This file is a Material Submittals Schedule for the Renovate BBEC Pressed Cafe Project (MAHG235001) at Keesler Air Force Base. The comprehensive document outlines required documentation and technical submittals across multiple construction and renovation categories, including hazardous materials reporting, project schedules, warranties, architectural elements, HVAC systems, electrical components, and testing reports.

The project involves a renovation valued between $250,000 and $500,000, with a 210-day performance period, funded by Non-Appropriated Funds (NAF). Key submission requirements span 56 line items covering areas such as masonry, carpentry, door hardware, gypsum board, tile work, painting, HVAC systems, refrigerant piping, electrical installations, fire alarm systems, and comprehensive operation and maintenance manuals. A mandatory site visit is scheduled for 20 May 2025 at 9:00 AM CST, with specific identification and vehicle documentation requirements for base access. The solicitation (FA301025R0012) is being competed as an unrestricted, full and open competition under the Department of the Air Force Air Education and Training Command.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG235001Project Title:
Renovate BBEC Pressed Café, B6732Solicitation / Contract Number:

Attachment 5

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1II. PHASE II CONSTRUCTION: (To be Verified and Updated by the A/E Per Design Requirements)
2HazMat Questionnaire
3HazMat MSDS
4HazMat Reporting Entry Form
5HazMat Reporting entry Form
6Recycling and Landfill Report
7Asbestos Abatement Report
8AF3065 Project Schedule and

Progress Reports

91-Year Warranty (Contractor's)
10
Masonry
10Rough Carpentry
11Finish Carpentry General
12Millwork
13Interior Architectural Woodwork
14Solid Surface Fabrications
15Insulation
16Exterior Insulation and Finish Systems
17Section 081113-Steel FramesNOT USED
17Joint Sealants
18Section 081113-Steel Frames
18Wood Doors
19Aluminum Doors and Frames
20Door Hardware
21Gypsum Board Assemblies
22Tile and Grout
23Acoustical Panel Ceilings
24Paint
25Stains and Transparent Finishes
26Section 090170-Repair of Exterior Insulation Finish System
27Section 062000-Finish Carpentry General
28Section 079200-Joint Sealants
29Section 081113-Steel Frames
30Section 082000-Wood Doors
31Section 084010-Aluminum Doors and Frames
33Section 085800-Aluminum Sliding Windows
34Section 092550-Gypsum Board Assemblies
35Section 093013-Tile and Grout
36Section 093050-Tile Setting Materials and Accessories
37Section 095110-Acoustical Panel Ceilings
38Section 096500-Resilient and LVT Flooring
39Section 099100-Paint
40Section 099323-Stains and Transparent Finishes
41Section 123600-Countertops
42Section 099000-Painting and Coating
26Wall Protection
27Entrance Floor Mats and Frames
28Mini-Split AC Set
29HVAC RECT, RECT duct & fittings …

Low Pressure

30HVAC RECT, RND GREASE duct & fittings … Low Pressure
31HVAC Duct Insulation
32MAU HW & CHW Coil Paks
33HVAC duct accessories

volume/control/back-draft dampers, SA diffusers, RA grilles, OA & EA Louvers, Smoke Filter

34HW Piping, Fittings, & Valves
35Potable HFW & CFW Piping,

Fittings, & Valves

36Drain & Vent Piping, Fittings (PVC)
37HW and HFW Piping Insulation
38Mini-Split AC Unit

Refrigerant Piping

39Refrigerant Piping Insulation
40HVAC Control

VAV box damper set, Exhaust Hood Fan & FP/Alarm System, OA Make-Up Unit Fan, HW & CHW Coils, OA & EA Dampers, OA & EA filter DP sense/alarm

41
42Drain & Vent System

Gravity Leak Test

43HW System P-Test Report
44HW System

Balance / Op Test Report 45 Potable HFW & CFW System P-Test Report 46 Potable Water System Disinfection Test & Analyze

47CHW System P-Test Report
48CHW System

Balance / Op Test Report 49 HVAC Air Balance Test AHU 1, B6732 1st Floor TU1-7A VAV Box Set SA, RA in corridor RA Dining Areas 50 HVAC Air Balance Test Exhaust Hood, OA Make-Up Unit, 1st Floor 51 Exhaust Hood FP & Alarm System Op Test Report 52 Electrical Power Cable, Conduit, Receptacles, Breakers, Panels, Safety Switch, Controllers 53 Electrical Lighting Cable, Conduit, P-Devices, Fixtures

54Fire Alarm Items
55Operation & Maintenance Manuals
56Warranty (Manufacturer's)

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).