Attachment 5 - Standard Plan R-40-I.pdf

PDF 1 MB Posted

Attached to
Concrete Patching-Telegraph Rd @ Eliz Lk Rd
Solicitation number
RFP - 591 - 230000000966
Issued by
Oakland County, Pentwater Village, Michigan

About this file

This document is a standard plan from the Michigan Department of Transportation (MDOT) Bureau of Development for load transfer assemblies used in concrete pavement construction and repair. The plan provides detailed specifications for the design and assembly of expansion and contraction joints, including dowel bar and spacer wire dimensions, placement, and installation requirements. It also includes notes on acceptable materials, welding, and alignment tolerances.

The related state and local contract opportunity involves concrete pavement repairs along US-24 (Telegraph Rd) at the Elizabeth Lake Rd ramp in Oakland County and Pentwater Village, Michigan. The project requires a prequalified maintenance contractor and bid bonds. No additional details are provided about the specific scope of work, quantities, response deadlines, or contract term.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

rFIT:AD 03033H3 :AB 03A0HddV

DIRECTOR. BUREAU OF DEVELOPMENT

DIRECTOR. BUREAU OF FIELD SERVICES

1VAIRIddV 'V'MTJ rn 0 n a asaaAstsrvai 2:10,4

0 z

U

SSI'IHIAIHSSV HaJSNVH,L CIVOrl

E5 c

Z o9 _rp, JO m

K m z

—I

F.

I o

-0 z -O

I -

11 1 2"

,2"

F

OR

4'

-0

SL

AB

WI

DT

H

S

PA

CE

S 0" 3'

-0

FO

R S

LA

B

WI

DT

H

F

OR

S

LA

B

WI

DT

H

S

PA

CE

S F

OR

S

LA

B

WI

DT

H

PL

AC

E

FI

LL

ER

S

PA

CE

R

WI

RE

MI

DW

AY

B

ET

WE

EN

DO

L

BA

RS

(D

IM

EN

SI

ON

MA

Y

BE

M

OD

IF

IE

D

TO

F

AC

IL

IT

AT

E

FA

BR

IC

AT

IO

N.

PR

OV

ID

ED

A

MI

NI

MU

M

CL

EA

RA

NC

E

OF

IS

M

AI

NT

AI

NE

D

BE

TW

EE

N

DO

WE

L

BA

R

AN

D

FI

LL

ER

S

PA

CE

R

WI

RE

MA

XI

MU

M

UN

SU

PP

OR

TE

D

LE

NG

TH

S

HA

LL

N

OT

E

XC

EE

D

X

EX

PA

NS

IO

N

CA

PS

P

LA

CE

D

ON

F

RE

E

EN

DS

O F

DO

WE

L

BA

RS

AD

DE

D

TO

U

NI

T

IN

F

IE

LD

) X t

L

BA

R (T

YP

J

OI

NT

F

IL

LE

R

A L a a

MA

XI

MU

M

NO

M.

D

IA

0.

7"

FI

LL

ER

S

PA

CE

R

WI

RE

(T

YP

(M

IN

IM

UM

RE

QU

IR

ED

FI

LL

ER

S

UP

PO

RT

W

IR

E

SH

OU

NO

T

EX

TE

ND

B

EY

ON

D

TH

E

LO

NG

IT

UD

IN

AL

S

PA

CE

R

EL

D

LO

CA

TI

ON

O F

ST

AK

E

ST

AK

E

SH

AL

L

EN

GA

GE

B

OT

TO

M

LO

NG

IT

UD

IN

AL

S

PA

CE

R

WI

RE

AF

TE

R

ST

AK

G.

TH

BO

TT

OM

L

ON

GI

TU

DI

NA

L

SP

AC

ER

WI

RE

S

HA

LL

C

ON

TA

CT

T

HE

B

AS

E

MA

TE

RI

AL

AL

ON

G

IT

S

EN

TI

RE

LE

NG

TH

FO

R

NO

N-

PE

NE

TR

AB

LE

VE

ME

NT

BA

SE

S.

PE

RM

AN

EN

T

CO

NC

RE

TE

A

NC

HO

RS

AN

D

ST

AC

KI

NG

S

LI

PS

SH

AL

L

BE

US

T O

SE

CU

RE

A

SS

EM

BL

Y

TO

B

AS

E.

A S

AP

PR

OV

ED

B Y

TH

E

EN

GI

NE

ER

2k

,2"

WE

L

BA

R

SH

AL

L

BE

A

RC

O

R

RE

SI

ST

CE

ED

T O

BA

SK

ET

A T

AL

TE

RN

AT

E

DS

P

N

V

IE

W

O

F

P A

N S

S S

E M

B

NO

TE

FI

LL

ER

S

PA

CE

R

BE

L

OC

AT

AB

E

OR

B

EL

OW

T

OP

L

ON

GI

TU

DI

NA

L

SP

AC

ER

WI

RE

S

X T Y P

J

OI

NT

F

IL

LE

R

SU

PP

OR

T

BE

C

ON

TI

NU

OU

S

OR

B

RO

KE

N

NO

TE

FO

R

NO

N-

PE

NE

TR

AB

LE

PA

VE

ME

NT

B

AS

ES

1/2

PA

VE

ME

NT

IC

KN

ES

S f t l l"

DI

ME

NS

IO

N

SH

AL

ME

AS

UR

FR

OM

T

HE

B

OT

TO

M

OF

TH

E

PR

OT

RU

DI

NG

L

EG

O F

TH

E

DE

SU

PP

OR

T

WI

RE

T O

TH

E

CE

NT

ER

L

IN

E

OF

TH

E

DO

L.

P

AV

EM

EN

T

TH

IC

KN

ES

S

MI

NU

S

'T x

-o-4

S E

C T

-A f

FO

R

0"

S

LA

B (S

HI

FT

A

SS

EM

BL

Y

A

MA

XI

MU

M

OF

O

FF

C

EN

TE

R

OF

2'

-0

SL

AB

W

ID

TH

A

V1 t

7/8

I/

4" D

EE

P

CU

T

SH

AL

L

BE

M

AD

E

ON

B

OT

H

SI

DE

S

OF

E

XP

AN

SI

ON

J

OI

NT

F

IL

LE

R F

RO

M

EA

CH

E

ND

S O E

ND

S

MA

Y

BE

R

EM

WH

NE

CE

SS

AR

Y

ArHO

LE

D

IA

ME

TE

RS

S

HA

LL

B E

LA

RG

E

EN

OU

GH

T O

AL

LO

W

FR

EE

MO

ME

NT

O

F

FI

BE

R

FI

ER

L

BA

R

T Y P

(D

OW

EL

BA

R

DI

AM

ET

ER

XI

MU

M)

/8"

-(13

PA

CE

S

7/8

.1

3/ 4" F

OR

2'

-0

SL

AB

W

P A

N S

IL

L

R

THELENB

Text Box 4-7-2022

F

OR

-0

SL

AB

WI

DT

H

1VAOUddV ll'A'H'A n asaaAsNvati„ aod

SHI'IfNWSSV 21HdSNVZI,L GVOrl c

> 53

K m

I

-n

F.

Cn _a

/2

1-± I/

2")

11/2

(T Y

P.

) A

SH

IP

PI

N

G

IR

E (T

Y

IR

ES

F

OR

SL

A B

W

IR

ES

F

OR

SL

A B

W

LO

CA

TE

TW

EE

N

EV

OT

HE

R

DO

S

PA

C

ES

e

O

FO

R

SL

A

B W

FO

R

SL

A

B W

S

PA

C

ES

OR

S L A B

WI

DT

H

D L

OC

AT

IO

N

OF

S

TA

KE

ST

K

E

SH

GA

GE

BO

TT

OM

L O

N G

IT

U

D

IN

A L

SP

A

CE

R

W

IR

E.

FT

ST

K

IN

G

TH

E

BO

TT

OM

L

O N

G

IT

U D

IN

A

L

SP

A

CE

R W

IR

E

SH

CO

NT

AC

T

TH

E

M

TE

RI

A

L

AL

ON

G

IT

S

EN

TI

R E

LE

N

G

TH

FO

R

NO

N-

PE

N

ET

R A

B

LE

M

EN

T

B A

S, PE

RM

AN

EN

T

CO

N

CR

ET

E

AN

CH

OR

S

AN

D

ST

A

CK

IN

G

S L

IP

SH

US

TO

CU

SS

EM

BL

SE

A S

A

PP

RO

BY

HE

G

IN

EE

R

P L

C

N T

R A

C T

S

E M

B

TE

SH

IP

PI

N

G T

IE

W

IR

ES

M

AY

B E

LO

CA

TE

D

AB

OV

E

OR

B

EL

OW

T

OP

L

O N

G

IT

U D

IN

A

L

SP

A

CI

N G

W

IR

ES

S E

C T

-A

1I /2" ly

_4

WE

L

BA

R

SH

AL

L B E

AR

C

OR

ST

CE

S K E T A T A

LT

ER

NA

TE

E N

=A

THELENB

1" (+ )1, i/4"

EXPANSION CAP

MIN•

MINIMUM 11/2"

NOTES SHEET 4 OF 4

EPDXY COATED

DOWEL BAR

1" JOINT FILLER

31/

SEE (ADDED TO ASSEMBLY

IN FIELD) 3 „

..-41----

EPDXY COATING

NOT NEEDED

(FIXED END ONLY

(SEE STANDARD

SPECIFICATIONS)

REMOVE FILLER SPACER WIRE

BETWEEN JOINT FILLER SUPPORT

WIRES PRIOR TO INSTALLING

JOINT

41 + 1 w

I-

2 CD

12--.1 w r-

2C I-

-I I 0

CC

C)

NOM.

FILLER

TOP

NOM. DIA. 0.243"

LONGITUDINAL FILLER SUPPORT WIR

NOM. DIA. 0.243"

JOINT FILLER SUPPORT WIRE

DIA. 0.177'

SPACER WIRE

OF PAVEMENT BASE

THE FILLER

NOM. DIA. 0.211" WIRE

NOM. DIA. 0.319" WIRE

POINT IS OPTIONAL

1' -7" MIN.

END VIEW OF EXPANSION JOINT ASSEMBLY

NOTE: FILLER SPACER WIRE MAY BE LOCATED ABOVE OR BELOW TOP LONGITUDINAL SPACER WIRES

+ 1" 1'-6"

MINIMUM 11'2'

SEE NOTES SHEET 4 OF 4

EPDXY COATED

DOWEL BAR

3"

EPDXY COATING

NOT NEEDED

(FIXED END ONLY)

MAXIMUM NOM. DIA. 0.177"

SHIPPING TIE WIRE

TOP OF PAVEMENT BASE

1' -7" MIN.

ti

END VIEW OF CONTRACTION JOINT ASSIEMI3I,Y

NOTE: SHIPPING TIE WIRE MAY BE LOCATED ABOVE OR BELOW TOP LONGITUDINAL SPACER WIRES

MICHIGAN DEPARTMENT OF TRANSPORTATION

BUREAU OF DEVELOPMENT STANDARD PLAN FOR

LOAD TRANSFER ASSEMBLIES

STAKE DETAIL FOR TRANSVERSE JOINTS

A SINGLE WIRE MAY BE USED IN LIEU OF STAKE DETAIL SPECIFIED

PROVIDED A NOM. DIA. 0.319" WIRE IS USED AND BENT INTO A

HOOK AT TOP END TO CONFORM TO DETAIL 10-1-2021 R-40-I

SHEET

3 OF 4 F.H.W.A. APPROVAL PLAN DATE

THELENB

DOWEL BAR SHALL BE ARC OR SIDE SUPPORT WIRE RADIUS =

RESISTANCE WELDED TO BASKET AT DOWEL BAR DIA. + 1,8” TO 3,6,,

ALTERNATE ENDS AS SPECIFIED IN

PLAN VIEW ON SHEET 2 2

NOM. DIA. 0.306' TOP

LONGITUDINAL SPACER WIRE

NOM. DIA. 0.243" ARC RESISTANCE WELD OR

SIDE SUPPORT WIRE

NOM. DIA. 0.306" BOTTOM

LONGITUDINAL SPACER WIRE

T

SIDE SUPPORT WIRE DETAIL

U - LEG OPTION

DOWEL BAR SHALL BE ARC OR SIDE SUPPORT WIRE RADIUS =

RESISTANCE WELDED TO BASKET AT DOWEL BAR DIA. + 1,8" TO 3l6"

ALTERNATE ENDS AS SPECIFIED IN

PLAN VIEW ON SHEET 2 2

NOM. DIA. 0.306" TOP

LONGITUDINAL SPACER WIRE

NOM. DIA. 0.243" RESISTANCE WELD K ARC OR

SIDE SUPPORT WIRE

NOM. DIA. 0.306" BOTTOM

LONGITUDINAL SPACER WIRE

SIDE SUPPORT WIRE DETAIL

J - LEG OPTION

DOWEL BAR SHALL BE ARC OR SIDE SUPPORT WIRE RADIUS =

RESISTANCE WELDED TO BASKET AT DOWEL BAR DIA. + TO 3l6"

ALTERNATE ENDS AS SPECIFIED IN

PLAN VIEW ON SHEET 2 2

VERTICAL FOR

DOWELS

NOM. DIA. 0.306" TOP

LONGITUDINAL SPACER WIRE BEND LEG

OUTERMOST

NOM. DIA. 0.243"

SIDE SUPPORT WIRE

WELD ARC OR RESISTANCE

NOM. DIA. 0.306" BOTTOM

LONGITUDINAL SPACER WIRE

51/2"

SIDE SUPPORT WIRE DETAIL

V - LEG OPTION

NOTES:

LOAD TRANSFER ASSEMBLIES SHALL BE PLACED AT RIGHT ANGLES TO THE

PAVEMENT CENTERLINE.

THE SIDE SUPPORT WIRE (U-LEG, J-LEG DR V-LEG( MAY BE INSTALLED ON

EITHER THE INSIDE OR THE OUTSIDE OF THE LONGITUDINAL SPACER WIRES.

THE DIMENSION FROM THE END OF THE DOWEL BAR TO THE CENTER OF THE

TOP LONGITUDINAL SPACER WIRE SHALL BE A MINIMUM OF 11,2". THIS

DIMENSION APPLIES TO SIDE SUPPORT WIRES INSTALLED ON EITHER THE

INSIDE OR THE OUTSIDE OF THE LONGITUDINAL SPACER WIRES.

WIRES:

ALL WIRES SPECIFIED (EXCEPT SHIPPING TIE WIRES) ARE MINIMUM NOMINAL

SIZES ALLOWED. (DO NOT EXCEED THE MAXIMUM NOMINAL DIAMETER OF

0.177" FOR SHIPING TIE WIRES.)

ALL WIRES SHALL CONFORM TO THE CURRENT SPECIFICATIONS FOR CARBON

STEEL WIRE FOR GENERAL USE, A.S.T.M. DESIGNATION A-853, GRADE 1008

OR GREATER. UNLESS OTHERWISE SPECIFIED, MINIMUM TENSILE STRENGTH

REQUIREMENTS SHALL BE 60 ksi.

ALL WIRE INTERSECTIONS ARE TO BE ARC OR RESISTANCE WELDED.

STAKES TYPICALLY APPLIED AT WORKING ENDS OF DOWELS WITH SUFFICIENT

INSTALLATIONS TO PREVENT UNIT FROM OVERTURNING UNDER LOAD.

DO NOT CUT FILLER SPACER WIRES AFTER THE LOAD TRANSFER ASSEMBLY IS

SET IN PLACE.

DOWEL BARS:

DOWEL BARS ARE TO BE ACCORDING TO THE STANDARD SPECIFICATIONS FOR

CONSTRUCTION.

EPDXY COATED DOWEL BARS ARE TO BE FACTORY COATED WITH A VISIBLE

COATING OF AN APPROVED BOND RELEASE AGENT, UNIFORMLY APPLIED

BY DIPPING AND WITHOUT EXCESSIVE DRIPS OR THICKNESS IN SUCH A

THICKNESS THAT ITS PRESENCE CAN BE READILY IDENTIFIED.

METAL EXPANSION CAPS MUST BE ENTIRELY CLOSED AT ENDS BY CRIMPING.

PLASTIC CAPS MUST HAVE A POSITIVE STOP. DO NOT DRIVE CAPS BEYOND

THEIR STOP. EXPANSION CAPS MUST HAVE A SUITABLE STOP TO ENSURE

THAT THE END OF THE CAP MAINTAINS A DISTANCE OF 1" (EXPANSION) FROM

THE END OF THE DOWEL DURING CONCRETE PLACEMENT.

DOWEL BARS SHALL BE COATED WITH EPDXY COATING ACCORDING TO

THE STANDARD SPECIFICATIONS FOR CONSTRUCTION. CUT ENDS ARE NOT

REQUIRED TO BE COATED.

DOWEL BAR DIAMETER PAVEMENT THICKNESS

1" 6" - LESS THAN 8'

114' 8" - 10"

11,2" GREATER THAN 10"

DOWEL BARS SHALL BE ALIGNED PARALLEL TO EACH OTHER IN THE ASSEMBLY

ON 1'-0" (± 1/2") CENTERS.

AFTER THE LOAD TRANSFER ASSEMBLY IS SET IN PLACE, DOWEL BARS SHALL

REMAIN ALIGNED (PARALLEL) WITH EACH OTHER IN THE VERTICAL AND

HORIZONTAL PLANES OF THE PAVEMENT TO WITHIN 14 FOR THE ENTIRE

LENGTH OF THE BAR.

DOWEL BARS SHALL BE PLACED AT MID DEPTH OF THE SLAB UNIFORMLY

ALIGNED WITHIN 14 FOR THE ENTIRE LENGTH OF THE BAR.

FOR PAVEMENTS WITH VARIABLE THICKNESS TRANSVERSLY ACROSS THE SLAB,

THE TOP AND BOTTOM SURFACES OF THE DOWEL BAR SHALL BE WITHIN THE

MIDDLE i/3 OF THE PAVEMENT THICKNESS, AS APPROVED BY THE ENGINEER.

MICHIGAN DEPARTMENT OF TRANSPORTATION

BUREAU OF DEVELOPMENT STANDARD PLAN FOR

LOAD TRANSFER ASSEMBLIES

FOR TRANSVERSE JOINTS

10-1-2021

F.H.W.A. APPROVAL PLAN DATE

R-40-I

SHEET

THELENB

File details come from the government source that posted it. Updated .