This document is a Quality Assurance Surveillance Plan (QASP) Matrix for noxious weed survey and treatment services. The matrix establishes performance standards and quality metrics for contractor performance related to daily treatment records and electronic data collection and submission.

The QASP defines three quality rating levels with corresponding performance expectations and payment consequences. Quality Standard for Rating 1 requires all areas within the defined project area to be surveyed with 90% or better effective treatment on targeted plants, 20% or less loss of non-target species, complete and accurate treatment records submitted within specified timeframes, and electronic data meeting 90% accuracy or greater. Quality Standard for Rating 2 addresses deficiencies found during inspections or unmet contractual obligations, with treatment efficacy between 80-90% requiring rework at the contractor's expense, and payment reductions of 20% if standards are not met after a second inspection or 10% reduction for late or inaccurate treatment records and electronic data submissions. Quality Standard for Rating 3 constitutes unacceptable performance where services fail to comply with contract terms and conditions, resulting in negative performance ratings and no payment if efficacy falls below 80% or if treatment records and electronic data are not provided. Monitoring methods include weekly reviews of Quality Control Plan documents by the Contracting Officer's Representative (COR), periodic onsite inspections by inspectors and/or COR, final inspections at least 14 days after completion to determine treatment efficacy and non-target effects, and office reviews of treatment records and electronic data.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) Matrix

Task Sub Task Performance Standard Quality Standard for

Rating 1

Quality Standard for

Rating 2

Quality Standard for

Rating 3 Method of Monitoring

Unacceptable quality of tasks and deliverables. The services provided are not in compliance with contract terms and conditions and do not meet Quality Standards for rating 1 or 2. Negative performance rating will be assigned and no payment will be made if less than

80% of Quality Standard.

Failure to provide any treatment records and/or electronic data for treatment areas within a task order - no payment will be made.

Weekly review of Quality

Control Plan documents by

COR.

Periodic, onsite inspections during performance period by

Inspector(s) and or COR.

Final inspection for treatment efficacy and non-target kill will be determined by ocular estimate at least 14 days after completion.

Performed by Inspector(s) and/or COR. Monitoring plots will be utilized if

Quality Rating 2 or 3 are suspected.

Office review of Treatment

Records and Electronic

Data by COR.

Deficiencies in performance are found during inspections or other contractual obligations are not met.

Less than 90% but greater than 80% treatment efficacy - rework at contractors expense.

Quality Standards are achieved after rework -positive performance rating and full payment.

Failure to meet Quality

Standards (less than 90% efficacy but more than

80%) after second inspection - 20% reduction in payment (reduction will apply to treatment areas on a case by case basis if task order contains multiple treatment areas).

Failure to submit treatment records and/or electronic data by specified time, inaccurate treatment records, or less than 90% complete electronic data -

10% reduction in payment for applicable treatment areas.

Noxious Weed

Survey and

Treatment (all methods)

Daily Treatment

Record and

Electronic Data

Collection and submission

All areas within the defined area are surveyed.

Weeds will be treated within all legal specifications, as defined by the product label (dosage, environmental, etc.)

Contractor is responsible for non-target effects (discuss with COR on case by case basis).

Treatment Records meet defined requirements

Electronic data meets requirments as stated in

Performance Work

Statement and/or task order.

All areas within defined project area are surveyed

90% or better effective treatment on targeted plants (within each treatment area).

20% or less loss of non-target species.

All Treatment Records complete, accurate, and submitted within specified time period.

All electronic data meets

90% accuracy or greater and is submitted within specified time period.