Attachment 5 - IH Implementation Plan.pdf
PDF 728 KB Posted
- Solicitation number
- SP3300-23-Q-0012
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document includes an implementation plan and solicitation for industrial hygiene and ergonomic program support services. The Defense Logistics Agency Distribution in San Joaquin, California is seeking these services to conduct industrial hygiene assessments and evaluations across various operations and facilities. Assessments are prioritized and include evaluating noise exposure, ventilation of local exhaust, personal protective equipment, material safety data sheets, and other occupational health and safety issues. Services will involve assessing over 30 different locations and operations such as police indoor firing ranges, unitized group ration processes, preservation and packing work, equipment maintenance, waste water treatment, and material handling equipment. The solicitation number is SP3300-23-Q-0012 and responsive proposals are due by the specified closing date and time.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE LOGISTICS AGENCY
SAN JOAQUIN
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 1
Police Indoor Firing Range Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Gun Range Qualification All
Noise Evaluation {1} Occupational Safety and Health Inspection {1}
Cross Draft Ventilation (1)
Location: T-30, Sec 2 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Unitized Group Rations (UGR)
Mission
Mechanical Box Erector & Mechanical
Box Sealer Noise Evaluation {2}
UGR Process PPE Evaluation {3}
Location: T-57, Sec 1 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Pack and Mark Mechanical Saws Local Exhaust Ventilation Observation {3}
Noise Evaluation {2}
Preservation & Packing
Glove Box Bead Blasting
PPE Evaluation {3}
Noise Evaluation {3}
Preservation Process Preservation Oil Evaluation {3} PPE Evaluation {3}
RFQ SP3300-23-Q-0012
Attachment 5 - IH Implementation Plan
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 2
Location: T-13 & Area Z Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Warehousing Rip Saws Local Exhaust Ventilation Observation {3} Noise Evaluation {2} PPE Evaluation {3}
Area Y Storage & Wood and Metal Mechanical Saws
Reel O’ Matic: PPE Evaluation {3}
Mechanical Box Stitching
Noise Evaluation {2} PPE Evaluation {3}
Stock Handling (Preservation Oils)
PPE Evaluation {3}
Location: T-14 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Warehousing Rip Saws and Oil Lubricating Saws
Exhaust Ventilation Observation {3} Noise Evaluation {2} PPE Evaluation {3}
Location:T-16 B5 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Bin Packing Sortation Noise Evaluation {3}
Mechanical Box Stitching
Noise Evaluation {2} PPE Evaluation {3}
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 3
Location: T-22, Sec 1 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Box Shop All
Local Exhaust Ventilation Evaluation {1} Noise Evaluation {2} PPE Evaluation {3}
BZ Air Sampling {2} MSDS Reviews {3}
Location: T-28 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Hazardous Material:
Storage, Packing and Shipping, &
Recoup
Packing and Shipping
Cross Draft Ventilation Evaluation {1}
PPE Evaluation {3}
Recoup Local Exhaust Ventilation Evaluation {1}
PPE Evaluation {3}
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 4
Locations: T-200 and T-201
Operation Processes IH Assessments {Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Equipment Maintenance
Welding
Noise Evaluation {2} PPE Evaluation {3} BZ Air Sampling {2} Local Exhaust {1}
Ventilation Evaluation {1} MSDS Evaluation {3}
Tool (Machine) Shop Noise Evaluation {2} PPE Evaluation {3}
Glove Box Blasting Noise Evaluation {2} PPE Evaluation {3}
Paint Booth
Mechanical Ventilation Evaluation {1} PPE Evaluation {3}
Noise Evaluation {2} MSDS Evaluation {3} BZ Air Sampling {2}
Grade D Air Sampling {1}
Location: T-201 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Vehicle Maintenance
Parts Washing, Oil and Grease
Dispensing, Tire Changing (Tire
Press, and Bead Seaters)
Annual Occupational Safety and Health Inspection {1}
Noise Evaluation {2}
PPE Evaluation {3}
MSDS Evaluations {3}
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 5
Location: T-231, T-232, T-236, T-237 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Facility Maintenance
Various Facility Processes
Annual Occupational Safety and Health Inspection {1}
Noise Evaluations {2} PPE Evaluations {3}
MSDS Evaluations {3}
Location: T-235
Operation Processes IH Assessments {Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
DLA Fire Department
Various Facility Processes (Tracy)
Noise Evaluations {2} PPE Evaluations {3}
Bay Exhaust Ventilation Surveys {1} NFPA Required Quarterly Compressed Breathing Air
Testing {1}
Location: T-238 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Pest Control All Local Exhaust Evaluation {1}
Noise Evaluations {2} PPE Evaluations {2}
Chemical Handling Process Evaluations {2} MSDS Evaluations {2}
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 6
Location: T-246 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Waste Water Treatment Plant
Various Facility Processes
Annual Occupational Safety and Health Inspections of the Sharpe and Tracy Waste Water
Treatment Plants {1}
Location: T-250 Vehicles Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
High Voltage Equipment
Storage & Two Vehicles
High Voltage Equipment Storage
Occupational Safety and Health Inspection {1} PPE Evaluation {1}
Two Vehicles Occupational Safety and Health Inspection {1} PPE Evaluation {1}
Location: T-38 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Pharmacy & Hazardous
Material Recoup All
PPE Evaluations {3}
MSDS Evaluations {3}
Warehouse T-06 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Hazardous Material Storage &
Property Reutilization
All Occupational Safety and Health Inspection
INDUSTRIAL HYGIENE IMPLEMENTATION PLAN
p. 7
Location: All Tracy Locations Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Material Handling Equipment (MHE) for 5-K and 15-K Propane Fueled
MHE
Various MHE Operations
Carbon Monoxide Testing for all MHE at Tracy & Sharpe {1}
Noise Evaluation {3}
PPE Evaluation {3}
Truck Gate Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Police Services Sentry Inspections of Trucks and POV
Noise Evaluation {2} PPE Evaluation {3}
Location: T-19, Section 1 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Ozone-Depleting Substance (ODS)
Transfer
Various Facility Processes
Annual Occupational Safety and Health Inspection {1}
Noise Evaluations {2} PPE Evaluations {3}
MSDS Evaluations {3}
Location: T-16, Section B-3 Operation Processes IH Assessments
{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}
Mechanized Bin Receiving
Distribution Processing
Noise Evaluation {2} PPE Evaluation {3}
File details come from the government source that posted it. Updated .