The document provided is a Michigan Department of Transportation standard plan for concrete pavement repair, labeled R-44-F. It contains detailed specifications and diagrams for concrete pavement repairs, including requirements for joint types, forming, sawing, and dowel bar placement.

The related state and local contract opportunity is for concrete pavement repairs along US-24 (Telegraph Rd) at the Elizabeth Lake Rd Ramp in Oakland County, Michigan. The project is open to prequalified maintenance contractors, and performance bonds are required. The contract details, such as response dates, award dates, and contract term, are not provided in the given information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION

OF

SHEET

PLAN DATEF.H.W.A. APPROVALCHECKED BY:

DRAWN BY:

Michigan Department of Transportation

ENGINEER OF DEVELOPMENT

BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR

ENGINEER OF DELIVERY

APPROVED BY:

APPROVED BY:

Kirk T. Steudle

BY

PREPARED

DESIGN DIVISION

CONCRETE PAVEMENT REPAIR

R-44-F

B.L.T.

W.K.P.

JOINT TYPES AS SPECIFIED ON PLANS

1st

POUR

EXISTING DISTRESSED CONCRETE PAVEMENT

TO BE REMOVED AND REPLACED WHEN 1st

POUR IS COMPLETE

JOINT TYPES AS SPECIFIED ON PLANS

METAL OR 2" NOMINAL THICKNESS WOOD FORM

1/4 " HARDBOARD OR EQUIVALENT AS

BOND BREAKER

JOINT TYPES AS SPECIFIED ON PLANS

ONE LANE REPAIRS

(2 - LANE ROADWAY SHOWN)

ALL LANES REPAIRED

(2 - LANE ROADWAY SHOWN)

1/4 " HARDBOARD OR EQUIVALENT TO BRIDGE

BROKEN JOINT OR SPALLED AREAS TO

MAINTAIN CENTERLINE ALIGNMENT

1st

POUR

EXISTING DISTRESSED CONCRETE PAVEMENT

TO BE REMOVED AND REPLACED WHEN 1st

POUR IS COMPLETE

1/4 " HARDBOARD OR EQUIVALENT TO BRIDGE

BROKEN JOINT OR SPALLED AREAS TO

MAINTAIN CENTERLINE ALIGNMENT

1/4 " HARDBOARD OR EQUIVALENT AS BOND

BREAKER WHEN PLACING SECOND POUR

MORE THAN ONE LANE REPAIRED

BUT REPAIR LESS THAN FULL WIDTH

(3 - LANE ROADWAY SHOWN)

FORMING REQUIREMENTS FOR

CAST-IN-PLACE REPAIRS 12’-0" OR LESS

METAL OR 2" NOMINAL THICKNESS WOOD FORM

METAL OR 2" NOMINAL THICKNESS WOOD FORM

FORMING NOTES:

STAKES USED TO HOLD HMA FILLER OR HARDBOARD IN PLACE DURING CONCRETE

PLACEMENT SHALL BE REMOVED BEFORE SCREEDING THE CONCRETE.

ADJACENT LANE REPAIRS MAY BE CAST INTEGRALLY, WHEN APPROVED BY THE ENGINEER.

REPAIR LENGTH

4" TO 6"

(MIN. TAPER)

PLAN OF SAWING DIAGRAM

1 2

THIS METHOD OF REMOVING DISTRESSED CONCRETE SHALL BE USED

IN CONJUNCTION WITH FULL DEPTH CAST-IN-PLACE REPAIRS LESS

THAN 50’-0" LONG AND IS OPTIONAL FOR REPAIRS OVER 50’-0"

IN LENGTH.

THIS FULL DEPTH SAW CUT IS MADE TO FACILITATE OPENING A

TRENCH ACROSS THE SLAB TO RELIEVE COMPRESSION IN THE

PAVEMENT PRIOR TO LIFTING OUT THE FAILED AREA. THIS SAW

CUT MAY BE OMITTED PROVIDED NO SPALLING OF THE REMAINING

CONCRETE OCCURS. IF SPALLING DOES OCCUR, THE CONTRACTOR

WILL BE REQUIRED TO MAKE THIS SAW CUT ON SUBSEQUENT

REPAIRS. WHEN THIS SAW CUT IS USED AND THE ADJACENT LANE

IS NOT REPAIRED, NO OVERCUTTING INTO THAT LANE SHALL BE

MADE.

IF REQUIRED, INTERMEDIATE SAW CUTS MAY BE MADE TO REMOVE

A SECTION OF PAVEMENT LANE WHICH IS OVER 6’-0" IN LENGTH,

TO PERMIT LOADING INTO THE HAULING UNITS.

ADDITIONAL SAW CUTS, AT CONTRACTOR’S EXPENSE, MAY BE MADE

INSIDE THE REPAIR LIMITS TO REDUCE 6’-0" BY 12’-0" OR

LESS SLABS INTO SMALLER PIECES TO FACILITATE REMOVAL.

THIS LONGITUDINAL FULL DEPTH SAW CUT IS MADE BETWEEN

LANES OR BETWEEN ANY COMBINATION OF THE FOLLOWING: LANE,

RAMP, CURB, CONCRETE SHOULDER, OR PARTIAL LANE WIDTH

REPAIR.

2&1

SAWING DIAGRAM & LIFT PIN

FOR REMOVING OLD SLAB

SCHEMATIC OF TYPICAL

LIFT PIN ASSEMBLY

HANDLE

LOCKING KEY LIFT PIN

THESE SAW CUTS SHALL BE FULL DEPTH AND PERPENDICULAR TO

THE EDGE OF THE ROADWAY, WITHIN A TOLERANCE OF 1". NO

OVERCUTTING INTO ADJACENT LANES SHALL BE MADE UNLESS THE

OVERCUT IS WITHIN THE LIMITS OF A SUBSEQUENT REPAIR TO

THE ADJACENT LANE. SHOULDER OVERCUTS WILL BE ALLOWED.

8-9-20109-10-2010

MICHIGAN DEPARTMENT OF TRANSPORTATION

SHEET

PLAN DATEF.H.W.A. APPROVAL

BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR

CONCRETE PAVEMENT REPAIR

R-44-F

1/2 PAVEMENT

THICKNESS <

P A

V E

M E

N T

T H

IC

K

N E

S S

9" < 1/2 "

EXISTING CONCRETE

1"

CAST-IN-PLACE REPAIR JOINTS USING

GROUTED DOWEL OR DEFORMED BARS

* DRILL 1 3/8 " DIAMETER HOLE INTO

EXISTING CONCRETE PAVEMENT AND

GROUT-IN-PLACE #9 x 1’-6" LONG

EPOXY COATED DEFORMED BARS

CONCRETE REPAIR

(4’-0" MIN. LENGTH)

* DRILL 1 3/8 " DIAMETER HOLE INTO

EXISTING CONCRETE PAVEMENT AND

GROUT-IN-PLACE 1 1/4 " DIAMETER

x 1’-6" LONG EPOXY COATED BARS

1/8 " TO 1/4 " R

* EXPANSION CAP

* FIBER JOINT FILLER

HOT-POURED

RUBBER-ASPHALT

SEALANT 1" x 1"

* SEE SHEET 3 OF 6 FOR BAR SPACING

AND SHEET 6 OF 6 FOR NOTES.

EXPANSION JOINT, Erg

1/2 PAVEMENT

THICKNESS <

P A

V E

M E

N T

T H

IC

K

N E

S S

9" < 1/2 "

EXISTING CONCRETE

1/4 "

CONCRETE REPAIR

(4’-0" MIN. LENGTH)

* DRILL 1 3/8 " DIAMETER HOLE INTO

EXISTING CONCRETE PAVEMENT AND

GROUT-IN-PLACE 1 1/4 " DIAMETER

x 1’-6" LONG EPOXY COATED BARS

1/

CONTRACTION JOINT, Crg

1/2 PAVEMENT

THICKNESS <

P A

V E

M E

N T

T H

IC

K

N E

S S

9" < 1/2 "

EXISTING CONCRETE

CONCRETE REPAIR

(4’-0" MIN. LENGTH)

TIED JOINT, Trg

1" MIN. THICKNESS WOOD FORM TO

ESTABLISH INDEPENDENT ALIGNMENT

JOINT TYPES AS SPECIFIED ON PLANS

METAL OR 2" NOMINAL THICKNESS WOOD FORM

1st

POUR

EXISTING DISTRESSED CONCRETE PAVEMENT

TO BE REMOVED AND REPLACED WHEN 1st

POUR IS COMPLETE

JOINT TYPES AS SPECIFIED ON PLANS

METAL OR 2" NOMINAL THICKNESS WOOD FORM

1/4 " HARDBOARD OR EQUIVALENT AS

BOND BREAKER

1" MIN. THICKNESS WOOD FORM TO

ESTABLISH INDEPENDENT ALIGNMENT

JOINT TYPES AS SPECIFIED ON PLANS

METAL OR 2" NOMINAL THICKNESS WOOD FORM

1st

POUR

EXISTING DISTRESSED CONCRETE PAVEMENT

TO BE REMOVED AND REPLACED WHEN 1st

POUR IS COMPLETE

WHEN OFFSET IS GREATER THAN 6’-0" PLACE (C2) JOINT

IN LINE WITH ADJACENT LANE REPAIR JOINT.

1/4 " HARDBOARD OR EQUIVALENT

AS BOND BREAKER

ONE LANE REPAIRS

(2 - LANE ROADWAY SHOWN)

ALL LANES REPAIRED

(2 - LANE ROADWAY SHOWN)

MORE THAN ONE LANE REPAIRED

BUT REPAIRS ARE OFFSET

(3 - LANE ROADWAY SHOWN)

FORMING REQUIREMENTS FOR

CAST-IN-PLACE REPAIRS GREATER THAN 12’-0"

FORMING NOTES:

WHERE REPAIRS LONGER THAN 12’-0" ARE REQUIRED, A NEW GRADE MUST BE ESTABLISHED

ALONG THE OLD PAVEMENT INNER JOINT LINE INDEPENDENT OF THE OLD PAVEMENT SURFACE,

SO THAT SCREEDING MAY BE DONE PERPENDICULAR TO THE CENTERLINE AND INDEPENDENT OF

THE OLD PAVEMENT GRADE.

STAKES USED TO HOLD HMA FILLER OR HARDBOARD IN PLACE DURING CONCRETE PLACEMENT

SHALL BE REMOVED BEFORE SCREEDING THE CONCRETE.

ADJACENT LANE REPAIRS MAY BE CAST INTEGRALLY, WHEN APPROVED BY THE ENGINEER.

BACKER ROD

(BELOW SEALANT)1

3/

HOT-POURED

RUBBER-ASPHALT

SEALANT 1/4 " x 1"

SHEET

PLAN DATEF.H.W.A. APPROVAL

BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR

CONCRETE PAVEMENT REPAIR

R-44-F

1’-0" 1’-0" 1’-0" 1’-0" 1’-0" 2’-0" 1’-0" 1’-0" 1’-0" 1’-0" 1’-0"

1/2 PAVEMENT

THICKNESS <

PAVEMENT

THICKNESS

1 3/8 " DIAMETER HOLES (TYP.)

DOWEL OR DEFORMED BAR SPACING FOR CONCRETE REPAIRS

7"

< 1/2 "

PAVEMENT TO BE CAST AFTER LANE TIE

IS GROUTED INTO EXISTING PAVEMENT EXISTING CONCRETE PAVEMENT

DRILL 3/4 " DIAMETER HOLE INTO THE EXISTING

PAVEMENT AND GROUT-IN-PLACE #5 x 1’-6" LONG

EPOXY COATED DEFORMED BARS

1/2 PAVEMENT

THICKNESS <

P A

V E

M E

N T

T H

IC

K

N E

S S

EPOXY ANCHORED LANE TIE

EXISTING 12’-0" OR 14’-0" (LANES LESS THAN 12’-0" REDUCE CENTER SPACE ACCORDINGLY)

OR

3’-0"

OR

3’-0"

Crg (future)

CrgCrg

Crg (future)

4’ TO 6’ CENTERED

ON ORIGINAL JOINT

EXISTING

JOINT SPACING

EXISTING

JOINT SPACING

OR

FIRST POUR

SECOND POUR

OR

EXISTING

JOINT SPACING

EXISTING

JOINT SPACING

CrgCrg

EXISTING

JOINT

2’ MIN.

4’ MAX.

6’ TO 15’

EXISTING

JOINT SPACING

EXISTING

JOINT SPACING

EXISTING

JOINT

CrgCrg

OR

ALIGN Cp WITH

EXISTING JOINT

EXISTING

JOINT SPACING

EXISTING

JOINT SPACING

CrgCrg

CrgCrgOR

ALIGN Cp WITH

Crg

SINGLE LANE OR FULL WIDTH REPAIR

REPAIR LENGTH 6’ - 15’ WITH

ONE JOINT NEAR AN EXISTING JOINT

(SINGLE LANE REPAIR)

OFFSETTING LANE REPAIRS WITH Cp JOINTREPAIR LENGTHS OVER 15’ WITH Cp JOINT

(SINGLE LANE REPAIR)

NOTE:

THE HOLE SPACING MAY BE ADJUSTED 1" HORIZONTALLY, RAISED 1/2 ", OR LOWERED

1/2 " FROM THE ABOVE LOCATIONS TO AVOID DRILLING INTO THE REINFORCEMENT.

4’ TO LESS THAN 15’ 4’ TO LESS THAN 15’

SHEET

PLAN DATEF.H.W.A. APPROVAL

BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR

CONCRETE PAVEMENT REPAIR

R-44-F

Crg

CrgCrg

Crg

EXISTING LONG JOINT SPACING

USE LANE TIES

OR

4’

TO

15’NEW 15’ JOINT SPACING

PLACE Cp

EVERY 15’

ALIGN Cp

WITH Crg

LONG REPAIR SHOWING

Cp JOINT ALIGNMENTS AND LANE TIES

EXISTING

JOINT SPACING

EXISTING

JOINT SPACING

OVER 10’

BUT LESS

THAN 15’

Crg

Crg

Crg

Crg

Crg

Crg

Cp

OVER 15’

PLACE Cp

EVERY 15’

FULL WIDTH MULTI-LANE REPAIRS

WITH OFFSET IN ONE LANE

CrgCrg

5’

<1’

5’

<1’

Cp

(IF THE PANEL HAS MORE THAN ONE MID-PANEL CRACK REPLACE ENTIRE PANEL)

(SINGLE LANE OR FULL WIDTH REPAIR)

SHEET METAL OR OTHER SUITABLE

THIN MATERIAL STAKED IN PLACE

WIDENING SLABORIGINAL SLAB

JOINT PATCH ADJACENT TO WIDENING SLAB

1/2 " FIBER JOINT FILLER,

PAID FOR AS PART OF THE

WIDENING

ORIGINAL CORNERS BROKEN OUT.

FILL VOIDS WITH CONCRETE, PAID

FOR AS PART OF THE WIDENING.

EXISTING 41’

JOINT SPACING

CrgCrg CpCp CpCp

TWO CRACK PANEL REPAIR MID PANEL CRACK REPAIR

EXISTING 41’

JOINT SPACING

CrgCrg

OMIT

LANE TIES

OMIT

LANE TIES

OMIT

LANE TIES

OMIT

LANE TIES

CpCp CpCp CpCp

10’ MIN. TO 15’ MAX.

JOINT SPACING FOR REPAIR

10’ MIN. TO 15’ MAX.

JOINT SPACING FOR REPAIR

MATCH JOINTS

AND CRACKS

MATCH JOINTS

AND CRACKS

REPAIR OF 12’ - 16’ JPCP WITH

ONLY ONE MID-PANEL CRACK

4’

MIN

8-9-2010

EXISTING 12’ - 16’ JPCP JOINT SPACING

9-10-2010

SHEET

PLAN DATEF.H.W.A. APPROVAL

BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR

CONCRETE PAVEMENT REPAIR

R-44-F

INITIAL SAW CUT

REMOVE CONCRETE AND STEEL

REMOVE CONCRETE

LEAVE EXISTING STEEL

* 2’-6" MIN.

REPLACE C.R.C. PAVEMENT REINFORCEMENT. RECAST CONCRETE.

EXISTING PAVEMENT

FINAL SAW CUT 1 1/2 " DEEP

(SAVE STEEL)

* 2’-6" MIN.

REMOVE CONCRETE

LEAVE EXISTING STEELEXISTING PAVEMENT

FINAL SAW CUT 1 1/2 " DEEP

(SAVE STEEL)

REPLACE WITH SIMILAR BASE MATERIAL

AND COMPACT TO 95% DENSITY

(TO BE PAID FOR AS PART OF THE

CONCRETE PAVEMENT REPAIR)

EPOXY COATED #5 BARS TRANSVERSELY EVERY 12" IN REPAIR

* NOTE: IF EXISTING REINFORCEMENT LAPS ARE ENCOUNTERED IN THIS AREA, FINAL SAW CUT

MUST BE MOVED BACK TO PROVIDE MINIMUM 2’-6" LAP OF PAVEMENT REINFORCEMENT.

REPAIRING CONTINUOUSLY REINFORCED CONCRETE

FULL DEPTH REPAIR FOR JOINT OR CRACK (TRANSVERSE OR LONGITUDINAL)

FOR CASES IV, & V, THE REMOVED MATERIAL SHALL BE REPLACED WITH A HMA TOP COURSE MIXTURE.

THE HMA SHALL BE COMPACTED WITH A MACHINE VIBRATOR OR APPROVED ROLLER WITH BASE LIFT

THICKNESSES NOT TO EXCEED 3" AND WITH THE TOP LIFT THICKNESS NOT TO EXCEED 2". THE FINAL

SURFACE OF THE REPAIR SHALL BE FLUSH WITH THE EXISTING PAVEMENT SURFACE.

REMOVE EXISTING HMA DETERIORATED CONCRETE PAVEMENT

FULL DEPTH. COMPACT LOOSE EXISTING BASE. REPLACE

AND COMPACT WITH HMA ANY LOST BASE.

REMOVE THE DETERIORATED CONCRETE FULL DEPTH.

COMPACT LOOSE EXISTING BASE. REPLACE AND

COMPACT WITH HMA ANY LOST BASE.

VARIABLE

WIDTH

R E

P A

IR

D E

P T

H

V A

R

IA

B L

E

R E

P A

IR

D E

P T

H

V A

R

IA

B L

E

0.15 GAL/SYD

BOND COAT

EXISTING PAVEMENT

JOINT OR CRACK

EXISTING PAVEMENT

JOINT OR CRACK

VARIABLE

WIDTH

R

E P

A

IR

D E

P T

H

V A

R

IA

B L

E

EXISTING PAVEMENT

JOINT OR CRACK

VARIABLE

WIDTH0.15 GAL/SYD

BOND COAT

0.15 GAL/SYD

BOND COAT

PROVIDE VERTICAL EDGES BY SAW

CUT OR OTHER APPROVED METHOD

CASE IIICASE IICASE I

HMA REPAIR OF

CONCRETE PAVEMENT

HMA REPAIR OF CONCRETE

PAVEMENT WITH HMA SURFACE

HMA REPAIR OF CONCRETE

PAVEMENT WITH HMA SURFACE

REMOVE LOOSE DETERIORATED CONCRETE.

(NOT TO EXCEED PAVEMENT THICKNESS)

REMOVE HMA OVERLAY AND LOOSE

DETERIORATED CONCRETE.

(NOT TO EXCEED PAVEMENT THICKNESS)

REMOVE HMA OVERLAY TO CONCRETE SURFACE.

FOR CASES I, II, & III, THE REMOVED MATERIAL SHALL BE REPLACED WITH A HMA TOP COURSE MIXTURE.

THE HMA SHALL BE COMPACTED WITH A MACHINE VIBRATOR OR APPROVED ROLLER WITH BASE LIFT

THICKNESSES NOT TO EXCEED 3" AND WITH THE TOP LIFT THICKNESS NOT TO EXCEED 2". THE FINAL

SURFACE OF THE REPAIR SHALL BE FLUSH WITH THE EXISTING PAVEMENT SURFACE.

SURFACE REPAIR FOR JOINT OR CRACK (TRANSVERSE OR LONGITUDINAL)

DETAIL

DETAIL

1/2 WIDTH

VARIABLE WIDTH

EXISTING PAVEMENT

JOINT OR CRACK

TOP OF EXISTING

PAVEMENT

0.15 GAL/SYD

BOND COAT

1/2 WIDTH

VARIABLE WIDTH

EXISTING PAVEMENT

JOINT OR CRACK

0.15 GAL/SYD

BOND COAT

12"12"

HMA SURFACE REMOVAL

SAW CUT OR

CHISELED CUT

CASE VCASE IV

FULL DEPTH HMA REPAIR

OF CONCRETE PAVEMENT

FULL DEPTH HMA REPAIR

OF CONCRETE PAVEMENT WITH HMA SURFACE

PROVIDE VERTICAL EDGES BY SAW

CUT OR OTHER APPROVED METHOD

SHEET

PLAN DATEF.H.W.A. APPROVAL

BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR

NOTES:

EXPANSION CAPS SHALL BE ACCORDING TO STANDARD PLAN R-40-SERIES.

THE SAME TYPE JOINT SHALL EXTEND ACROSS ADJACENT LANE REPAIRS.

WHEN Erg JOINTS ARE PLACED ADJACENT TO CONCRETE CURB AND GUTTER THAT

IS NOT REQUIRED TO BE REMOVED, AN Esc JOINT SHALL BE CONSTRUCTED IN

THE CURB AND GUTTER.

AFTER GROUTING IN-PLACE, RC-250 OR AN APPROVED BOND BREAKER SHALL BE

APPLIED TO THAT PORTION OF Crg AND Erg DOWEL BARS THAT EXTEND INTO

THE CAST CONCRETE.

DOWEL AND DEFORMED BARS USED IN Trg, Crg, AND Erg JOINTS SHALL BE

EPOXY COATED ACCORDING TO THE CURRENT STANDARD SPECIFICATIONS.

SAW OVERCUTS IN ADJACENT LANE, SHOULDER, RAMP, AND GUTTERS THAT WILL

REMAIN IN PLACE, SHALL BE CLEANED AND THEN SEALED WITH HOT-POURED

RUBBER-ASPHALT.

CONCRETE PAVEMENT REPAIRS (INCLUDING JOINT TYPES) OR PRESSURE RELIEF

DETAILS SHALL BE AS SPECIFIED ON THE PLANS OR IN THE LOG OF PROJECT.

JOINT RESERVOIRS FOR THE HOT-POURED RUBBER-ASPHALT SEALANT SHALL BE

ABRASIVE BLAST CLEANED, FOLLOWED BY A FINAL CLEANING OF OIL-FREE

COMPRESSED AIR PRIOR TO SEALING.

THE MONTH AND YEAR OF CASTING AND STATION NUMBER (IF REMOVED) SHALL BE

STENCILED ON EACH CONCRETE REPAIR.

WHEN THE CONCRETE PAVEMENT REPAIR IS CONSTRUCTED IN PREPARATION FOR

AN OVERLAY, Crg JOINT RESERVOIRS AND SEALANTS SHALL BE OMITTED AND

EXPANSION JOINTS (Erg) SHALL HAVE THE FIBER JOINT FILLER KEPT FLUSH

TO THE PAVEMENT SURFACE.

Erg JOINTS SHALL BE CONSTRUCTED ONLY WHEN THEY EXTEND ACROSS ALL

LANES, RAMPS, OR SHOULDERS.

WHERE THERE ARE NO REPAIR LOCATIONS WITHIN A 1000’ LENGTH, NO

EXPANSION SPACE WILL BE PROVIDED.

EXPANSION JOINT FILLER SHALL EXTEND THE FULL DEPTH OF THE REPAIR AND

BE FLUSH WITH THE EXISTING PAVEMENT SURFACE. PRIOR TO SEALING, THE

JOINT FIBER FILLER AT THE PAVEMENT SURFACE SHALL BE REMOVED BY CUTTING

1" WIDE AND 1 1/2 " DEEP TO PERMIT THE PLACEMENT OF THE HOT-POURED RUBBER

ASPHALT SEALANT. HOLES IN EXPANSION JOINT FILLER SHALL BE 1 1/2 "

MAXIMUM DIAMETER AND SHALL BE ALIGNED TO FIT DRILLED HOLES IN CONCRETE.

IF THE EXISTING PAVEMENT HAS A HMA SURFACE, THE SAW CUTS SHALL EXTEND

THROUGH THE UNDERLYING PORTLAND CEMENT CONCRETE.

CONCRETE PAVEMENT REPAIR

R-44-F

JOINT WIDTH SAME

AS IN PAVEMENT

PAVEMENT

EXPANSIO

N JO

IN

T, E rg

CURB &

G

UTTER

EXPANSIO

N JO

IN

T, E sc

CURB, GUTTER, AND CURB FACE SHALL BE SAWED AS DEEP AS THE EXISTING

PAVEMENT THICKNESS. THE REMAINING CONCRETE SHALL BE CHIPPED OUT AND

EXPANSION MATERIAL OF SUFFICIENT THICKNESS SHALL BE PLACED IN SAWED

JOINT TO FILL THE GAP AS DIRECTED BY THE ENGINEER.

EXPANSION JOINT, Esc

LANE TIES (TO ADJACENT PAVEMENT LANE, WHEN REQUIRED) SHALL BE SPACED

ACCORDING TO STANDARD PLAN R-41-SERIES, EXCEPT THAT THE FIRST LANE TIE

ADJACENT TO A TRANSVERSE JOINT SHALL BE INSTALLED AT A DISTANCE OF

1’-8" FROM THE JOINT. WHEN BOTH SIDES OF A LONGITUDINAL JOINT ARE

POURED INTEGRALLY, LANE TIES SHALL BE STRAIGHT DEFORMED EPOXY COATED

BARS CAST-IN-PLACE AS SPECIFIED ON STANDARD PLAN R-41-SERIES. WHEN

ADJACENT LANES ARE CAST SEPARATELY, LANE TIES SHALL BE GROUTED-IN-

PLACE AS SPECIFIED ON THIS PLAN. THE GROUT SHALL BE SELECTED FROM THE

PREQUALIFIED MATERIALS LISTED IN THE DEPARTMENT’S "MATERIALS SOURCE

GUIDE", UNDER LANE TIES.

DOWEL BARS AND DEFORMED BARS FOR TIED JOINTS SHALL BE GROUTED INTO

EXISTING PAVEMENT WITH A GROUT SELECTED FROM THE PREQUALIFIED

MATERIALS LISTED IN THE DEPARTMENT’S "MATERIALS SOURCE GUIDE" UNDER

ADHESIVE SYSTEMS FOR GROUTING DOWEL BARS AND TIE BARS FOR FULL-DEPTH

CONCRETE PAVEMENT REPAIRS.

TRANSVERSE CONTRACTION Cp AND EXPANSION E2 JOINTS SHALL BE ACCORDING

TO STANDARD PLAN R-39P-SERIES.

REPAIRED CONCRETE PAVEMENTS REQUIRE THAT 1" OF Erg EXPANSION JOINTS

BE DISTRIBUTED THROUGHOUT A GIVEN 1000’ SECTION.

ALL REPAIRS WILL BE JOINTED PLAIN CONCRETE PAVEMENT.

THE BACKER ROD SHALL MEET THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS

FOR CONSTRUCTION.

/2

PRESSURE RELIEF JOINT

TOP OF JOINT FILLER

3 1/2 " < 1/4 " (MACHINE INSTALLED)

4 1/2 " - 1/4 " (HAND INSTALLED)

PLACE 7 3/4 " < 1/4 " HIGH x 4 1/2 " < 1/8 "

WIDE JOINT FILLER IN SAWED JOINT

FILL ANY VOIDS THAT OCCUR BELOW

FILLER WITH STRIPS OF URETHANE

FOAM OR POLYETHYLENE FOAM

FULL DEPTH SAW CUTS

THIS DETAIL ALSO APPLIES TO HMA SURFACED

CONCRETE PAVEMENT REQUIRING PRESSURE RELIEF JOINTS

NOTES:

WHEN PRESSURE RELIEF JOINT IS TO BE CONSTRUCTED THROUGH

CONCRETE SHOULDER, TRENCHING BELOW CONCRETE MAY BE

NECESSARY TO ALLOW ROOM FOR 7 1/4 " FILLER.

EXPANSION

MATERIAL