This submittal register outlines product data, shop drawings, test reports, certificates, and other submittal items required from the contractor for the Repair Johnson Running Track project. Key requirements include: construction site plans, project schedules, quality control plans, safety plans, as-built drawings, test results for aggregates and asphalt, certifications for materials and equipment, operation and maintenance manuals, and environmental protection plans. The contractor must submit items for review and approval by the specified due dates to the approving authority, with responses provided in the remarks column. The project will be awarded under solicitation FA3016-20-R-0036 by the Department of the Air Force Air Education and Training Command to repair the existing rubberized running track through full depth replacement and resurfacing, along with drainage corrections to the adjacent grass areas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Responses pt2.pdf | ||
| RFI Responses.pdf | ||
| ATTACHMENT 9 - Section M Evaluation Factors.pdf | ||
| ATTACHMENT 8 - Section L Instructions to Offerors and Proposal Preparations.pdf | ||
| Attachment 7 - Construction Cost Estimate Breakdown Jan2020.xlsx | XLSX spreadsheet | |
| ATTACHMENT 2 - Drawings.pdf | ||
| Solicitation - FA301620R0036.pdf | ||
| ATTACHMENT 8 - Section L Instructions to Offerors and Proposal Preparations.pdf | ||
| ATTACHMENT 6 - Climatology Report.pdf | ||
| ATTACHMENT 1 - SOW - SPECIFICATIONS.pdf | ||
| ATTACHMENT 4 - DD 1354 Aug 2013.pdf | ||
| ATTACHMENT 3 Wage Determination TX20200007 3Jan20.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Repair Johnson Running Track | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 11 00.01 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Existing Conditions | G | |||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Quality Control | G | |||||||||||||||||
| SD-02 Shop Drawings | ||||||||||||||||||
| Shop Drawing | G | |||||||||||||||||
| Pre-Construction Qc Checklist | ||||||||||||||||||
| 01 14 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| list of Contract Personnel | 1.4.1.1 | G | ||||||||||||||||
| Installation Access | 1.4.1.2 | |||||||||||||||||
| 01 32 01.00 10 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Project Schedule CPM | G | |||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 01 35 13.30 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Digital Photos | ||||||||||||||||||
| SD-02 Shop Drawings | ||||||||||||||||||
| Surveys | ||||||||||||||||||
| File Geodatabase | ||||||||||||||||||
| Maps | ||||||||||||||||||
| 01 35 26 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.6 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Certificate of Compliance | 1.11.4 | |||||||||||||||||
| License Certificates | ||||||||||||||||||
| 01 35 29 | SD-01 Preconstruction Submittals | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 35 29 | Accident Prevention Plan (APP) | 1.5 | ||||||||||||||||
| GA | ||||||||||||||||||
| Asbestos Hazard Abatement Plan | ||||||||||||||||||
| (for description see spec section | ||||||||||||||||||
| 13280); GA | ||||||||||||||||||
| Lead Hazard Control Plan (for | ||||||||||||||||||
| description see spec section | ||||||||||||||||||
| 13281); GA. | ||||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.6 | G | ||||||||||||||||
| Crane Critical Lift Plan | G | |||||||||||||||||
| Crane Operators | G | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Accident Reports | G | |||||||||||||||||
| Crane Reports | ||||||||||||||||||
| GA | ||||||||||||||||||
| Monthly Exposure Reports | ||||||||||||||||||
| Regulatory Citations and | ||||||||||||||||||
| Violations | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Confined Space Entry Permit | ||||||||||||||||||
| Hot work permit | ||||||||||||||||||
| 01 45 00.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Contractor Quality Control (CQC) | G | |||||||||||||||||
| Plan | ||||||||||||||||||
| 01 50 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Site Plan | 1.3 | G | ||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 50 00 | Traffic Control Plan | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Backflow Preventer Tests | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Backflow Tester | ||||||||||||||||||
| Backflow Preventers | 1.4 | |||||||||||||||||
| 01 57 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| ENVIRONMENTAL | 1.6 | |||||||||||||||||
| PROTECTION PLAN | ||||||||||||||||||
| ENVIRONMENTAL | 3.16 | |||||||||||||||||
| PROTECTION PLAN | ||||||||||||||||||
| G Fish and Wildlife Protection | ||||||||||||||||||
| Measures as applicable; G | ||||||||||||||||||
| Environmental Permits as | ||||||||||||||||||
| applicable; G | ||||||||||||||||||
| Equipment Inventory | 3.7.2 | |||||||||||||||||
| SD-02 Shop Drawings | ||||||||||||||||||
| Asbestos Work Plans | G | |||||||||||||||||
| Asbestos Certifications | G | |||||||||||||||||
| Asbestos Transporter License | G | |||||||||||||||||
| Asbestos Medical clearances | G | |||||||||||||||||
| (may be reviewed on site) | ||||||||||||||||||
| Asbestos Training Certificates | G | |||||||||||||||||
| Asbestos TDSHS License as | G | |||||||||||||||||
| applicable |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Repair Johnson Running Track | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 57 20 | Any Asbestos Inspection reports | G | ||||||||||||||||
| that have not been provided by t | e | |||||||||||||||||
| area specific Environmental Office | . | |||||||||||||||||
| Any Asbestos Inspection Reports | ||||||||||||||||||
| that were not included in the | ||||||||||||||||||
| original assessment or a results to | ||||||||||||||||||
| a change in the scope of work. | ||||||||||||||||||
| G Unsigned copy of State | ||||||||||||||||||
| Renovation, Demolition | ||||||||||||||||||
| Notifications 15 days prior; G | ||||||||||||||||||
| Lead Work Plans | G | |||||||||||||||||
| Lead Occupant Protection Plan. | G | |||||||||||||||||
| Texas Department of State | G | |||||||||||||||||
| Health Services Lead Licenses | ||||||||||||||||||
| Lead Notifications | G | |||||||||||||||||
| Lead Training Certificates | G | |||||||||||||||||
| Lead Based Paint Reports | G | |||||||||||||||||
| Lead Inspection reports | G | |||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Asbestos Air Monitoring reports | G | |||||||||||||||||
| Lead Air Monitoring reports | G | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Lead OSHA Negative Exposure | G | |||||||||||||||||
| Assessment or | ||||||||||||||||||
| Lead Work Plan. | G | |||||||||||||||||
| EPA Lead Training | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 57 20 | Lead Awareness Training | G | ||||||||||||||||
| certificates | ||||||||||||||||||
| OSHA Air Monitoring | G | |||||||||||||||||
| Lead Training Certificates | G | |||||||||||||||||
| Waste Disposal Plan, May be | G | |||||||||||||||||
| included in work plan | ||||||||||||||||||
| Lead Inspection reports | G | |||||||||||||||||
| Lead Based Paint Reports | G | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Analytical Results | 3.1.4.1 | G | ||||||||||||||||
| 01 78 00 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.4.1 | |||||||||||||||||
| Warranty Tags | ||||||||||||||||||
| Spare Parts Data | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Instructions | 1.4.1 | |||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Operation and Maintenance | 3.2 | G | ||||||||||||||||
| Manuals | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| As-Built Drawings | 3.1 | G | ||||||||||||||||
| Record Drawings | G | |||||||||||||||||
| As-Built Record of Equipment | 1.4.1 | |||||||||||||||||
| and Materials | ||||||||||||||||||
| Final Approved Shop Drawings | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 78 00 | Construction Contract | |||||||||||||||||
| Specifications | ||||||||||||||||||
| 02 41 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Existing Conditions | 1.11 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Demolition Plan | 1.2.1 | G | ||||||||||||||||
| Notification | G | |||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Receipts | 3.3.5 | |||||||||||||||||
| 31 00 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Shoring | G | |||||||||||||||||
| Dewatering Work Plan | G | |||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Utilization of Excavated Materials | 3.6 | G | ||||||||||||||||
| Rock Excavation | ||||||||||||||||||
| Opening of any Excavation or | 3.2 | |||||||||||||||||
| Borrow Pit | ||||||||||||||||||
| Shoulder Construction | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Testing | 3.11 | |||||||||||||||||
| Borrow Site Testing | 2.1 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Testing | 3.11 | |||||||||||||||||
| 32 11 20 | SD-03 Product Data | |||||||||||||||||
| Plant, Equipment, and Tools | 1.5 | G | ||||||||||||||||
| Waybills and Delivery Tickets | 1.1.3 | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 32 11 20 | SD-06 Test Reports | |||||||||||||||||
| Initial Tests | 2.2.1 | G | ||||||||||||||||
| In-Place Tests | 3.13.1 | G | ||||||||||||||||
| 32 11 23 | SD-03 Product Data | |||||||||||||||||
| Plant, Equipment, and Tools | 1.5 | G | ||||||||||||||||
| Waybills and Delivery Tickets | 1.1.3 | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Initial Tests | 2.3.1 | G | ||||||||||||||||
| In-Place Tests | 3.13.1 | G | ||||||||||||||||
| 32 11 30 | SD-04 Samples | |||||||||||||||||
| lime-treated material | 3.2.11.1 | |||||||||||||||||
| Lime | 2.1 | |||||||||||||||||
| SD-05 Design Data | ||||||||||||||||||
| Job-mix formula | 1.5.1 | |||||||||||||||||
| procedures | 1.5.1 | |||||||||||||||||
| equipment | 1.5.1 | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Site preparation | 3.1 | |||||||||||||||||
| Final compaction | 3.6.4 | |||||||||||||||||
| Field application rate test | 3.6.6 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Bituminous curing seal | 2.4 | |||||||||||||||||
| Lime | 2.1 | |||||||||||||||||
| equipment | 1.5.1 | |||||||||||||||||
| 32 12 13 | SD-03 Product Data | |||||||||||||||||
| Waybills and Delivery Tickets | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 32 12 13 | Local/Regional Materials | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Sampling and Testing | 3.7 | |||||||||||||||||
| 32 12 16 | SD-03 Product Data | |||||||||||||||||
| Mix Design | 2.4 | G | ||||||||||||||||
| Quality Control | 3.10 | G | ||||||||||||||||
| Material Acceptance | 3.11 | G | ||||||||||||||||
| Percent Payment | G | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Asphalt Cement Binder | 2.3 | |||||||||||||||||
| Aggregates | 2.2 | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Aggregates | 2.2 | G | ||||||||||||||||
| QC Monitoring | 3.10.3.10 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Asphalt Cement Binder | 2.3 | G | ||||||||||||||||
| Testing Laboratory | 3.6 | |||||||||||||||||
| 32 17 23 | SD-03 Product Data | |||||||||||||||||
| Surface Preparation Equipment | 2.1.1 | G | ||||||||||||||||
| List | ||||||||||||||||||
| Application Equipment List | 2.1.2 | G | ||||||||||||||||
| Exterior Surface Preparation | 3.2 | |||||||||||||||||
| Safety Data Sheets | 1.4.1 | G | ||||||||||||||||
| Reflective media for airfields | 2.2.9.1 | G | ||||||||||||||||
| Reflective media for roads | 2.2.9.2 | G | ||||||||||||||||
| Waterborne Paint | 2.2.1 | G | ||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 32 17 23 | Solventborne Paint | 2.2.2 | G | |||||||||||||||
| Thermoplastic compound | 2.2.5 | G | ||||||||||||||||
| Thermoplastic compound | 3.3.2 | G | ||||||||||||||||
| Raised Pavement Markers | 2.2.8 | G | ||||||||||||||||
| Primers and Adhesives | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Reflective Media for Airfields | 2.2.9.1 | G | ||||||||||||||||
| Reflective Media for Roads | 2.2.9.2 | G | ||||||||||||||||
| Waterborne Paint | 2.2.1 | G | ||||||||||||||||
| Solventborne Paint | 2.2.2 | G | ||||||||||||||||
| High Build Acrylic Coating | 2.2.6 | G | ||||||||||||||||
| (HBAC) | ||||||||||||||||||
| Thermoplastic Compound | 2.2.5 | G | ||||||||||||||||
| Thermoplastic Compound | 3.3.2 | G | ||||||||||||||||
| Raised Pavement Markers | 2.2.8 | G | ||||||||||||||||
| Primers and Adhesives | ||||||||||||||||||
| Test Reports | 3.4.1 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Qualifications | 1.4.2 | G | ||||||||||||||||
| Reflective Media for Airfields | 2.2.9.1 | |||||||||||||||||
| Reflective Media for Roads | 2.2.9.2 | |||||||||||||||||
| Waterborne Paint | 2.2.1 | |||||||||||||||||
| Solventborne Paint | 2.2.2 | |||||||||||||||||
| Volatile Organic Compound | 1.4.1 | G | ||||||||||||||||
| Volatile Organic Compound | 2.2.6 | G | ||||||||||||||||
| Thermoplastic Compound | 2.2.5 | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Repair Johnson Running Track | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 32 17 23 | Thermoplastic Compound | 3.3.2 | ||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Waterborne Paint | 2.2.1 | G | ||||||||||||||||
| Solventborne Paint | 2.2.2 | G | ||||||||||||||||
| Thermoplastic Compound | 2.2.5 | G | ||||||||||||||||
| Thermoplastic Compound | 3.3.2 | G | ||||||||||||||||
| 32 92 19 | SD-03 Product Data | |||||||||||||||||
| Wood Cellulose Fiber Mulch | 2.5.3 | |||||||||||||||||
| Fertilizer | 2.4 | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Topsoil Composition Tests | 2.2.3 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Seed | 2.1 | |||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Erosion Control Materials | 2.7 |