About this file
Written by GovTribe AI
· Aug 15, 2025
The image depicts a large industrial cooling or HVAC system installed on a concrete rooftop. The equipment is tan and beige in color, with a wire mesh enclosure and a large heat exchanger or cooling grid. Multiple white pipes and valves are connected to the system, suggesting it is part of a commercial or institutional building's climate control infrastructure. The system is mounted on a steel frame with mounting bolts, and the background shows a clear blue sky and some trees, indicating it is located in an area with vegetation. A "B4" notation is written in blue in the top right corner of the image, which could be a location or equipment identifier.
Other files for this federal contract opportunity
Other files attached to Chiller Maintenance Services, newest first.
File
Type
Posted
36C26125Q0691 0002.pdf
PDF
Aug 28, 2025
Site Visit Sign-in Sheet VA Palo Alto.pdf
PDF
Aug 27, 2025
S06 - 36C26125Q0691 0001.pdf
PDF
Aug 27, 2025
Site Visit Sign-in Sheet VA Livermore.pdf
PDF
Aug 27, 2025
Site Visit Sign-in Sheet VA Menlo Park.pdf
PDF
Aug 27, 2025
Attachment A - Inventory - Chillers- 8-27-25-.pdf
PDF
Aug 27, 2025
Attachment 41 - B101.jpg
JPG image
Aug 15, 2025
Attachment 28 - b100-5-front -Hybrid OR.jpg
JPG image
Aug 15, 2025
Attachment 35 - B370-A.jpg
JPG image
Aug 15, 2025
Attachment 40 - b334- water cooled.jpg
JPG image
Aug 15, 2025
Attachment 21 - B90-1.jpg
JPG image
Aug 15, 2025
Attachment 6 - 7-1a.jpg
JPG image
Aug 15, 2025
Attachment 24 - b100-2front.jpg
JPG image
Aug 15, 2025
Attachment 36 -ME-1.jpg
JPG image
Aug 15, 2025
Attachment 39 - b334-roof-2.jpg
JPG image
Aug 15, 2025
Attachment 37 - ME-2.jpg
JPG image
Aug 15, 2025
Attachment 30 - B101.jpg
JPG image
Aug 15, 2025
Attachment 12 - 615-3.jpg
JPG image
Aug 15, 2025
Attachment 43 - B331-1-B.jpg
JPG image
Aug 15, 2025
Attachment 5 - QASP- Chiller maintenance.pdf
PDF
Aug 15, 2025
Attachment 31 - B101.jpg
JPG image
Aug 15, 2025
Attachment 17 - B6-a.jpg
JPG image
Aug 15, 2025
Attachment 22 - B90-2.jpg
JPG image
Aug 15, 2025
Attachment 33 - b102-1 front.jpg
JPG image
Aug 15, 2025
Attachment 42 - B331-2-C.jpg
JPG image
Aug 15, 2025
Attachment 20 - b62.jpg
JPG image
Aug 15, 2025
Attachment 11 - 615-2.jpg
JPG image
Aug 15, 2025
Attachment 26 - b100-4A-backup.jpg
JPG image
Aug 15, 2025
Attachment 27 - b100-4B-backup.jpg
JPG image
Aug 15, 2025
Attachment 7 - 7-2a.jpg
JPG image
Aug 15, 2025
Attachment 23 - b100-1side.jpg
JPG image
Aug 15, 2025
Attachment 3 - WD 2015-5637 Rev 30.pdf
PDF
Aug 15, 2025
Attachment 4 - WD 2015-5623 Rev 27.pdf
PDF
Aug 15, 2025
S02 - 36C26125Q0691_1 Chiller Maint .pdf
PDF
Aug 15, 2025
Attachment 38 - b334-roof-1.jpg
JPG image
Aug 15, 2025
Attachment 29 - B100-G CCU3.jpg
JPG image
Aug 15, 2025
Attachment 13 - 615-4.jpg
JPG image
Aug 15, 2025
Attachment 25 - b100-3front.jpg
JPG image
Aug 15, 2025
Attachment 44 - B102-2.jpg
JPG image
Aug 15, 2025
Attachment 18 - b62.jpg
JPG image
Aug 15, 2025
Attachment 10 - 615-1.jpg
JPG image
Aug 15, 2025
Attachment 15 - b5-1.jpg
JPG image
Aug 15, 2025
Attachment 16 - b5-2.jpg
JPG image
Aug 15, 2025
Attachment 2 - WD 2015-5641 Rev 28.pdf
PDF
Aug 15, 2025
Attachment 1 - Inventory - Chillers.xlsx
XLSX spreadsheet
Aug 15, 2025
Show all 45
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Aug 15, 2025 .