Attachment 4 - MAHG235001 Renovate BBEC Pressed Cafe B6732_Design MSS-Design - Appx C.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Pressed Cafe Renovation at Keesler AFB
Solicitation number
FA301025R0012
Issued by

About this file

This document is a Material Submittals Schedule (MSS) for the Renovate BBEC Pressed Cafe project at Keesler Air Force Base. The file outlines a comprehensive design submission process with multiple phases: Design Start, 35% Design, 65% Design, 95% Design, and 100% Design. Each phase requires specific submittals including drawings, specifications, design analysis, updated cost estimates, project schedules, and design review meeting documentation.

The project, numbered MAHG235001, is a renovation valued between $250,000 and $500,000, with a 210-day performance period. It will be funded by Non-Appropriated Funds (NAF) and is being competed as an unrestricted, full and open competition solicitation (FA301025R0012). A mandatory site visit is scheduled for 20 May 2025 at 9:00 AM CST, with strict access requirements including valid identification, vehicle registration, and proof of insurance. The project is managed by the Department of the Air Force Air Education and Training Command and will involve detailed design submissions and reviews throughout the project lifecycle.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG235001Project Title:
RENOVATE BBEC PRESSED CAFÉ, B6732Solicitation / Contract Number: FA301025R0013
Line Number(To be completed by Project Architect/Engineer)(To be completed by Contract Administrator)
Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1I. PHASE I DESIGN:
2A. DESIGN START
31. Initial Contract Project Schedule (AF Form 3064)5 Days Prior to Design Kickoff
42. Design Kickoff - Minutes to the Meeting3 Days Following NTP
53. Updated Contract Project Schedule (Real Time) (AF Form 3064)3 Days Following NTP
6B. 35% DESIGN
71. Drawings
8a. COA #1
9b. COA #2
102.Outline Specifications
113. Updated Cost Estimate (Class 5 for each COA)
124. Contract Project Schedule (AF Form 3064)
135. MSS Submittal Log Listing Proposed Construction Submittals
146. Materials and Finishes for Selection, Color BoardXX
157. Design Review Meeting Minutes5 Days Following DRM
168. Design Review (DRM) Comment Matrix5 Days Following DRM
17
18C. 65% DESIGN
191. Drawings
202. Specifications
3. Design Analysis
214. Updated Cost Estimate (Detailed Cost Estimate based on RS Means (Material/Labor/Equipment )Break down cost. Do not list lump sum (LS).
225. Updated Contract Project Schedule (AF Form 3064)
236. MSS Submittal Log Listing Proposed Construction Submittals
247. Design Review Meeting Minutes5 Days Following DRM
258. Design Review Comment Matrix5 Days Following DRM
26
27D. 95% Design
281. Drawings
292. Specifications
3. Design Analysis
304. Updated Cost Estimate (Detailed Cost Estimate based on RS Means (Material/Labor/Equipment )Break down cost. Do not list lump sum (LS).
315. Updated Contract Project Schedule (AF Form 3064)
326. MSS Submittal Log Listing Proposed Construction Submittals
337. Design Review Meeting Minutes5 Days Following DRM
348. Design Review Comment Matrix5 Days Following DRM
35
36E. 100% design
371. Drawings (11"x17" Signed & Sealed)
2. Drawings (22"x32"" Signed & Sealed)
383. Specifications
394. Design Analysis
405. Updated Cost Estimate (Detailed Cost Estimate based on RS Means (Material/Labor/Equipment )Break down cost. Do not list lump sum (LS).
406. Updated Contract Project Schedule (AF Form 3064)
417. MSS Submittal Log Listing Proposed Construction Submittals

&"Verdana,Bold"&12Schedule of Material Submittals &12APPENDIX C

&P of &N