Attachment 5 Past Performance Questionnaire.pdf
PDF 213 KB Posted
- Solicitation number
- SPE60221R0704
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 - PAST PERFORMANCE QUESTIONNAIRE
This attachment requires input from your provided Reference. Please ensure block 5-8 are completed by the Reference. This attachment can be sent directly to the Government by the Reference to BulkFuelsBidCustodian@dla.mil prior to the closing date of this solicitation. The subject line of the email correspondence must specify the solicitation number and the Offeror name to which this attachment is being submitted.
CONTRACT INFORMATION (Offeror to complete blocks 1-4)
1. Contractor Information:
CONTRACTOR NAME: CCR CAGE CODE:
ADDRESS: CCR DUNs NUMBER:
PHONE NUMBER:
EMAIL ADDRESS:
POINT OF CONTACT: CONTACT PHONE NUMBER:
2. Work Performed as: ______ Prime Contractor ______ Sub Contractor ______ Join Venture ______ Other (Explain)
If subcontractor, who was the prime (Name/Phone#):
3. Contract Information
Contract Number:
Contract Type: _________ Firm Fixed Price __________ Cost Reimbursement _________ Other (Please specify):
Contract Title:
mailto:BulkFuelsBidCustodian@dla.mil
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Contract Description:
Complexity of Work: ________ High ________ Med _________ Routine
How is this contract relevant to the requirement of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Reference to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the reference’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
Attachment 5 - PAST PERFORMANCE QUESTIONNAIRE Continued
EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Evaluation Definitions –
The following definitions should be used in the assessment of Contractor performance.
EXCEPTIONAL
Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.
VERY GOOD
Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.
SATISFACTORY
Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.
MARGINAL
Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.
UNSATISFACTORY
Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.
NOT APPLICABLE (N/A) Performance information not recent or relevant as defined in the Solicitation. Unable to provide assessment.
Evaluation Question 1.
Performance
What is your assessment of the Contractor’s ability to meet your requirements?
Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A
Performance
Comments, if any.
Questions 2 . Timeliness
What is your assessment of the Contractor’s ability to provide products in a timely manner?
Timeliness
Ability to Resolve Problems Timely
Question 3. Quality of Workload Management
What is your assessment of the Contractor’s ability to manage workload, produce quality deliverables and coordinate with subcontractors ( if any) to meet requirements of the applicable performance work statement?
Quality of Management
Question 4. Overall Rating of Contractor’s performance
What is your overall rating of Contractor’s performance (requirements, schedule) on contract being assessed?
Exceptional Very Good Satisfactory Marginal Unsatisfactory
General Comments:
| Evaluation Question 1. Performance |
| Question 3. Quality of Workload Management |
| Question 4. Overall Rating of Contractor’s performance |
| General Comments: |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Check Box11: Off |
| Check Box12: Off |
| Check Box14: Off |
| Text15: |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Text46: |
| Check Box47: Off |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Off |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Off |
| Text60: |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box65: Off |
| Check Box66: Off |
| Check Box67: Off |
| Text68: |
| Check Box69: Off |
| Check Box70: Off |
| Check Box71: Off |
| Check Box72: Off |
| Check Box73: Off |
| Text74: |
File details come from the government source that posted it. Updated .