Attachment 5_PPPL PQA Supplier Quality Survey_RFP 23-057-S.doc

DOC document 150 KB Posted

Attached to
Variable Phase Controller for the Neutral Beam High Voltage System
Solicitation number
RFP23-057-S
Issued by

About this file

This request for proposal seeks a qualified supplier to design, manufacture, and test a Variable Phase Controller for a neutral beam high voltage system at Princeton Plasma Physics Laboratory. The successful offeror will provide all materials and labor to install the controller in accordance with the specifications in the Statement of Work. Interested parties must have the capability to fulfill the requirements and submit a firm fixed-price proposal by the response deadline. The solicitation aims to award a subcontract to the responsible offeror judged to present the best value solution.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRINCETON PLASMA PHYSICS LABORATORY

PQA Supplier Quality Survey This survey is to be completed by the head of your Quality Department and returned to PPPL.

Please attach your organization chart that includes the Quality function and your Quality Manual.

Distributors – Please include your Traceability/Material Identification Procedure and your Trouble Reporting/Customer Notification procedure.

Note: navigate from field to field using the tab key or mouse.

Checklist Completed By
Date
Title
The survey need not be completed if you have completed one within the last 12 months and there have been no significant changes. If so, check here.
FORMCHECKBOX

Would you be receptive to a site survey visit?

If requested, would you be willing to supply specific quality procedures in the future?

GENERAL INFORMATION

Name of Facility
Years in Business under this Name
Division or subsidiary of:
Facility Address
City
State
Zip Code
-
Mailing Address
Phone
Zip Code
-
Principal Products/Services
Is this facility currently certified to any quality standards (ISO, ASME, etc.)? If so, please list them:

Identify the industry / national standard(s) that the quality system follows?

PERSONNEL

Head of Quality Dept.
Phone
e-mail
Reports to:
Production Manager
Phone
e-mail
Reports to:
Total No. of Personnel
Inspection/Test
Production
Administrative
QA/QC
Certified Welders

Capable of multiple shifts?

If YES, how many?
QUALITY SYSTEM
Yes
No
Comments

Is there a formal quality system in place?

Is there a written Quality Manual?

Are there regular, documented, Quality Program audits?

Is formal document control implemented for work instructions, procedures and drawings?

Is there a nonconformance system that includes identification, segregation, customer notification and concurrence, and action to prevent recurrence?

Is there a calibration program that requires national standards and includes tracking of status?

Are all measuring and test equipment used for final acceptance part of the calibration system?

What is the typical calibration period?

What is the longest calibration period?

Do all personnel receive quality program training?

Do Quality personnel review procurement documents?

Do Quality personnel witness inspections and tests?

Do Quality personnel witness special processes?

PURCHASED ITEMS
Yes
No
Comments

Are Quality personnel involved in contract review?

Is there a documented supplier qualification process?

Does supplier oversight include visits to supplier’s site?

Is there a rating system for supplier performance?

Are all incoming items/materials inspected?

Are incoming materials verified to be traceable to the associated certifications?

Is there a system of tagging or labeling material to maintain traceability?

Are receipt inspection results documented?

Are there controls to assure that unacceptable materials do not enter production?

Are materials controls in place to prevent damage/deterioration in storage?

Are age-sensitive items identified & controlled?

Please describe how counterfeit and mis-identified materials are kept out of your products.
ENGINEERING/DESIGN
Yes
No
Comments

Is there a system for documenting designs and design changes?

Is there a system for reviewing of designs and related design items, such as calculations, and documenting the review?

Are drawing and specification and their revisions reviewed for conformity to customer’s specifications?

Is there a system to control the development of software and to validate the final software to be delivered?

PROCESS CONTROLS
Yes
No
Comments

Are plans such as manufacturing, inspection, and test plan normally used?

Is an in-process tracking and identification system such as routing cards or travelers used?
FORMCHECKBOX

Who does in-process inspection?

Are written procedures or checklists used for in-process and tests?

Are records kept showing the acceptance, rejection, or disposal of material?

Are written procedures used for special processes & NDT?

How is inspection and test status indicated?

Are there up-to-date Preventive Maintenance schedules for production equipment?

FINAL INSPECTION & TESTS
Yes
No
Comments

Are written procedures used for final inspections & tests?

Is acceptance based on 100% inspection/test?

If sampling is used, does the customer pre-approve the method used?

If there is a default sampling method, what is it?

Is the organization performing final inspection and tests separate from production?

Does the Quality organization review acceptance procedures to ensure purchase order compliance?

Are records of results maintained?

OTHER

Are there other aspects of your Quality System that we should consider in evaluating your program (Customer approval/awards, lean manufacturing, 6-Sigma and/or process improvement programs, etc.)?

Please attach any supporting documentation helping to support the answers above. For example, certificates supporting certifications, a quality manual if available, special customer awards if appropriate.

Revision 8 02/8/2019

File details come from the government source that posted it. Updated .