Attachment 5-NIH Division 50 Construction Cost Template.xlsx

XLSX spreadsheet 221 KB Posted

Attached to
NIH MULTIPLE-AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION SERVICES
Solicitation number
75N99027R00002
Issued by

About this file

This is a construction cost template spreadsheet designed for the NIH Division 50 to support pricing proposals under the Multiple-Award Construction Contract (MACC) for General Construction Services solicitation (75N99027R00002). The template serves as a standardized tool for contractors to organize and present estimated construction costs for task orders and seed projects anticipated under this eight-year, $3 billion aggregate ceiling IDIQ contract vehicle.

The template functions as an appendix to the solicitation and provides the framework contractors must use when submitting cost proposals for individual construction requirements that will be competed among eligible MACC awardees. This pricing tool aligns with the firm-fixed-price basis anticipated for individual task orders issued under the multiple-award IDIQ contracts to be awarded by the Department of Health and Human Services, National Institutes of Health, Office of Acquisition and Logistics Management. The template ensures consistency in cost presentation across proposals and supports evaluation of pricing for general construction services including maintenance, repair, alterations, mechanical and electrical systems, HVAC, civil work, roofing, and building renovations to support the NIH Office of Research Facilities' ongoing construction and maintenance requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

SECTION B - PRICING SHEETS INSTRUCTIONS:
CSI DIVISION WORKSHEETS:
1CSI DIVISION WORKSHEETS ARE LINKED TO THE SUMMARY PAGE. ENTER THE PROJECT C NUMBER ON THE SUMMARY PAGE AND IT WILL POPULATE ALL THE SHEETS.
2USE 50 DIVISIONS OF CONSTRUCTION AS DEFINED BY CSI MASTERFORMAT
3CREATE A CSI DIVISION WORKSHEET FOR EACH DIVISION OF WORK REQUIRED TO COMPLETE THE PROJECT
4LIST EACH WORK ITEM TO BE PERFORMED BY THE PRIME AND ITS ASSOCIATED MATERIAL AND LABOR COSTS. (ADD ADDITIONAL ROWS AS NECESSARY).
5IDENTIFY EACH SUBCONTRACTOR, ENTERING SUBCONTRACTOR'S TOTAL MATERIAL AND LABOR COSTS.

BACKUP SHALL BE PROVIDED FOR EACH SUBCONTRACTOR. (PRIME CONTRACTOR MAY ELECT TO MODIFY THIS SPREADHSHEET TO PROIVDE SUBCONTRACTOR BACK-UP DETAIL SIMILAR TO PRIME CONTRACTOR'S DETAIL.)

6INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR OVERHEAD APPLIED TO SUBCONTRACTOR(S)
7INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR PROFIT APPLIED TO SUBCONTRACTOR(S)
8A TOTAL DIVISION COST WILL CALCULATE AS COST DATA IS ENTERED FOR PRIME COSTS, SUBCONTRACTOR(S) COSTS AND PERCENTAGE VAULES.
SUMMARY PAGE:.
9THE SUMMARY PAGE WORK ITEMS ARE LINKED TO A CORRESPONDING CSI DIVISION WORKSHEET.
10INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR OVERHEAD APPLIED TO PRIME WORK
11INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR PROFIT APPLIED TO PRIME WORK
12INSERT PRICE OF PREFORMANCE / PAYMENT BOND
13A TOTAL CONTRACT PRICE WILL CALCUALTE AS COST DATA IS POPULATED FROM LINKED CSI DIVISION WORKSHEETS.

SUMMARY

Work Request Number C112354 - Building 4 AHUs

TABLE B-1 -- PROPOSAL SUMMARY OF COSTS *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT

DIV. #:ITEM DESCRIPTION
(Use CSI Division Worksheet to back-up all pricing information for each Division listed in Table)(A)
MATERIALS(B)
LABOR(C) = (A) + (B)
SUBTOTAL COST(D)
SUBCONTRACTOR COSTS(E) = (C) + (D)

TOTAL COST

01GENERAL REQUIREMENTS$ - 0$ - 0$ - 0$ - 0$ - 0
2Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
3Concrete$ - 0$ - 0$ - 0$ - 0$ - 0
4Masonry$ - 0$ - 0$ - 0$ - 0$ - 0
5Metals$ - 0$ - 0$ - 0$ - 0$ - 0
6Wood, Plastics, and Composites$ - 0$ - 0$ - 0$ - 0$ - 0
7Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0$ - 0
8Openings$ - 0$ - 0$ - 0$ - 0$ - 0
9Finishes$ - 0$ - 0$ - 0$ - 0$ - 0
10Specialties$ - 0$ - 0$ - 0$ - 0$ - 0
11Equipment$ - 0$ - 0$ - 0$ - 0$ - 0
13Special Construction$ - 0$ - 0$ - 0$ - 0$ - 0
14Conveying Systems$ - 0$ - 0$ - 0$ - 0$ - 0
21Fire Suppression$ - 0$ - 0$ - 0$ - 0$ - 0
22Plumbing$ - 0$ - 0$ - 0$ - 0$ - 0
23HVAC$ - 0$ - 0$ - 0$ - 0$ - 0
25Integrated Automation$ - 0$ - 0$ - 0$ - 0$ - 0
26ELECTRICAL$ - 0$ - 0$ - 0$ - 0$ - 0
27Communications$ - 0$ - 0$ - 0$ - 0$ - 0
28Electrical Safety and Security$ - 0$ - 0$ - 0$ - 0$ - 0
31Earthwork$ - 0$ - 0$ - 0$ - 0$ - 0
32Exterior Improvements$ - 0$ - 0$ - 0$ - 0$ - 0
33Utilities$ - 0$ - 0$ - 0$ - 0$ - 0
34Transportation$ - 0$ - 0$ - 0$ - 0$ - 0

SUBTOTAL - 1: $ - 0 $ - 0 $ - 0

OVERHEAD (% * subtotal 1 (C)) : (INSERT %) 0% $ - 0

SUBTOTAL- 2 (subtotal 1 (C ) + overhead): $ - 0

PROFIT (% * subtotal 2): (INSERT %) 0% $ - 0

SUBTOTAL - 3 (subtotal 2 + profit): $ - 0

TOTAL SUBCONTRACTOR COSTS (subtotal 1 (D)): $ - 0

SUBTOTAL - 4 (subtotal 3 + total subcontractor costs): $ - 0

PERFORMANCE / PAYMENT BOND: $ - 0

TOTAL CONTRACT PRICE (subtotal 4 + bond): $ - 0

Attachment #5, NIH Division 50 Construction Cost Template FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION-SEE FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC) Seed Project Building 4 October 2026

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 1

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

01GENERAL REQUIREMENTS(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION-SEE FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC) Seed Project November 19, 2018

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 2

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

2Existing Conditions(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 3

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

3Concrete(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 4

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

4Masonry(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 5

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

5Metals(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 6

Work Request Number C112354 - Building 4 AHUs

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC)*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

6Wood, Plastics, and Composites(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION-SEE FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC) Seed Project November 19, 2018

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 7

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

7Thermal and Moisture Protection(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 8

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

8Openings(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 9

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

9Finishes(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 10

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

10Specialties(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 11

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

11Equipment(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 13

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

13Special Construction(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 14

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

14Conveying Systems(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 21

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

21Fire Suppression(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 22

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

22Plumbing(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P&P of &N

Division 23

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

23HVAC(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 25

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

25Integrated Automation(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 26

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

26ELECTRICAL(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 27

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

27Communications(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 28

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

28Electrical Safety and Security(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 31

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

31Earthwork(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 32

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

32Exterior Improvements(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 33

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

33Utilities(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 34

Work Request Number C112354 - Building 4 AHUs

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

34Transportation(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N image1.png image2.png

File details come from the government source that posted it. Updated .