Attachment 5 - Solicitation Information.docx
DOCX document 67 KB Posted
- Solicitation number
- Not on record
About this file
This is a Solicitation Information document detailing the pricing structure and contract line items (CLINs) for the Air Force Contract Augmentation Program (AFCAP) VI, an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a minimum contract value of $2,500 and a maximum contract value of $15 billion. The contract encompasses delivery and task orders across multiple contract types including Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Fixed Price Incentive (FPI), and Cost Plus Incentive Fee (CPIF), with provisions for Other Direct Costs (ODC) and travel reimbursement. The program structure includes a base ordering period (CLINs 0001-0006 effective October 1, 2028 through September 30, 2029) and six additional one-year option periods (CLINs 1001-1006 through 7001-7006, extending through September 30, 2036), with corresponding CLINs for each contract type and option year. Each CLIN requires contractors to provide all necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual task orders, with FOB Destination terms and PSC Code S216 (engineering and technical services). The delivery location is HQ AFCEC at Tyndall Air Force Base, Florida (DODAAC FA4819), with the primary contracting officer point of contact being Robert Mellerski at 139 Barnes Drive, Suite 1, Tyndall AFB, FL 32403.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QCI - Draft RFP AFCAP VI.xlsx | XLSX spreadsheet | |
| Attachment 2 - Section L - Instructions Conditions and Notices to Bidders.docx | DOCX document | |
| Attachment 3 - Section M - Evaluation Basis for Award.docx | DOCX document | |
| Special Notice - Draft RFP AFCAP VI.docx | DOCX document | |
| Attachment 1 - Section H - Contract Specific Processes and Procedures.docx | DOCX document | |
| Attachment 4 - AFCAP VI PWS - 20260414.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 - Solicitation Information Section B - Supplies or Services and Prices
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,500.00
$15,000,000,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
FFP Delivery/Task Orders
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
FOB: Destination
SIGNAL CODE: A
NET AMT
PSC CD: S216
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
CPFF Delivery/Task Orders
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
FPI Delivery/Task Orders
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
CPIF Delivery/Task Orders
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
ODC and Travel
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
Data - Exhibit A
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FFP Delivery/Task Orders |
FFP
FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPFF Delivery/Task Orders |
CPFF
CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| FPI Delivery/Task Orders |
FPI
FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| CPIF Delivery/Task Orders |
CPIF
CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| ODC and Travel |
COST
The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Data - Exhibit A |
Data - Exhibit A - DD1423
NET AMT
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| POP 01-OCT-2028 TO |
30-SEP-2029
| N/A |
| HQ AFCEC F4ATA7 |
ROBERT MELLERSKI
139 BARNES DRIVE
SUITE 1
TYNDALL AFB FL 32403
850-283-6275
FA4819
| 0002 |
| POP 01-OCT-2028 TO |
30-SEP-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 0003 |
| POP 01-OCT-2028 TO |
30-SEP-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 0004 |
| POP 01-OCT-2028 TO |
30-SEP-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 0005 |
| POP 01-OCT-2028 TO |
30-SEP-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 0006 |
| POP 01-OCT-2028 TO |
30-SEP-2029
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 1001 |
| POP 01-OCT-2029 TO |
30-SEP-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 1002 |
| POP 01-OCT-2029 TO |
30-SEP-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 1003 |
| POP 01-OCT-2029 TO |
30-SEP-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 1004 |
| POP 01-OCT-2029 TO |
30-SEP-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 1005 |
| POP 01-OCT-2029 TO |
30-SEP-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 1006 |
| POP 01-OCT-2029 TO |
30-SEP-2030
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 2001 |
| POP 01-OCT-2030 TO |
30-SEP-2031
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 2002 |
| POP 01-OCT-2030 TO |
30-SEP-2031
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 2003 |
| POP 01-OCT-2030 TO |
30-SEP-2031
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 2004 |
| POP 01-OCT-2030 TO |
30-SEP-2031
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 2005 |
| POP 01-OCT-2030 TO |
30-SEP-2031
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 2006 |
| POP 01-OCT-2030 TO |
30-SEP-2031
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 3001 |
| POP 01-OCT-2031 TO |
30-SEP-2032
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 3002 |
| POP 01-OCT-2031 TO |
30-SEP-2032
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 3003 |
| POP 01-OCT-2031 TO |
30-SEP-2032
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 3004 |
| POP 01-OCT-2031 TO |
30-SEP-2032
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 3005 |
| POP 01-OCT-2031 TO |
30-SEP-2032
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 3006 |
| POP 01-OCT-2031 TO |
30-SEP-2032
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 4001 |
| POP 01-OCT-2032 TO |
30-SEP-2033
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 4002 |
| POP 01-OCT-2032 TO |
30-SEP-2033
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 4003 |
| POP 01-OCT-2032 TO |
30-SEP-2033
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 4004 |
| POP 01-OCT-2032 TO |
30-SEP-2033
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 4005 |
| POP 01-OCT-2032 TO |
30-SEP-2033
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 4006 |
| POP 01-OCT-2032 TO |
30-SEP-2033
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 5001 |
| POP 01-OCT-2033 TO |
30-SEP-2034
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 5002 |
| POP 01-OCT-2033 TO |
30-SEP-2034
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 5003 |
| POP 01-OCT-2033 TO |
30-SEP-2034
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 5004 |
| POP 01-OCT-2033 TO |
30-SEP-2034
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 5005 |
| POP 01-OCT-2033 TO |
30-SEP-2034
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 5006 |
| POP 01-OCT-2033 TO |
30-SEP-2034
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 6001 |
| POP 01-OCT-2034 TO |
30-SEP-2035
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 6002 |
| POP 01-OCT-2034 TO |
30-SEP-2035
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 6003 |
| POP 01-OCT-2034 TO |
30-SEP-2035
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 6004 |
| POP 01-OCT-2034 TO |
30-SEP-2035
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 6005 |
| POP 01-OCT-2034 TO |
30-SEP-2035
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 6006 |
| POP 01-OCT-2034 TO |
30-SEP-2035
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 7001 |
| POP 01-OCT-2035 TO |
30-SEP-2036
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 7002 |
| POP 01-OCT-2035 TO |
30-SEP-2036
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 7003 |
| POP 01-OCT-2035 TO |
30-SEP-2036
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 7004 |
| POP 01-OCT-2035 TO |
30-SEP-2036
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 7005 |
| POP 01-OCT-2035 TO |
30-SEP-2036
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
| 7006 |
| POP 01-OCT-2035 TO |
30-SEP-2036
| N/A |
| (SAME AS PREVIOUS LOCATION) |
FA4819
File details come from the government source that posted it. Updated .