About this file

The document is a Quality Assurance Surveillance Plan (QASP) for a chiller maintenance and repair contract. The QASP outlines five key performance objectives: (1) on-time service delivery, (2) quality product delivery, (3) effective management of unscheduled repairs, (4) safe work performance with environmental mitigation, and (5) compliance with applicable codes and regulations. The surveillance methods include tracking service reports, schedules, maintenance logs, periodic inspections, direct observations, and reviews of safety and compliance documentation. The government will assess the contractor's performance through the Contracting Officer's Representative (COR), Program/Project Manager, and other designated supervisors, with the goal of early identification and resolution of performance issues to minimize mission impact.

View the file

Other files for this federal contract opportunity

Other files attached to Chiller Maintenance Services, newest first.
File Type Posted
36C26125Q0691 0002.pdf PDF
Site Visit Sign-in Sheet VA Palo Alto.pdf PDF
S06 - 36C26125Q0691 0001.pdf PDF
Site Visit Sign-in Sheet VA Livermore.pdf PDF
Site Visit Sign-in Sheet VA Menlo Park.pdf PDF
Attachment A - Inventory - Chillers- 8-27-25-.pdf PDF
Attachment 36 -ME-1.jpg JPG image
Attachment 39 - b334-roof-2.jpg JPG image
Attachment 37 - ME-2.jpg JPG image
Attachment 30 - B101.jpg JPG image
Attachment 12 - 615-3.jpg JPG image
Attachment 43 - B331-1-B.jpg JPG image
Attachment 41 - B101.jpg JPG image
Attachment 28 - b100-5-front -Hybrid OR.jpg JPG image
Attachment 35 - B370-A.jpg JPG image
Attachment 40 - b334- water cooled.jpg JPG image
Attachment 21 - B90-1.jpg JPG image
Attachment 6 - 7-1a.jpg JPG image
Attachment 24 - b100-2front.jpg JPG image
Attachment 14 - b4.jpg JPG image
Attachment 31 - B101.jpg JPG image
Attachment 17 - B6-a.jpg JPG image
Attachment 22 - B90-2.jpg JPG image
Attachment 33 - b102-1 front.jpg JPG image
Attachment 42 - B331-2-C.jpg JPG image
Attachment 20 - b62.jpg JPG image
Attachment 11 - 615-2.jpg JPG image
Attachment 26 - b100-4A-backup.jpg JPG image
Attachment 27 - b100-4B-backup.jpg JPG image
Attachment 7 - 7-2a.jpg JPG image
Attachment 23 - b100-1side.jpg JPG image
Attachment 3 - WD 2015-5637 Rev 30.pdf PDF
Attachment 4 - WD 2015-5623 Rev 27.pdf PDF
S02 - 36C26125Q0691_1 Chiller Maint .pdf PDF
Attachment 38 - b334-roof-1.jpg JPG image
Attachment 29 - B100-G CCU3.jpg JPG image
Attachment 13 - 615-4.jpg JPG image
Attachment 25 - b100-3front.jpg JPG image
Attachment 44 - B102-2.jpg JPG image
Attachment 18 - b62.jpg JPG image
Attachment 10 - 615-1.jpg JPG image
Attachment 15 - b5-1.jpg JPG image
Attachment 16 - b5-2.jpg JPG image
Attachment 2 - WD 2015-5641 Rev 28.pdf PDF
Attachment 1 - Inventory - Chillers.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government-developed document used to determine if the Contractor's performance meets the performance standards contained in the contract at the contract level.

The QASP establishes procedures on how this assessment/inspection process will be conducted.

The Contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the Government's surveillance of the Contractor's performance at the contract level to assure that it meets contract standards. It is the Government's responsibility to be objective, fair and consistent in evaluating Contractor performance. The Government should recognize in the performance of the QASP that unforeseen or uncontrollable circumstances might occur that are outside the control of the Contractor.

The QASP is not it intended to duplicate the Contractor's quality control plan. This QASP is a living document and will change at the Government’s discretion in accordance with changes in contract requirements and the Government’s determination of the effort required to ensure successful Contractor performance of the contract requirements. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on Contractor performance.

Bottom line, the Government’s performance of the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

1. AUTHORITY

Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract.

2. ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate QASP activities. They are not empowered to make any contractual commitments or any contract changes on the Government’s behalf.

1. Program/Project Manager (PM)

2. Contracting Officer’s Representative (COR)

3. Other Designee (direct supervisor (s) of contacted personnel)

Exhibit A. Performance Surveillance Matrix

Performance Objective (Performance Related

Specification)

Performance Standard / Acceptable Quality Level (AQL)

Surveillance Method

PRS#1: Contractor delivers product/ services on time.

Contractor or his technicians perform inspection, maintenance and repair services of chillers per schedule per contract, provide the schedule of planned maintenance work to COR ahead of time, contact the site manager and COR on arrival at site each day of service, provide service reports on time per contract, identify needed repairs and provide quotes for repairs on time per contract, perform required repairs in a reasonable time as agreed on with CO/COR, keep COR informed of any changes in schedule.

Track service reports, track schedules and start and completion of maintenance and repairs.

PRS #2: Contractor delivers a quality product.

Contractor and his technicians perform maintenance of chillers and provide reports and maintain logs per contract, identify issues and their causes proactively with proposed repairs.

Track chiller maintenance reports and logs to identify recurring issues.

PRS #3: Contractor effectively manages and tracks unscheduled repairs

Contractor completes unscheduled repairs in a timely manner and ensures that impact to facility is avoided or minimized.

Review time taken to complete repairs and good faith effort by contractor to minimize impact.

PRS #4: Work is performed safely and impact to the environment is mitigated.

Contractor performs work in compliance with applicable Safety, Health and Environmental regulations, Follows LOTO procedures safely and maintains LOTO record per OSHA standards.

Periodic Inspection (including unscheduled inspections), Direct Observation (including random surveillance). COR Reviews all mishaps and injury reports. Inspection of LOTO records.

PRS #5: Work is performed following the applicable codes, regulations specifications, procedures and technical data.

Contractor performs work in compliance with applicable state and Federal regulations, codes and OSHA standards and in compliance with equipment manufacturer’s instructions and guidelines.

Periodic Inspection (including unscheduled inspections), Direct Observation (including random surveillance).