of the size of the conduit, can we use a single 48 strand and fusion splice to the 12 strands where it splits to the separate trailers?

VA wishes to retain the design intent as specified in the project spec.

2 7/31/2023 Who is the official contact person for the city of Poplar Bluff for construction access off the end of Old Orchard Rd?

The official contact for the city of Poplar Bluff is Matt Winters City Manager.

3 7/31/2023 Is there a contingency plan if access to Old Orchard Rd is denied by the city?

The VA is negotiating alternate means of access with MoDot through the secondary generator entrance.

4 7/31/2023 What width of the opening is required for the temporary construction entrance?

The contractor shall determine the opening width for construction operations.

5 7/31/2023 Will small trees in the Old Orchard right-of-way need to be replaced if disturbed during implementation of the temporary construction entrance?

The contractor shall negotiate replacement of removed trees with the city during access discussions.

6 7/31/2023 Will temporary construction gates be retained by the contractor when project is completed?

Yes, the temporary construction gates will be retained by the contractor.

7 7/31/2023 Can a detail/cross section be provided for the temporary gate?

No, the contractor shall determine the gate required for their operations. The gate shall provide similar security precautions as the existing fence.

8 7/31/2023 Will the driveway excavations have to be done on nights/weekends or does this only apply to the saw cutting?

Driveway excavations may be performed during standard business hours. Contractor must maintain parking adjacent to excavations with as little impact as possible. Contractor must maintain egress from all parking areas to the facilities during construction. Contractor must install construction

SOLICITATION # 36C77623B0028

PROJECT NAME: EHRM Training and Admin Phase II - Construction - Poplar Bluff

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

boundaries around excavations to ensure employee/patient safety while work is performed.

9 7/31/2023 Can a detail/cross section be provided for the handrail?

Handrail must meet current ADA and VHA Barrier Free requirements, whichever is more stringent. A handrail submittal must be provided to the A/E and VA for approval.

10 7/31/2023 Will a sealer be required to be applied on the new asphalt? Can clarification be made to where this spec is required by State Highway Specifications?

(32 12 16-2 Section 2.4 Sealer A and B)

No sealer is required for new asphalt installation.

11 7/31/2023 Will an arborist certificate be required for tree cutting?

No, an arborist certificate will not be required.

File details come from the government source that posted it. Updated .