This is a Subcontracting Percentage Worksheet issued by the U.S. Department of the Interior for calculating compliance with FAR Clause 52.219-14, Limitations of Subcontracting. The worksheet is a template designed to determine whether a prime contractor's subcontracting costs exceed allowable thresholds under federal contracting regulations.
The worksheet requires prime contractors to input and calculate direct labor costs, fringe benefits, and General and Administrative (G&A) costs for both the prime contractor and any subcontractors. The calculation methodology involves adding direct labor and fringe benefits to establish a subtotal, then applying the appropriate G&A rate to derive total labor costs. The subcontracting labor cost percentage is computed using the formula: (D) / (C) + (D), where (D) represents the subcontractor's total labor costs and (C) represents the prime contractor's total labor costs. The worksheet includes three critical notes: labor overhead must be allowable under FAR 31.205-6(m) or it will be eliminated entirely from calculations; if subcontractor cost breakdowns are unavailable, the total subcontracting amount should be used for comparison purposes while still maintaining a breakdown of contractor costs; and G&A denotes General and Administrative Costs. This template is used to ensure prime contractors comply with federal limitations on the percentage of work that may be subcontracted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR: SOURCE:
SUBCONTRACTOR: SOURCE:
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUB TOTAL (A) $ (B) $
LABOR G&A**@______% $ $
TOTAL LABOR COSTS (C) $ (D) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)** in space (B).
Next, Calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = %
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m). Failure to do so will csuse the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractos’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.