Attachment 5 - Solicitation Information.docx

DOCX document 67 KB Posted

Attached to
Air Force Contract Augmentation Program (AFCAP) VI DRAFT RFP
Solicitation number
Not on record
Issued by

About this file

This is a Solicitation Information document detailing the pricing structure and contract line items (CLINs) for the Air Force Contract Augmentation Program (AFCAP) VI, an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a minimum contract value of $2,500 and a maximum contract value of $15 billion. The contract encompasses delivery and task orders across multiple contract types including Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Fixed Price Incentive (FPI), and Cost Plus Incentive Fee (CPIF), with provisions for Other Direct Costs (ODC) and travel reimbursement. The program structure includes a base ordering period (CLINs 0001-0006 effective October 1, 2028 through September 30, 2029) and six additional one-year option periods (CLINs 1001-1006 through 7001-7006, extending through September 30, 2036), with corresponding CLINs for each contract type and option year. Each CLIN requires contractors to provide all necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual task orders, with FOB Destination terms and PSC Code S216 (engineering and technical services). The delivery location is HQ AFCEC at Tyndall Air Force Base, Florida (DODAAC FA4819), with the primary contracting officer point of contact being Robert Mellerski at 139 Barnes Drive, Suite 1, Tyndall AFB, FL 32403.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 - Solicitation Information Section B - Supplies or Services and Prices

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$2,500.00

$15,000,000,000.00

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

FOB: Destination

SIGNAL CODE: A

NET AMT

PSC CD: S216

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FFP Delivery/Task Orders

FFP

FFP - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPFF Delivery/Task Orders

CPFF

CPFF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
FPI Delivery/Task Orders

FPI

FPI - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
CPIF Delivery/Task Orders

CPIF

CPIF - Contractor shall provide all the necessary supplies, equipment, personnel, and transportation to perform requirements as directed in individual delivery/task orders issued under this CLIN. The specific cost elements will be negotiated at the delivery/task order level.

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
ODC and Travel

COST

The purpose of this CLIN is to utilize ODC and Travel CLINs on subsequent task orders. The use of this CLIN will be negotiated at the task order level.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Job

OPTION
Data - Exhibit A

Data - Exhibit A - DD1423

NET AMT

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 01-OCT-2028 TO

30-SEP-2029

N/A
HQ AFCEC F4ATA7

ROBERT MELLERSKI

139 BARNES DRIVE

SUITE 1

TYNDALL AFB FL 32403

850-283-6275

FA4819

0002
POP 01-OCT-2028 TO

30-SEP-2029

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

0003
POP 01-OCT-2028 TO

30-SEP-2029

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

0004
POP 01-OCT-2028 TO

30-SEP-2029

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

0005
POP 01-OCT-2028 TO

30-SEP-2029

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

0006
POP 01-OCT-2028 TO

30-SEP-2029

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

1001
POP 01-OCT-2029 TO

30-SEP-2030

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

1002
POP 01-OCT-2029 TO

30-SEP-2030

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

1003
POP 01-OCT-2029 TO

30-SEP-2030

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

1004
POP 01-OCT-2029 TO

30-SEP-2030

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

1005
POP 01-OCT-2029 TO

30-SEP-2030

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

1006
POP 01-OCT-2029 TO

30-SEP-2030

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

2001
POP 01-OCT-2030 TO

30-SEP-2031

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

2002
POP 01-OCT-2030 TO

30-SEP-2031

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

2003
POP 01-OCT-2030 TO

30-SEP-2031

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

2004
POP 01-OCT-2030 TO

30-SEP-2031

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

2005
POP 01-OCT-2030 TO

30-SEP-2031

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

2006
POP 01-OCT-2030 TO

30-SEP-2031

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

3001
POP 01-OCT-2031 TO

30-SEP-2032

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

3002
POP 01-OCT-2031 TO

30-SEP-2032

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

3003
POP 01-OCT-2031 TO

30-SEP-2032

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

3004
POP 01-OCT-2031 TO

30-SEP-2032

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

3005
POP 01-OCT-2031 TO

30-SEP-2032

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

3006
POP 01-OCT-2031 TO

30-SEP-2032

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

4001
POP 01-OCT-2032 TO

30-SEP-2033

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

4002
POP 01-OCT-2032 TO

30-SEP-2033

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

4003
POP 01-OCT-2032 TO

30-SEP-2033

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

4004
POP 01-OCT-2032 TO

30-SEP-2033

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

4005
POP 01-OCT-2032 TO

30-SEP-2033

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

4006
POP 01-OCT-2032 TO

30-SEP-2033

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

5001
POP 01-OCT-2033 TO

30-SEP-2034

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

5002
POP 01-OCT-2033 TO

30-SEP-2034

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

5003
POP 01-OCT-2033 TO

30-SEP-2034

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

5004
POP 01-OCT-2033 TO

30-SEP-2034

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

5005
POP 01-OCT-2033 TO

30-SEP-2034

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

5006
POP 01-OCT-2033 TO

30-SEP-2034

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

6001
POP 01-OCT-2034 TO

30-SEP-2035

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

6002
POP 01-OCT-2034 TO

30-SEP-2035

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

6003
POP 01-OCT-2034 TO

30-SEP-2035

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

6004
POP 01-OCT-2034 TO

30-SEP-2035

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

6005
POP 01-OCT-2034 TO

30-SEP-2035

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

6006
POP 01-OCT-2034 TO

30-SEP-2035

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

7001
POP 01-OCT-2035 TO

30-SEP-2036

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

7002
POP 01-OCT-2035 TO

30-SEP-2036

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

7003
POP 01-OCT-2035 TO

30-SEP-2036

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

7004
POP 01-OCT-2035 TO

30-SEP-2036

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

7005
POP 01-OCT-2035 TO

30-SEP-2036

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

7006
POP 01-OCT-2035 TO

30-SEP-2036

N/A
(SAME AS PREVIOUS LOCATION)

FA4819

File details come from the government source that posted it. Updated .