Attachment 5 - Schedule of Items.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- TBRD Water Leak Repair Phase 2
- Solicitation number
- 127EAX26Q0045
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items attachment that outlines the pricing structure and line items for TBRD Water Leak Repair Phase 2 for the Tonto National Forest. The schedule is organized into base and optional line items, all currently priced at $0.00, requiring contractor quotation submission.
The base scope includes six line items: mobilization including bonding costs (1 EA), relocation of hydrants at Teddy Bear and Christmas Loops (2 EA), leak repair under pavement at Chipmunk and Grapevine Goose Loops (2 EA), leak repair and water pipe replacement at Burnt Corral Campground (1 EA), installation of priority and reduction valves at Grapevine Group Campground (2 EA), and installation of a 4-inch reduction valve at Cholla Campground (1 EA). The optional line items, which cover future leak repairs over a one-year period, include hydrant relocation (1 LS), leak repair under pavement (1 LS), leak repair outside pavement (1 LS), valve installation (1 LS), and replacement of existing water pipe schedule #4 PVC at 100 linear feet (LF). This Request for Quotation (RFQ) is set-aside for small business concerns under the Total Small Business Set-Aside program, with a size standard of $19 million. Contractors must provide labor, materials, equipment, tools, transportation, and supplies to complete work per the Statement of Work, with as-built drawings required upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment 5 Schedule of Items USDA Forest Service Tonto National Forest 2324 E. McDowell Rd., Phoenix, AZ 85006 TBRD Water Leak Repair Phase 2
| Base Line Item | |||||
| Line Items | Items Description | Qty | Unit | Unit Price | Total Price |
| 0001 | TBRD Water Leak Repair Phase 2 | 1 | LS | $0.00 | $0.00 |
| a | Mobilization, Including Bonding Cost | 1 | EA | $0.00 | $0.00 |
| b | Relocation of Hydrants at Teddy Bear and Christmas Loops | 2 | EA | $0.00 | $0.00 |
| c | Leak Repair under pavement at Chipmunk and Grapevine Goose Loops | 2 | EA | $0.00 | $0.00 |
| d | Leak repair and water pipe replacement at Burnt Corral Campground | 1 | EA | $0.00 | $0.00 |
| e | Installation of a priority valve and reduction valve at Grapevine Group Campground | 2 | EA | $0.00 | $0.00 |
| f | Installation of a 4” reduction valve at Cholla Campground | 1 | EA | $0.00 | $0.00 |
| Base Total Amount | $0.00 |
| Optional Line Items | |||||
| g | Relocation of Hydrants | 1 | LS | $0.00 | $0.00 |
| h | Leak Repair under pavement | 1 | LS | $0.00 | $0.00 |
| i | Leak Repair outside of pavement | 1 | LS | $0.00 | $0.00 |
| j | Installation of valves | 1 | LS | $0.00 | $0.00 |
| k | Replacement of existing water pipe by schedule # 4 PVC | 100 | LF | $0.00 | $0.00 |
| Optional Line Item Total | $0.00 |
| Base Plus Optional Line Items | $0.00 | |
| Company Name: | ||
| POC: | ||
| POC Email: | ||
| Contact Number: | ||
| SAM UEI: |
File details come from the government source that posted it. Updated .