This document is a Requests for Information (RFIs) for a project to Install Backup Chiller B700, solicitation number W50S7525QA021. The RFIs cover multiple technical aspects of the chiller installation, including Building Automation System details, electrical power connections, and commissioning requirements. Key details include:
The existing Building Automation System is Automated Logic (Version Web CTRL 9.0), which is not proprietary. The contractor must ensure the backup chiller is compatible with the current HVAC system. Electrical power connection will require the contractor to provide a minimally invasive solution to connect power to the backup chiller, potentially using an existing manhole/junction box with spare conduit. The contractor is responsible for commissioning the backup chiller (CH-2) in accordance with contract specifications, and will need to coordinate BAS/DDC system access with Base Civil Engineering. Additional requirements include furnishing three protective bollards and verifying precise chiller placement based on drawings AE102 and MP101.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S7525BA013_Install_Chiller_B700_Abstract of Offers.pdf | ||
| W50S7525BA0130001_Conformed.pdf | ||
| Attachment 5 - RFI Log 30 Aug.pdf | ||
| W50S7525BA0130001.pdf | ||
| Attachment 7 - Wage Determination 22 Aug 2025.pdf | ||
| Attachment 6 - Statement of Work.pdf | ||
| Attachment 3 - Specifications Div 22-33.pdf | ||
| Attachment 7 - Wage Determination 15 Aug 2025.pdf | ||
| Solicitation - W50S7525BA013.pdf | ||
| Attachment 2 - Specifications Div 00-21.pdf | ||
| Attachment 1 - Drawings.pdf | ||
| Attachment 4 - Existing Site Conditions Pictures.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # Question/Clarification Response
What is the manufacturer and version of the existing Building Automation System (BAS/DDC)?
The manufacturer for the Building Automation System is Automated Logic (Version Web CTRL 9.0).
Is this system proprietary, and are there any specific authorized controls contractors or integrators required for programming and system integration?
The system is not propretary or requires a specific brand name or contractor. Must ensure installation of backup chiller is compatible with current HVAC system including Building Automation System.
The plans do not specify any triple-duty valves or circuit setters installed for the pumps. Without a flow measuring station installed, we have two options:
a. We can calculate the pump's head pressure to determine the GPM flow..
b. Alternatively, utilize an ultrasonic meter to measure flow directly from the pipe at an additional cost. This would require removing insulation from a section of the pipe for access.
Proceed with option A if no capabilities exist under the current setup.
Are we (contractor) Furnishing and installing the protective Bollards?
Yes, the Contractor is to furnish 3 x protective bollards as described in the Government provided drawings (Attachment 1).
Please confirm on Drawings AE 102 and MP 101 The red square is the location we will be putting the backup chiller.
Yes, the red square shown on sheets AE102 and MP101 is the approximate location for the backup chiller. The Contractor must ensure proper/final placement and spacing based on field verified measurements to include spacing around existing components, and manufacturer recommendations.
Please confirm on Drawing M-601 and M-804 The red square is the only Piping, Equipment, and other accessories we will be furnishing.
It appears that the CH-2 will have more Capacity, Flow, and a bit larger in size.
Drawings show recommended requirements. It is the Contractor's responsibility to determine/confirm all piping, equipment, and accessories required to ensure a complete and useable backup chiller for the facilitiy.
Nothing could find in the Description of services about any type of Chemical Introduction will there be. Please advise on that.
This is not required.
Requests For Information (RFIs) - W50S7525QA021 Install Backup Chiller B700
Could you please mark on the drawings where the power will be coming from? (Related to Electrical RFIs)
The Contractor is to provide a recommended power connection based on existing power sources and infrastructure. Note: the intent of the backup chiller is to provide a backup chiller source when the primary chiller is non-operational. It is assumed the power will continue to be functioning.
See attached pictures for existing manhole/junction box and spare conduit adjacent to electrical room for potential electrical tie-in. Connection into electrical room may require a new/separate wall penetration.
Existing Conduit and Feeder Verification: There is an existing manhole/junction box located next to the current chiller (marked in the attached photo).
See response to RFI #10.
Can you please confirm whether there is an existing conduit and feeder (3#1/0, 1#6 E.G., 1 1/2" C rated for 150A, 480V) originating from the electrical room to this junction box, which is intended to serve the new chiller (Chiller #2)? Or should we plan to run a new feeder all the way from the electrical room to the new chiller location?
See attached pictures for existing manhole/junction box and spare conduit adjacent to electrical room for potential electrical tie-in. Connection into electrical room may require a new/separate wall penetration.
11 Trenching and Feeder Routing Plan (If New Feeder is Required): See response to RFI #12.
If there is no existing 150A feeder in the manhole/junction box, is there a drawing or plan indicating the intended underground routing for power from the electrical room to the new chiller? Specifically, do you have a trenching plan showing the proposed conduit path for coordination and installation?
There is no existing plan/drawing for underground routing of power. The Contractor is to provide a minimally invasive solution to connect power to the backup chiller (CH-2) to the facility power.
Will remote access to the existing BAS/DDC system be provided to the controls subcontractor? Please confirm access procedures and any applicable restrictions.
Please coordinate BAS/DDC access with Base Civil Engineering.
Section 23 08 00 of the specifications states that commissioning is required for this project. Will the commissioning for CH-2 be provided by the government or a third-party agent designated by the base?
Commissioning will be provided by the Contractor in accordance with the contract specifications.
If so, can the government provide the name of the commissioning firm that performed work on CH-1?
The commissioning agent for CH-1 was "Above Green".