This file is a consolidated Questions and Answers document for federal solicitation 140R4026R0021, issued by the Bureau of Reclamation on November 19, 2026. The document addresses inquiries from potential quoters regarding an IDIQ contract for Hydrologic Database (HDB) support services. The solicitation is set aside as a 100% Total Small Business set-aside under NAICS 541511 and is anticipated to be awarded on February 25, 2027, with performance running through February 24, 2032.

The contract requires ongoing support for HDB database systems, including corrective maintenance, emergency technical support with two-hour response time requirements for urgent calls outside normal business hours, and development work. The incumbent contractor is Precision Water Resources Engineering under task order 140R8125F0096 (IDIQ 140R8121D0002). The Government receives approximately 5–10 new support tickets monthly, with 15 currently open tickets exceeding one-month age; urgent calls outside normal hours are a new category with no historical baseline. Reclamation will provide government-furnished equipment and VPN access for remote performance. The contract specifies five labor categories—Principal, Project Manager, Senior Data Scientist, Data Scientist, and Junior Data Scientist—with estimated base-year hours of 168, 312, 1,080, 360, and 480 respectively (2,400 total); emergency support is estimated at 235 hours annually. The guaranteed IDIQ minimum is $10,000 with a contract ceiling of $2,600,000; individual orders are limited to $200,000 maximum. All contractor personnel require Public Trust background investigation and PIV credentialing for system access. Performance is primarily remote, with on-site work limited to the annual HDB User Group meeting (approximately two days) or when authorized. The Government will provide HDB source code, documentation, and access to production and test environments upon award, though no fixed transition period or incumbent handoff guarantee is specified. Period of performance dates were clarified as February 25, 2027–February 24, 2028 (base year) through February 25, 2031–February 24, 2032 (Option Year 4). The document addresses numerous clarifications regarding pricing schedule entries, page limits for technical and administrative volumes, qualifications requirements, relevant experience evaluation criteria, and subcontracting and teaming partner eligibility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HDB Solicitation 140R4026R0021

HDB Solicitation — Questions and Answers Solicitation No. 140R4026R0021 | Consolidated responses | November 19, 2026

Questions and Answers

1. Is there an incumbent contractor, and the current contract number.

Answer: The incumbent contractor is Precision Water Resources Engineering (PWRE).

Current HDB support is provided under task order 140R8125F0096, issued under IDIQ 140R8121D0002.

2. Historical or estimated volume: average monthly support calls, urgent calls, and hours of development work per year.

Answer: Detailed historical call and development-hour records are not available.

Reclamation receives approximately 5–10 new support tickets monthly. Urgent calls are a new category, so no historical urgent-call counts exist. Attachment 3 provides estimated labor hours for pricing and evaluation.

3. Will the HDB source code, documentation and a test environment will be made available to the awardee during transition, and what transition period is expected.

Answer: The Government will provide HDB source code, documentation, and access to its test environment upon award. No fixed transition period or incumbent-to-awardee handoff is guaranteed.

4. Will the Government provide VPN access and government-furnished equipment for remote work, or expects contractor-furnished equipment.

Answer: Yes. Reclamation will provide Government-furnished equipment and VPN access for remote performance.

5. Will relevant experience on comparable Oracle database and time-series data systems will be considered if it is not specific to HDB.

Answer: Yes. Comparable Oracle database, hydrologic time-series, and operational-data systems experience is acceptable under Subfactor 1C. Quoters must also demonstrate the ability to meet the full HDB PWS.

8. Are the current HDB source code and documentation available to quoters before the due date, and if so, where?

Answer: No. No additional HDB documentation or source code will be provided before the quotation deadline.

9. Attachment 3 lists five labor categories. May a quoter propose the same fully burdened rate for more than one category, and may one qualified person perform hours under more than one category?

Answer: Yes. A quoter may propose the same fully burdened hourly rate for multiple labor categories. A qualified individual may perform work in more than one category when the individual meets the applicable qualifications and the hours are charged to the category of work actually performed. The same hours may not be billed twice.

11. The solicitation incorporates 52.222-41, Service Contract Labor Standards, but no wage determination is attached. Which wage determination applies, or are the labor categories expected to be exempt?

Answer: No wage determination is incorporated as part of this solicitation or into the contract. 52.222-41 has been removed from the solicitation.

12. Attachment 3 shows the base year as 01/20/2027 to 01/19/2028, while Section F shows 02/25/2027 to 02/24/2028. Which dates should quoters use?

Answer: Use February 25, 2027–February 24, 2028 for the base period. Amendment A0001 aligns Attachment 3 and the solicitation with the February 25–February 24 contract periods.

13. In Attachment 3, the year totals in row 23 add the travel and materials Price cells, such as C18 and C20. The Government's not-to-exceed amounts sit in the Hours column, such as E18 and E20. Should quoters copy the not-to-exceed amounts into the Price cells so the totals include them?

Answer: No. Do not change the Government-established NTE amounts. Enter proposed travel and materials/ODC prices in the applicable Price cells, at or below the Government NTE amounts. The period totals use the contractor-entered prices, not the full Government NTE values automatically.

14. For Subfactor 1B, may a quoter identify a position it will fill by hiring before the start of performance, and provide the person's name and qualifications at that time?

Answer: Yes. A quoter may propose a position to be filled before performance begins, but the quotation must demonstrate the proposed individual’s qualifications, availability at the start of performance, and a letter of commitment. Qualifications furnished only after award will not satisfy the quotation requirement.

16. What background investigation level applies to contractor personnel who support HDB remotely?

Answer: A Public Trust background investigation is required for the Government-issued credentials, equipment, and system access necessary to perform the work.

17. Is 25 February 2027 a firm target for award? Does Reclamation plan to issue the first task order together with the award, and what start date should the awardee plan for?

Answer: February 25, 2027 is the anticipated award date, not a guaranteed award or task-order start date. The Government does not guarantee that a task order will be issued at IDIQ award. Work may begin only after a task order authorizes it.

18. FAR 52.216-22 refers to a contract minimum, but the solicitation does not state an amount. What is the guaranteed minimum for this IDIQ?

Answer: The guaranteed IDIQ minimum is $10,000 and the maximum is $200,000. The IDIQ contract ceiling is $2,600,000, as identified in the solicitation’s ordering limitations. $200,000 amount is the maximum for a single-item order under FAR 52.216-19(b)(1); it is not the overall IDIQ ceiling of $2,600,000.

19. For Subfactor 1C, may a quoter describe recent projects performed by its proposed personnel, including work done for a prior employer, and list that employer's reference contact?

Answer: Yes. A proposed individual’s experience with a prior employer may be submitted if the quotation includes that individual’s letter of commitment to work with the firm if they receive the award. Without the letter, that individual’s experience will not be accepted.

21. Past Performance Requirements: How many past performance references are required, and what is the required recency period? Should the references cover the past three years or five years?

Answer: Follow Section L, Factor 2, for Past Performance submissions. No additional minimum reference count or three- or five-year recency requirement applies.

25. Attachment 3 identifies labor categories including Principal, Project Manager, Senior Data Scientist, Data Scientist, and Junior Data Scientist. May offerors propose personnel specializing in Oracle database administration, HDB applications, and software engineering under the corresponding categories, provided all required qualifications are covered?

Answer: Yes. Oracle database administrators, HDB specialists, and software engineers may be proposed under the established Attachment 3 categories. The team must satisfy PWS Section 3.1, and each individual must be qualified for assigned work.

26. The Attachment 3 heading for Option Year 3 identifies CLINs 00013–00015, while the solicitation schedule includes CLIN 00016. Will a corrected pricing workbook be issued?

Answer: Yes. Attachment 3 has been corrected to identify Option Year 3 as CLINs 00013– 00016, including Materials/ODC CLIN 00016.

27. Could you confirm the overall minimum guarantee and maximum contract value for the single-award IDIQ? Are the labor hours in Attachment 3 strictly evaluation quantities or intended to represent anticipated ordering limits?

Answer: The IDIQ guaranteed minimum is $10,000 and the contract ceiling is $2,600,000 (see Question 18). Attachment 3 labor hours are estimates for evaluation only; they are not guaranteed orders or contract-wide ordering limits.

29. The RFQ states performance is "primarily remote" and that travel or on-site work occurs only when authorized by the Contracting Officer or a task order. Apart from the annual HDB User Group meeting (about two days), does the Government expect any recurring on-site presence? Where is the User Group meeting normally held?

Answer: No recurring on-site presence is required beyond participation in the annual HDB User Group meeting when authorized. The meeting location varies, generally within the 17 Reclamation states. Additional on-site visits require Government authorization.

30. How will contractor personnel access the HDB production and test/development environments remotely? Specifically: a. Will the Government furnish laptops or other equipment, or is contractor-furnished equipment over VPN or a virtual desktop expected?

b. Will remote personnel need a DOI Access Card (PIV)? If so, does card issuance require an in-person visit to a Reclamation office, and would that visit be reimbursed under the Travel CLIN? c. What background investigation level applies to these positions?

Answer: (a) Reclamation will furnish equipment and VPN access. (b) Network access requires a PIV card obtained through an in-person DOI credentialing appointment; credentialing travel is reimbursable with prior approval. (c) A Public Trust background investigation is required.

33. PWS Section 3.1.1 requires a "high level of knowledge" of the HDB database structure, DECODES and the Computation Processor, and Subfactor 1B asks quoters to show these qualifications "at the start of performance." Is prior hands-on HDB experience a minimum requirement for award? Or will the Government consider a team with strong Oracle, time-series data and software maintenance experience that presents a defined plan to gain HDB-specific knowledge during transition?

Answer: No. Prior contract performance on HDB is not a separate award prerequisite.

Comparable Oracle, time-series, and operational-data experience is acceptable, but the proposed team must demonstrate the HDB knowledge and skills required by PWS Section 3.1 at the start of performance.

34. For Subfactor 1C (Relevant Experience) and Factor 2 (Past Performance), may quoters present production systems they designed and operate for their own business, where there is no separate customer reference? If so, what information should replace the customer name and reference contact?

Answer: Yes, for Relevant Experience: identify system ownership, operating history, complexity, results, and independently verifiable evidence. For Past Performance, a self-reference does not replace an independent customer reference. A quoter without relevant contract past performance will receive neither favorable nor unfavorable treatment.

39. The FFP CLIN prices are calculated as fixed hourly rates multiplied by Government-provided hours (2,400 hours per year across five categories). Will each year's FFP support task order be issued for these hours at the awarded rates? How will on-call work beyond those hours be ordered: under the Emergency Labor-Hour CLIN (235 hours per year) or by a separate task order?

Answer: The 2,400 regular-support hours and 235 emergency hours per year are evaluation estimates, not guaranteed orders. Each task order establishes the authorized scope, price, hours, and ceiling. Emergency or additional on-call work must be separately authorized under an applicable labor-hour/T&M line or task order.

40. The PWS requires urgent calls outside normal business hours to be answered within two hours. How often have after-hours urgent calls occurred historically? Is after-hours time billed under the Emergency Labor-Hour CLIN or included in the FFP price?

Answer: No historical after-hours urgent-call counts are available. Urgent calls outside normal hours require direct technical engagement within two hours. Authorized after-hours emergency work is charged to the applicable emergency labor-hour CLIN; standby time and work beyond task-order authorization are not separately billable.

41. Section G lists kgoddard@usbr.gov, but the RFQ cover pages direct quotations and questions to kyle_goddard@ios.doi.gov. Please confirm the address for quotations, and any maximum email or attachment size.

Answer: Submit quotations and solicitation questions to kyle_goddard@ios.doi.gov. Section G has been corrected by Amendment A0001. The RFQ specifies no separate email or attachment-size limit.

42. The Section L quotation-organization table is hard to read in the PDF. Please confirm the page limits for each part, including the Administrative/Responsibility volume. It appears the limits are 10 pages for Technical, 10 for Past Performance and 10 for Administrative, with no limit on the pricing workbook. Please also confirm whether a cover page or table of contents counts toward these limits.

Answer: The page limit for Part I (Technical) has been increased from 10 to 20 pages, for Part II (Past Performance) the limit is 10 pages, and for Part IV (Administrative/Responsibility) the page limit is 10. Cover pages, tables of contents, resumes, and any letters of commitment count toward these limits. The signed SF 1449 and Attachment 5 do not count. Part III requires one complete Attachment 3 Excel workbook and has no page limit. All other material submitted within the applicable quotation volume, including cover letters, acronym lists, compliance matrices, appendices, and signed subcontracting or teaming/partnership commitments, counts toward that volume’s page limit. See Question 193 for the quotation formatting specifications.

46. During transition, will the Government provide HDB source code, system documentation, and access to a non-production environment? Are Oracle database licenses Government-furnished?

Answer: Upon award, the Government will provide access to the HDB production and non-production/test environments, HDB source code and system documentation, and Government-furnished Oracle licenses and equipment.

48. What is the relative importance of Factor 1 (Technical), Factor 2 (Past Performance) and Factor 3 (Price), and of Technical subfactors 1A through 1E?

Answer: Factors 1 (Technical Capability) and 2 (Past Performance) are equally important;

when combined, they are more important than Factor 3 (Price). Technical Subfactors 1A–1E have no separate stated relative weighting. Section M was updated by this amendment.

52. The solicitation states that quotes are valid for 120 days, while FAR 52.212-1(b) states 60 days. Which period applies?

Answer: The RFQ requires a 120-calendar-day quotation acceptance period. That period controls over the standard 60-day language in FAR 52.212-1(b).

53. Will current HDB task orders end at award of this IDIQ, and can the Government share current workload figures (for example, urgent calls per month and open malfunctions) to inform the Subfactor 1D transition approach?

Answer: Award of this IDIQ will not automatically terminate existing task orders. Current expirations are Upper Colorado: December 2026 (extension to February 2027 under consideration); Eastern Colorado/Albuquerque: April 2027; and Lower Colorado: June 2027.

The Government receives approximately 5–10 new tickets monthly; 15 tickets have been open for more than one month. No historical urgent-call series exists.

55. Please identify the HDB instances in scope and their current Oracle versions.

Answer: Separate HDB instances support the four Upper Colorado Basin area offices;

Boulder Canyon Operations and Yuma; Eastern Colorado; and the Lahontan and Klamath Basin area offices. All identified instances currently use Oracle 19c.

63. Source-code baseline. Is the current HDB source code baseline (database scripts, stored procedures and packages, Computation Processor algorithms, loaders) held in a Government-controlled repository that will be furnished at award? Is any portion owned or licensed by the current contractor?

Answer: The Government owns HDB and has access to the source-code repositories and baseline materials. The awardee will receive access to these materials for transition under the contract.

65. Access. Will contractor personnel need DOI PIV credentials and background investigations before they access HDB systems? What is the typical lead time from award to network and test-environment access?

Answer: HDB system access requires a PIV card and Public Trust background investigation.

PIV issuance requires an in-person DOI credentialing appointment. Access is provided after the required forms, screening, and credentialing are completed; there is no fixed provisioning lead time.

66. RiverWare. For PWS 5.1.5 support of HDB-to-RiverWare connections, will the Government provide RiverWare licenses for contractor testing, or is that support limited to the HDB side of the data management interface?

Answer: Support is limited to the HDB side of the HDB–RiverWare data-management interface. RiverWare licenses are not required for this work.

68. Will the evaluation accept past performance from a proposed subcontractor or teaming partner when the small business prime has not supported HDB before?

Answer: Yes. Relevant work performed by proposed subcontractors or key personnel may be submitted as supporting experience or past performance. Please provide letters of commitment that those you identified will work with your firm if awarded to you. Identify the performing entity or individual and its proposed role; do not present that experience as the prime quoter’s own contract performance. For each proposed subcontractor or teaming/partnership firm whose experience is used, provide a signed subcontracting commitment or signed teaming/partnership commitment identifying the firm and its proposed role. See Question 88 for signed individual letters of commitment.

69. Can the Government provide anticipated annual labor hours or level-of-effort estimates by labor category?

Answer: Attachment 3 provides annual pricing/evaluation quantities by category. Base-year hours are Principal 168, Project Manager 312, Senior Data Scientist 1,080, Data Scientist 360, and Junior Data Scientist 480 (2,400 total); Emergency HDB support is 235 hours. The option-year category mix changes in Attachment 3, although annual FFP hours remain 2,400.

71. Can the Government provide additional information regarding the incumbent staffing structure and current labor categories, if releasable?

Answer: Attachment 3 provides the available labor categories and estimated hours for this acquisition. No separate historical incumbent staffing breakdown will be provided.

75. Are subcontractors permitted to perform substantial portions of the required work, subject to applicable limitations on subcontracting and other contract requirements?

Answer: Yes. Subcontracting is permitted and performance is subject to FAR 52.219-14.

76. Does the Government anticipate dedicated full-time staffing for all labor categories, or may personnel be assigned based on workload and task-order requirements?

Answer: No. Five separate full-time employees are not required. Personnel may be assigned based on task-order workload, provided the team meets PWS Section 3.1, required availability and response times, and all task-order requirements.

77. Will proposed personnel resumes, certifications, and relevant HDB/Oracle experience be evaluated as part of the technical proposal?

Answer: Yes. Resumes, certifications, and relevant HDB/Oracle experience will be considered under Technical Capability. Include required letters of commitment for proposed personnel.

79. Does the Government anticipate opportunities for improvements to HDB architecture, Oracle database performance, hydrologic data integration, GIS capabilities, and automated data-quality monitoring?

Answer: Yes. The PWS permits authorized HDB enhancements, database improvements, integration, data quality, APIs, and related development. Specific initiatives will be performed only when included in an issued task order; no separate upgrade program is guaranteed.

80. What performance metrics will be used to evaluate the contractor's technical performance and service delivery?

Answer: The QASP and PWS Section 7 govern surveillance. Key minimums include: urgent calls answered through direct technical engagement within two hours at any time; all non-urgent calls no later than the next business day; reported malfunctions resolved within four business days absent extenuating circumstances; at least 90% timely acceptable task-order deliverables and reports; 95% of data-tool tasks on time; and cybersecurity compliance/corrective-action timeframes stated in the PWS/QASP. The COR will use monthly reviews, records, customer feedback, and performance measures.

82. Are contractor personnel required to be U.S. citizens, or may legally authorized non- U.S. citizens perform services under this contract?

Answer: U.S. citizenship is not a blanket requirement; however, all personnel must meet the requirements to legally work in the United States and meet all applicable suitability and access requirements.

86. For urgent technical support requests requiring a response within two hours, does the Government expect dedicated 24/7 on-call coverage? Please clarify whether the two-hour requirement is for acknowledgment, technical engagement, or initiation of corrective action.

Answer: The contractor must provide qualified technical engagement within two hours of any urgent after-hours call. Acknowledgment alone does not satisfy the requirement. A continuously staffed 24/7 shift is not prescribed, but coverage must meet the two-hour response standard at all times.

88. Are resumes required for any or all proposed labor categories at the time of proposal submission? If so, please clarify resume page limits, required content, and whether letters of commitment are mandatory.

Answer: A resume is required for each proposed team member under Subfactor 1B, and resumes count toward the 20-page Technical Capability limit. A letter of commitment is required for proposed personnel whose availability depends on that commitment. Required individual letters of commitment must be signed and confirm the proposed person’s role and availability at the start of performance. These letters count toward the 20-page Technical Capability limit.

89. Please confirm the deadline for submission of written questions and the anticipated date of the Government's Q&A response.

Answer: Written questions closed November 12, 2026, at 5:00 p.m. Mountain Time.

Consolidated Government answers are issued with this Amendment A0001. Quotations are due November 30, 2026, at 5:00 p.m. Mountain Time.

90. Attachment 3 (Pricing Schedule) specifies Not-to-Exceed hours per CLIN. Please confirm whether the NTE hours listed represent the ceiling per contract period (i.e., per base year and per each option year independently), or whether they represent a cumulative ceiling across the full contract vehicle.

Answer: Attachment 3 labor hours are annual evaluation quantities for each contract period, not cumulative contract ceilings or guaranteed order quantities. Actual authorized hours and ceilings are stated in each task order.

92. The Pricing Schedule includes an Other Direct Costs (ODC) CLIN for travel and materials. Please confirm whether on-site travel expenses — including transportation, lodging, and per diem — are to be billed as actuals under the ODC CLIN at prevailing GSA per diem rates, or whether such costs are expected to be embedded within the proposed labor rates.

Answer: On-site travel expenses are to be billed as actuals under the ODC CLIN at prevailing GSA per diem rates. No travel is authorized without CO or task-order approval.

94. Will offerors be required to identify specific Key Personnel by name in their proposals?

If so, which labor categories does the Government consider Key Personnel, and does the Government intend to include a substitution clause?

Answer: Section L, Subfactor 1B requires the proposed team’s identities, qualifications, and availability at the start of performance. The solicitation does not identify separate Key Personnel positions or establish a special key-personnel substitution clause.

96. Does the Bureau of Reclamation have government technical staff (FTEs) who currently support or contribute to HDB operations alongside the contractor? If so, what is the level of collaboration expected anticipated between government personnel, the contractor, and any other parties? Will the awardee be expected to work collaboratively with government technical staff on day-to-day HDB activities?

Answer: The Government has no FTEs assigned to HDB technical support; Government personnel support operations and network functions. The contractor will coordinate with designated technical personnel and participating offices, including monthly status meetings.

101. Page limits. Are a cover page and the signed SF 1449 excluded from the 10-page limits?

Given the one-email, four-attachment instruction, please confirm the signed SF 1449, the Attachment 5 Limitations of Subcontracting worksheet and amendment acknowledgments belong in the Administrative / Responsibility Information PDF.

Answer: Include the signed SF 1449, completed Attachment 5, and required amendment acknowledgments in the Administrative/Responsibility submission. The SF 1449, required amendment acknowledgements and Attachment 5 do not count toward quotation page limits.

Please note that the page limit of Factor 1 has changed from 10 pages to 20 pages.

103. Environment. How many HDB instances are in production today, and what Oracle Database and Red Hat Enterprise Linux versions do they run? Is a migration or version upgrade anticipated during the ordering period?

Answer: All identified HDB instances use Oracle 19c. Most Reclamation servers use RHEL 9, some use RHEL 10, and RHEL 8 is being phased out. The contractor must support updates to Government-approved secure versions for the instances listed in PWS Section 1.2.

104. Workload history. Can the Government share the approximate annual number of urgent and non-urgent calls, and the number of task orders issued per year under the predecessor contract 140R8121D0002?

Answer: Four HDB task orders are active: 140R8125F0096, 140R3026P0031, 140R6026F0025, and 140R4026F0031. They cover Upper Colorado, Lower Colorado, Eastern Colorado, and Albuquerque. Urgent and non-urgent incidents were not historically tracked separately; Attachment 3 provides estimated hours.

106. Limitations on subcontracting. Is the Attachment 5 worksheet required with the quotation, or only at the task-order level?

Answer: Yes. A completed Attachment 5, Limitations on Subcontracting, is required with the quotation.

124. The Limitations on Subcontracting worksheet names one subcontractor in its header.

If a quotation involves more than one subcontractor, should additional subcontractors be listed in an attachment to the worksheet, with the percentage calculated across all subcontractor labor costs combined?

Answer: Fill out a separate worksheet for each subcontractor with it’s own percentage calculation. The 1st worksheet we see should be the consolidated percentage calculation of all subcontracting work vs. the prime. State that it is a consolidated percentage on that 1st page.

134. Is the incumbent eligible to submit a quote under this 100% Total Small Business set-aside?

Answer: Yes. The incumbent may submit a quote if it meets the NAICS 541511 small-business size standard and all other RFQ eligibility requirements. Incumbent status does not provide an exception to these requirements.

135. What is the current FTE count supporting HDB, and how is it distributed across labor categories?

Answer: The predecessor IDIQs used flat-rate FFP pricing rather than the current five labor categories. No comparable incumbent category-by-category FTE breakdown is available.

Government staff support operations and networks, not HDB technical support.

143. Does the Government anticipate the contractor and their resources to have access to classified material? Please clarify if a Personal and/or Facility Clearance Level will be required.

Answer: No classified information or facility clearance is required. Contractor personnel must complete the PIV credentialing and applicable background investigation processes for Government network access.

144. Please clarify whether the 30- and 90-day cybersecurity periods begin on finding issuance, publication, or contractor notification. Does submitting a risk-acceptance request within 90 days satisfy the requirement while a Government decision is pending, and what constitutes acceptable evidence of corrective action within 30 days?

Answer: The 30- and 90-day corrective-action periods begin when the finding is officially issued to the contractor. A complete, timely risk-acceptance request submitted within 90 days satisfies the submission requirement while the Government reviews it. Acceptable 30-day evidence includes remediation plans, completed actions, screenshots, change records, tickets, or comparable proof of progress.

146. Does the Government anticipate that contractor personnel will be required to reside or be physically located within specific Bureau of Reclamation regions or near designated regional offices? Alternatively, may the contractor propose a geographically dispersed, remote workforce capable of supporting all required locations? Please identify any positions or services requiring routine on-site presence.

Answer: No geographic residency restriction is imposed. Performance is primarily remote, and on-site work or travel is required only when authorized by the CO or a task order. All response and performance standards remain applicable.

147. The RFQ requires active SAM registration before the due date, and Part IV asks for a CAGE Code. For a small business whose registration is submitted and in process, would the Government consider either a short extension or accepting a quote with the CAGE Code to follow before award?

Answer: As written, the RFQ requires an active SAM registration by the quotation deadline;

however, a quote with a CAGE code will be accepted. The apparent awardee must be fully active in SAM before award.

156. Please specify the exact production and development Oracle RDBMS versions (e.g., Oracle 19c Enterprise vs. Standard Edition 2, or planned Oracle 23ai upgrade), Red Hat Enterprise Linux (RHEL) / Oracle Linux kernel releases, and whether HDB instances run on-premises within Reclamation data centers or inside DOI cloud environments.

Answer: All HDB instances are hosted at Reclamation facilities, not DOI cloud environments.

Oracle 19c is used throughout. Most servers run RHEL 9, some run RHEL 10, and RHEL 8 is being phased out. No separate Oracle edition or Oracle 23ai upgrade has been identified for this acquisition.

157. Approximately how many custom HDB Data Exchange and Computation Applications (DecApps), Perl/Python scripts, C/C++ binaries, Java modules, and Oracle PL/SQL stored procedures are currently active in production, and is modernized Python/REST/OpenAPI refactoring desired during routine maintenance Task Orders?

Answer: The Government has no verified production counts for DecApps, scripts, binaries, Java modules, or PL/SQL procedures to provide. No specific Python/REST/OpenAPI modernization roadmap is included in this requirement.

158. What data-exchange protocols and authentication mechanisms currently govern real-time telemetry ingestion between HDB and CADSWES RiverWare, USACE CWMS/HEC- DSS, USGS NWIS REST APIs, and GOES/Hydromet satellite data collection platforms?

Answer: HDB–RiverWare integration uses Oracle SQL*Net with account credentials and public/private-key encryption. USGS NWIS uses read-only HTTP/HTTPS REST APIs without authentication. GOES/Hydromet uses LRGS servers over TCP/IP with password-based, hashed credentials. No documented transport/authentication specification is available for USACE CWMS/HEC-DSS interfaces.

161. Will the Government evaluate commercial enterprise relational database (Oracle/PostgreSQL/SQL Server), C++/Python/Java time-series ETL, and automated schema-reconciliation engagements on an equal footing with federal prime contracts under FAR 15.305(a)(2)(iv), and publish an interested-vendor teaming list to facilitate Small Business Prime/Subcontractor partnerships under FAR 52.219-14?

Answer: Yes. Relevant commercial-sector projects are evaluated under the solicitation’s stated Technical and Past Performance criteria. Federal prime-contract status is not a requirement. Interested vendors may use the SAM.gov interested-vendors list; the Government will not publish a separate list.

164. Emergency Support and Standby Costs. The PWS requires urgent support within two hours, including after hours, while Attachment 3 lists 235 emergency support hours annually. Do these hours cover only authorized emergency work performed, or do they also compensate for standby availability? If standby is not separately billable, should its cost be included in the fully burdened regular-support rates?

Answer: The 235 emergency hours are evaluation estimates for authorized emergency work, not paid standby time. Standby is not separately compensable; quoters may include the cost of after-hours availability in proposed fully burdened rates if they wish to do so.

175. Attachment 3 Pricing Schedule: The Row 23 annual total formulas reference the Travel and Materials/ODC Price cells (currently blank/$0) instead of the Government-provided NTE allowances, causing those amounts to be excluded from the annual totals.

Additionally, Cells C6 and S18 are blank, and Cell O2 references CLINs 00013-00015 instead of 00013-00016. Will the Government issue a corrected pricing workbook, or should quoters populate the Travel and Materials/ODC Price cells with the Government-provided NTE amounts to ensure the Total Evaluated Price includes these allowances?

Answer: Attachment 3 uses Government NTE amounts as maximums for travel and materials/ODC. Quoters must enter their own proposed amounts in each Price cell, including Option Year 4 cell S18; those entered amounts flow into the period and total evaluated prices.

Cell C6 is the Project Manager rate input. The Option Year 3 heading identifies CLINs 00013– 00016.

179. Emergency Support CLIN Pricing: Attachment 3 requests a single fully burdened hourly rate for the Emergency HDB IT Support Services CLIN. Please confirm that quoters should propose a single blended/composite rate rather than labor-category-specific rates.

Answer: Yes. Enter one fully burdened blended hourly rate for Emergency HDB IT Support Services in each contract period, not separate emergency rates for the five regular-support labor categories.

180. Relevant Experience vs. Past Performance: May quoters use the same three contracts for both Subfactor 1C (Relevant Experience) and Factor 2 (Past Performance), with the former addressing technical relevance and the latter addressing performance quality and outcomes?

Answer: Yes. The same projects may be used for Subfactor 1C and Factor 2.

181. Attachment 5 (Limitations on Subcontracting): If a Small Business quoter intends to self-perform 100% of the work, should Attachment 5 still be submitted showing 0% subcontracting, or is a written certification of full self-performance sufficient?

Answer: Yes. Even when proposing 100% self-performance, submit Attachment 5 showing 0% subcontracting.

186. Task orders and participating offices. Will a task order be issued at award? Will each participating office issue its own task orders, or will one consolidated task order be issued each year (Attachment 1, page 10, PWS 6.3 and 6.4)? Which offices expect to order in the base year? Also, the HDB website cited in Attachment 1, page 3, PWS 2.1 (hydrodb.net) lists the Truckee River Operating Agreement and a Pacific Northwest area office as HDB users, but Attachment 1, page 1, PWS 1.2 does not name them. Are those instances in scope?

Answer: No task order is guaranteed at IDIQ award. The Government plans to issue authorized orders after award as needs arise; participating offices may issue separate task orders. Four current orders cover seven HDB instances. The Truckee River Operating Agreement instance is outside scope; Klamath Basin and Lahontan are currently supported under the Upper Colorado task order.

187. Contract types. Attachment 1, page 10, PWS 6.2 states that "it is anticipated that all task orders will be firm-fixed price." Other documents provide for non-FFP work:

Solicitation, page 19 (Section H, "Mixed FFP and T&M/LH Ordering") permits time-and-materials and labor-hour (T&M/LH) task orders. Attachment 3, row 13, has a Labor-Hour CLIN (Emergency HDB IT Support Services). Attachment 3, rows 18 and 20 have Time-and- Materials CLINs for travel and materials. Please confirm that T&M/LH task orders are permitted.

Answer: Yes. The IDIQ permits FFP task orders and limited authorized T&M/LH task orders or line items. PWS Section 6.2 states that FFP is anticipated, not exclusive. Each T&M/LH authorization must comply with the contract and applicable ordering requirements.

188. FFP CLIN billing. Solicitation, pages 6 to 11 (Schedule, CLINs 00001, 00005, 00009, 00013, 00017) label HDB IT Support Services a firm-fixed-price CLIN. However: Attachment 3, rows 5 to 9, prices it as hourly rates times "Hours - Not to Exceed." Attachment 1, page 5 (PWS Section 4, Hours of Availability) states that "only time spent performing authorized work is billable." Will FFP task orders be invoiced as a fixed periodic amount, or by hours actually worked up to the not-to-exceed hours?

Answer: Only authorized work actually performed is billable. Attachment 3 hours and rates establish evaluated pricing; individual task orders control the FFP amount, work authorization, and any applicable hours or ceilings.

189. Emergency CLIN scope. Which work should be billed to the Emergency HDB IT Support Services Labor-Hour CLIN (Solicitation, pages 6 to 11, CLINs 00002, 00006, 00010, 00014, 00018; Attachment 3, row 13) rather than the FFP CLIN? For example, is it limited to urgent calls received outside normal operating hours, as defined in Attachment 1, page 4 (PWS 3.3) and page 5 (PWS Section 4)? Is a single blended rate intended for all labor categories?

Answer: Emergency HDB IT Support Services covers urgent calls received outside normal operating hours. Quote one blended fully burdened emergency hourly rate for each contract period.

191. Pricing assumptions. Solicitation, page 36 (Section L, Part III) asks for "pricing assumptions or supporting information." The submission table on Solicitation, page 3 and page 34 ("Quote Organization") limits Part III to the Excel workbook. Where should assumptions be placed (for example, a separate sheet in the workbook or Part IV), and do they count against a page limit?

Answer: The separate pricing-assumptions requirement has been removed by Amendment A0001. Part III consists of one completed Attachment 3 Excel workbook.

193. Page limits and formatting. Solicitation, pages 3 and 34 set 10-page limits for Parts I, II, and IV. Do those limits include cover pages, tables of contents, résumés, and letters of commitment? Are there font size, margin, or page size requirements?

Answer: Part I Technical Capability is limited to 20 pages; Parts II and IV are each limited to 10 pages. Cover pages, tables of contents, resumes, and signed letters of commitment count toward those limits. The signed SF 1449, acknowledgement of amendments, and Attachment 5 do not count. Formatting information is as follows: 8.5 x 11 Page Size, Single Spaced, Font Size 12 Times New Roman, 1” margins around the entire page. Information has been added to the solicitation.

195. Relevant experience versus past performance. Solicitation, page 35 (Section L, Subfactor 1C) asks for up to three relevant projects with customer contacts in Part I. Part II on the same page asks for past performance on similar efforts. May the same projects appear in both, and may Part I refer to Part II for contract details to save space?

Answer: Yes. A project may be used for both Relevant Experience and Past Performance, and cross-volume references are acceptable. Each part must still address its own evaluation criteria.

199. HDB website and knowledge base. Attachment 1, page 8, PWS 5.3.8 requires downloads "on the HDB website." Attachment 1, page 3, PWS 2.1 cites hydrodb.net, a non-government domain whose site names no operator. Who owns and hosts that site? Will the contractor be given access to maintain it, and is it expected to remain the official distribution point? For the knowledge base in Attachment 1, page 8, PWS 5.3.7, will Reclamation provide the "secure, centralized location," or must the contractor host it?

Answer: Much of the material formerly on hydrodb.net is now maintained on a Government intranet. The awardee is not required to maintain hydrodb.net or host the internal knowledge-base repository. The Government intranet remains the distribution point for user updates.

203. Firm-fixed-price CLIN. Attachment 3 prices this CLIN as fully burdened rates times Government NTE hours (for example, 168 hours for Principal and 1,080 for Senior Data Scientist in the base year). Are those hours for evaluation only, and not a guaranteed level of effort? How will FFP task orders be priced if actual scope or hours differ? Are the proposed rates ceiling rates for task orders?

Answer: Attachment 3 labor hours are evaluation estimates, not guaranteed work. Each issued task order establishes the authorized labor mix. Yes, the stated hours are ceilings for each year. If the Government sees that we are closing in on the ceiling, a modification may be considered.

Duplicate Questions — Cross-References

6. Is this requirement a follow-on to an existing contract? If so, could you share the current contract number and the labor hours used in the most recent year?

Answer: See responses to Questions 1 and 2.

7. Will Reclamation give the awardee access to the HDB source code, installation scripts, schema documentation and a test environment during transition? And is there a transition period between award on February 25th 2027 and the start of on-call support obligations?

Answer: See response to Question 3.

10. Roughly how many urgent calls outside normal business hours has Reclamation logged per year under the current support arrangement?

Answer: See response to Question 2.

15. Will Reclamation arrange a transition with the current contractor, and give the new contractor access to the HDB source code, documentation and test environment before 25 February 2027?

Answer: See response to Question 3.

20. Incumbent Information: Could you please share the incumbent contractor's name and any relevant contract details?

Answer: See response to Question 1.

22. PWS 3.1.1 calls for a high level of knowledge of the HDB database structure, including DECODES and the Computational Processor, and PWS 5.3.7 calls for a transferable knowledge base structured to onboard future contractor staff. The RFQ anticipates award on 25 February 2027, the same date performance begins. Will the Government furnish the existing HDB knowledge base, source code, database scripts and configuration documentation to the awardee, and is a transition or orientation period contemplated?

Answer: See response to Question 3.

23. Attachment 3 captions the base year 01/20/2027 to 01/19/2028, while Section B states 02/25/2027 to 02/24/2028. Which period should quoters price to?

Answer: See response to Question 12.

24. The primary solicitation identifies the performance period as February 25, 2027 through February 24, 2032, while Attachment 3 and the ordering guide use January 20, 2027 through January 19, 2032. Which dates should govern the quotation and pricing schedule?

Answer: See response to Question 12.

28. For technical evaluation purposes, may the offeror identify qualified personnel committed to join the contractor contingent upon award, provided their qualifications and availability at the start of performance are documented?

Answer: See response to Question 14.

31. Is this a follow-on to an existing contract? If so, please provide the current contract number, the incumbent contractor, and the historical hours or annual value of the HDB support work.

Answer: See responses to Questions 1 and 2.

32. The anticipated award date (February 25, 2027) is the same as the start of the period of performance. Will there be a transition or knowledge-transfer period with the current contractor, and will the Government give the new contractor access to the existing HDB knowledge base, source code and documentation at the start of performance?

Answer: See response to Question 3.

35. May one qualified individual be proposed under more than one labor category in Attachment 3 (for example, Principal and Project Manager)? Are there minimum education or experience requirements for each labor category? The pricing workbook lists the categories but the RFQ does not describe them.

Answer: See responses to Questions 9, 25 and 33.

36. Attachment 3 shows contract periods starting 01/20/2027 and ending 01/19/2032. The SF 1449 and Section F show 02/25/2027 through 02/24/2032. Please confirm which periods apply.

Answer: See response to Question 12.

37. For the Travel and Materials/ODC CLINs, the Government's not-to-exceed amounts appear in the "Hours - Not to Exceed" column (for example, $5,800 travel and $4,000 materials in the base year). The period totals add the "Price" column instead. Should quoters enter the Government's NTE amounts in the "Price" column, so they carry into the period totals?

Answer: See response to Question 13.

38. In Option Year 4, the Travel row has no "Price" input cell, but the Option Year 4 total formula refers to that cell. Please confirm how Option Year 4 travel should be entered.

Answer: See responses to Questions 13 and 175.

43. Please identify the incumbent contractor and current contract number for HDB support, and the approximate number of hours actually used per year under the current contract.

Answer: See responses to Questions 1 and 2.

44. Attachment 3 (Pricing Schedule) shows the Base Year as 01/20/2027 - 01/19/2028, while the RFQ states a period of performance of February 25, 2027 through February 24, 2032.

Which dates govern for pricing?

Answer: See response to Question 12.

45. Attachment 3 numbers Option Year 3 CLINs 00013-00015 and Option Year 4 CLINs 00017-00020. Is a CLIN (00016) missing from Option Year 3, or is the numbering a typographical error?

Answer: See response to Question 26.

47. What background investigation or PIV level applies to personnel performing fully remote work, and will remote access be through Government-furnished equipment or contractor equipment?

Answer: See responses to Questions 16 and 30.

49. In Attachment 3 (Pricing Schedule), each year's total adds cells C18 and C20, which hold 0, rather than the government-set travel and materials/ODC amounts in E18 and E20.

Should offerors correct the formula, or will the Government issue a corrected schedule?

Answer: See response to Question 13.

50. The solicitation states a period of performance of 02/25/2027 to 02/24/2032, while the Ordering Guide (Attachment 4) and Attachment 3 state 01/20/2027 to 01/19/2032. Which dates govern?

Answer: See response to Question 12.

51. FAR 52.222-41 (Service Contract Labor Standards) is incorporated, but no wage determination is attached. Does the Service Contract Labor Standards statute apply to this requirement, and if so, which wage determination?

Answer: See response to Question 11.

54. The SF 1449 lists the period of performance as February 25, 2027 to February 24, 2032, while Attachment 3 lists January 20, 2027 to January 19, 2032. Which dates should quoters use?

Answer: See response to Question 12.

56. Is there an incumbent contract, and will transition time with the incumbent be provided?

Answer: See responses to Questions 1 and 3.

57. Will contractor staff access Reclamation test and production environments through government-furnished equipment or through a VPN on contractor equipment?

Answer: See response to Question 4.

58. Do resumes count toward the 10-page limit for the Technical Capability Quotation?

Answer: See responses to Questions 42 and 88.

59. Period of performance. Section F gives the base period as 02/25/2027–02/24/2028. The Attachment 3 workbook headers give 01/20/2027–01/19/2028. Which dates govern?

Answer: See response to Question 12.

60. Labor categories. Attachment 3 prices five categories (Principal, Project Manager, Senior Data Scientist, Data Scientist, Junior Data Scientist), but the PWS defines qualifications only for the team as a whole (PWS 3.1). Will the Government publish category descriptions or minimum qualifications? If not, may the quoter define each category in its quotation?

Answer: See response to Question 25.

61. One person in several categories. May one qualified individual perform work under more than one labor category, billed at the rate for the category of work performed?

Answer: See response to Question 9.

62. Historical workload. Are the Attachment 3 evaluation hours (about 2,400 per year, plus 235 emergency labor-hours) representative of recent actual use? Can the Government share approximate recent annual call volumes, urgent-call counts, and the number of HDB instances supported?

Answer: See responses to Questions 2, 39 and 55.

64. Transition. Will there be any transition overlap with the incumbent, or a Government-led knowledge-transfer session, after award?

Answer: See response to Question 3.

67. The solicitation states the period of performance as "February 25, 2027 through February 24, 2032", while Attachment 3, Pricing Schedule, heads its columns "Base Year 01/20/2027 - 01/19/2028" through "Option Year 4 01/20/2031 - 01/19/2032". Which dates should offerors use for the base and option years when pricing Attachment 3?

Answer: See response to Question 12.

70. Are there specific Oracle database administration, Hydrologic Database (HDB), GIS, or hydrologic data management qualifications required for key technical personnel?

Answer: See responses to Questions 25 and 33.

72. Does the Government anticipate a formal transition period, and what transition activities will the incoming contractor be expected to perform?

Answer: See response to Question 3.

73. Will contractor personnel be permitted to perform services remotely, either fully or partially, subject to applicable security and operational requirements?

Answ…