Attachment_5_-_Lim_on_SubK_Breakout.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
RFO Fire Engine Storage Structure Replacement, UT Federal contract opportunity
Solicitation number
140L0625B0009
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This file is a Limitations on Subcontracting Breakout template for a small business set-aside contract for a Fire Engine Storage Structure Replacement project in Utah. The solicitation (140L0625B0009) is issued by the Department of the Interior's Bureau of Land Management with a 120-day performance period after notice to proceed. The template requires contractors to track and demonstrate compliance with subcontracting limitations, specifically mandating 15% self-performance and providing a detailed breakdown of labor costs, material costs, and subcontractor payments.

The template includes sections for tracking total proposed amount, material costs, self-performed labor, small business subcontractor labor, large business subcontractor labor, and calculating the limitation on subcontracting percentage. Subcontractors must be first-tier and qualify as small businesses under the solicitation's North American Industry Classification System (NAICS) code. The document emphasizes that to be compliant, the limitation percentage must be greater than the required self-performance percentage, ensuring meaningful participation of the prime contractor in the project's execution.

View the file

Other files for this federal contract opportunity

Other files attached to RFO Fire Engine Storage Structure Replacement, UT, newest first.
File Type Posted
Sol_140L0625B0009_Amd_0002.pdf PDF
Attachment_9_-_SF_1409__Abstract_of_Offers_0002.pdf PDF
Attachment_6_-_Site_Visit_Sign-In_Sheet_0001.pdf PDF
Attachment_7_-_Sol_QA_140L0625B0009_0001.pdf PDF
Sol_140L0625B0009_Amd_0001.pdf PDF
Attachment_8_-_Revised_M1_0_Mechanical_Plan_0001.pdf PDF
Attachment_4_-_Bid_Schedule_140L0625B0009.pdf PDF
Attachment_1_-_Specifications.pdf PDF
Attachment_2_-_Plans.pdf PDF
Attachment_3_-_DOL_Wage_Determination_UT20250080.pdf PDF
Sol_140L0625B0009.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0625B0009 - Fire Engine Storage Structure Replacement, UT
Type of Set-AsideSmall Business
Performance Period120 Days after NTP
Required Self-Performance15%

(A) Total Amount Proposed¹

(B) Total Material Cost2

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor3
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost4 $0.00

(G) Limitation on Subcontracting Percentage5
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost
*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.
*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 4: Total labor costs consist of all contractual costs other than material.
*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .