Attachment 5 - Solid Waste Reporting Requirements.pdf
PDF 45 KB Posted
- Attached to
- SEW-20001-0J Seward Military Resort Repairs
- Solicitation number
- W912D0-21-B-0002
About this file
This document outlines solid waste reporting requirements for a construction project at Fort Wainwright, Alaska. The contractor must report monthly on the diversion and disposal of construction and demolition debris to the Installation Solid Waste Manager using the Army's Web-Based Support system. Reporting requirements include the date, location, weight, and cost for each disposal transaction, as well as the date, material type, source, and tons for each diverted material. Twenty material types for reporting diversions are defined. A template is provided for contractors to use to submit the required monthly reports on disposal transactions and diverted materials.
A related federal contract opportunity involves repairs to facilities at Seward Military Resort in Seward, Alaska. Work includes replacing decks, upgrading a handicapped bathroom, repairing or replacing rotten logs, and adding attic insulation. The disclosure value is between $500,000 and $1,000,000. The Army intends to award a firm fixed price contract through sealed bidding to a small business. Interested parties are requested to provide company and point of contact information by July 13, 2021. The solicitation is expected to be issued within 180 days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORT WAINWRIGHT SOLID WASTE REPORTING
REQUIREMENTS
The Project manager shall report the diversion and disposal of Construction and Demolition (C&D) material to the Installation Solid Waste Manager for entry into the Solid Waste Annual Reporting, Web-Based Support (SWARWeb) as required in the Army Regulation 420-1, Army Facilities Management, Section 23-15.a, according to the format below every month.
Note that the information required by SWARWeb is not identical to the minimum information required for LEED C&D Waste Credit submittals. SWARWeb requests greater detail than is required by LEED, therefore recording only what is required by LEED will not satisfy the SWARWeb requirements.
For each disposal transaction, report:
1. The time and date
2. Name and location of the disposal site
3. Weight of waste (and indicate if actual scale measurement or an estimate)
4. Unit cost of disposal, e.g.,$/ton or $/CY
For each type of C&D debris material diverted, report the following data elements:
1. Date Occurred: The date the material were delivered to a reuse, recycling, or disposal facility.
List each delivery separately.
2. Category: “C&D Debris” for all materials
3. Type: List material by each type from the list below
4. Info Source: Note either “Weight Actual” or “Weight Estimated”
5. Tons: Self explanatory
6. DRMO/DLA: Note ‘Yes” if the material was delivered to DRMO/DLA, “No” if it was delivered elsewhere
For Type, list all materials that were generated through the construction and/or demolition activities of a project broken down as follows: ABC (Aggregate Base Course)
ABC-ASPHALT LAND-SOIL, TOP
ABC-BRICK LAND-VEGETATION/TIMBER (TREE TRUNKS & LIMBS)
ABC-CONCRETE METAL
ABC-CONCRETE BLOCK UNIT METAL-ALUMINUM
ABC-OTHER (C&D MASONRY/ASPHALT) METAL-COPPER
ABC-STONE METAL-MIXED METAL
ASPHALT METAL-OTHER (C&D METAL)
BRICK METAL-STEEL
C&D REFUSE MIXED C&D (ALL TYPES)
CARPET MIXED METAL
CONCRETE MIXED RECYCLABLES
CONCRETE & MASONARY OD/I/M-CEILING TILE
CONCRETE STONE ASPHALT OD/I/M- COMPOSITION ROOF
CONCRETE/STONE OD/I/M-DOORS/WINDOWS/STAIR/CABINETS
CONSTRUCTION RUBBLE OD/I/M-GLASS
COVER SOIL OD/I/M-GYPSUM/PLASTER
CRUSHED CONCRETE OD/I/M-INSULATION
DEBRIS OD/I/M-OTHER (C/D OTHER)
DIRT OD/I/M-PAPER
GRAVEL OD/I/M-PLASTIC
LAND-CRUSHED STONE/BASE OD/I/M-SIDING
LAND-OTHER (C/D LAND CLEARING) RECYCLED C&D DEBRIS
LAND-SOIL, LEAD-TAINTED, NON-HAZARDOUS TELEPHONE POLE
LAND-SOIL, PETROLEUM-TAINTED WOOD-OTHER (C/D WOOD)
LAND-SOIL, SUBSOIL WOOD-STRUCTURAL
FORT WAINWRIGHT SOLID WASTE REPORTING
Contractor Name: _________________________________ Project Name/Number: _____________________________ Project Manager: __________________________________
DISPOSAL TRANSACTION REPORT:
Date of Disposal:
Name and Location of Disposal Site:
Weight of Waste:
(actual or estimate)
Unit Cost of Disposal:
($/ton or $/CY)
EACH TYPE OF C&D DEBRIS MATERIAL DIVERTED:
Date Occurred:
(The date the material was delivered to a reuse, recycling or disposal facility. List each delivery separately)
Category:
(C&D debris for all materials):
Type (see list):
Weight of Waste: (actual/estimate-tons/pounds/CY):
DLA (DRMO): Note ‘Yes” if the material was delivered to DRMO/DLA, “No” if it was delivered elsewhere
File details come from the government source that posted it. Updated .