Attachment 5_Latchways Components Fall Protection.pdf
PDF 1 MB Posted
- Attached to
- DCF FALL ARREST SYSTEMS MAINTENANCE, INSPECTION, AND TRAINING SERVICES Federal contract opportunity
- Solicitation number
- 2031ZA26Q00151
About this file
This document is a product specification and system layout guide for Latchways Fall Protection systems manufactured by Unistrut International Corporation's Fall Protection Division. The document serves as a technical reference rather than a solicitation or procurement document.
The guide presents two typical system configurations for fall protection cable systems. System 1 is designed for removable transfasteners and includes the following components: swage and clevis unit, swage slip indicators, D rings, hangers, cable, L/H threaded swage, turnbuckle body, and H-Xtenda shock absorber with right-hand thread. System 2 is configured for standard transfasteners and incorporates an entry terminal to allow workers to attach and detach from the system. The document provides detailed photographs and descriptions of key system components: the D-ring and hanger assembly supports the cable while allowing transfasteners to rotate freely for continuous protection; the swage and clevis unit creates cable terminations; swage slip indicators display gaps that signal system damage; entry terminals facilitate attachment points for standard transfasteners; turnbuckles and toggles enable cable tensioning with visual confirmation of proper pre-tension; the H-Xtenda shock absorber limits end loads during falls and shows operational status through visual indicators (perfect condition, slightly deployed, excessively deployed, or fully deployed); and transfasteners provide continuous attachment to the system with various configurations available based on application requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4_75D-07.0-04 EHS Contractor Requirements.pdf | ||
| RFQ_2031ZA26Q00151_DCF_Fall_Arrest.pdf | ||
| Attachment 2_Monthly Workforce Report_PostAward Contract Deliverable.xlsx | XLSX spreadsheet | |
| Attachment 7_Frequently Asked Questions and Answers 2031ZA26Q00151.pdf | ||
| Attachment 1_ Initial Staffing Plan_Proposal Deliverable.xlsx | XLSX spreadsheet | |
| Attachment 3 _TCSC APU 26-01 Operational Acquisition Procedures 2-12-2026 FINAL.pdf | ||
| Attachment 6_Service Contract Labor Standards Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
International Corporation
Fall Protection Division
BUREAU OF ENGRAVING
TYPICAL SYSTEM LAYOUT
TYPICAL SYSTEM LAYOUT CONT…
STANDARD D-RING & HANGAR
SWAGE AND CLEVIS UNIT
SWAGE SLIP INDICATOR
ENTRY TERMINAL
TURNBUCKLE & TOGGLE
H-XTENDA
TRANSFASTENERS
File details come from the government source that posted it. Updated .