Attachment 5 - IH Implementation Plan.pdf

PDF 728 KB Posted

Attached to
Industrial Hygiene (IH) and Ergonomic Program Support Services For Defense Logistics Agency (DLA) Distribution, San Joaquin, CA (DDJC)
Solicitation number
SP3300-23-Q-0012
Issued by

About this file

This document includes an implementation plan and solicitation for industrial hygiene and ergonomic program support services. The Defense Logistics Agency Distribution in San Joaquin, California is seeking these services to conduct industrial hygiene assessments and evaluations across various operations and facilities. Assessments are prioritized and include evaluating noise exposure, ventilation of local exhaust, personal protective equipment, material safety data sheets, and other occupational health and safety issues. Services will involve assessing over 30 different locations and operations such as police indoor firing ranges, unitized group ration processes, preservation and packing work, equipment maintenance, waste water treatment, and material handling equipment. The solicitation number is SP3300-23-Q-0012 and responsive proposals are due by the specified closing date and time.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

SAN JOAQUIN

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 1

Police Indoor Firing Range Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Gun Range Qualification All

Noise Evaluation {1} Occupational Safety and Health Inspection {1}

Cross Draft Ventilation (1)

Location: T-30, Sec 2 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Unitized Group Rations (UGR)

Mission

Mechanical Box Erector & Mechanical

Box Sealer Noise Evaluation {2}

UGR Process PPE Evaluation {3}

Location: T-57, Sec 1 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Pack and Mark Mechanical Saws Local Exhaust Ventilation Observation {3}

Noise Evaluation {2}

Preservation & Packing

Glove Box Bead Blasting

PPE Evaluation {3}

Noise Evaluation {3}

Preservation Process Preservation Oil Evaluation {3} PPE Evaluation {3}

RFQ SP3300-23-Q-0012

Attachment 5 - IH Implementation Plan

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 2

Location: T-13 & Area Z Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Warehousing Rip Saws Local Exhaust Ventilation Observation {3} Noise Evaluation {2} PPE Evaluation {3}

Area Y Storage & Wood and Metal Mechanical Saws

Reel O’ Matic: PPE Evaluation {3}

Mechanical Box Stitching

Noise Evaluation {2} PPE Evaluation {3}

Stock Handling (Preservation Oils)

PPE Evaluation {3}

Location: T-14 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Warehousing Rip Saws and Oil Lubricating Saws

Exhaust Ventilation Observation {3} Noise Evaluation {2} PPE Evaluation {3}

Location:T-16 B5 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Bin Packing Sortation Noise Evaluation {3}

Mechanical Box Stitching

Noise Evaluation {2} PPE Evaluation {3}

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 3

Location: T-22, Sec 1 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Box Shop All

Local Exhaust Ventilation Evaluation {1} Noise Evaluation {2} PPE Evaluation {3}

BZ Air Sampling {2} MSDS Reviews {3}

Location: T-28 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Hazardous Material:

Storage, Packing and Shipping, &

Recoup

Packing and Shipping

Cross Draft Ventilation Evaluation {1}

PPE Evaluation {3}

Recoup Local Exhaust Ventilation Evaluation {1}

PPE Evaluation {3}

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 4

Locations: T-200 and T-201

Operation Processes IH Assessments {Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Equipment Maintenance

Welding

Noise Evaluation {2} PPE Evaluation {3} BZ Air Sampling {2} Local Exhaust {1}

Ventilation Evaluation {1} MSDS Evaluation {3}

Tool (Machine) Shop Noise Evaluation {2} PPE Evaluation {3}

Glove Box Blasting Noise Evaluation {2} PPE Evaluation {3}

Paint Booth

Mechanical Ventilation Evaluation {1} PPE Evaluation {3}

Noise Evaluation {2} MSDS Evaluation {3} BZ Air Sampling {2}

Grade D Air Sampling {1}

Location: T-201 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Vehicle Maintenance

Parts Washing, Oil and Grease

Dispensing, Tire Changing (Tire

Press, and Bead Seaters)

Annual Occupational Safety and Health Inspection {1}

Noise Evaluation {2}

PPE Evaluation {3}

MSDS Evaluations {3}

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 5

Location: T-231, T-232, T-236, T-237 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Facility Maintenance

Various Facility Processes

Annual Occupational Safety and Health Inspection {1}

Noise Evaluations {2} PPE Evaluations {3}

MSDS Evaluations {3}

Location: T-235

Operation Processes IH Assessments {Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

DLA Fire Department

Various Facility Processes (Tracy)

Noise Evaluations {2} PPE Evaluations {3}

Bay Exhaust Ventilation Surveys {1} NFPA Required Quarterly Compressed Breathing Air

Testing {1}

Location: T-238 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Pest Control All Local Exhaust Evaluation {1}

Noise Evaluations {2} PPE Evaluations {2}

Chemical Handling Process Evaluations {2} MSDS Evaluations {2}

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 6

Location: T-246 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Waste Water Treatment Plant

Various Facility Processes

Annual Occupational Safety and Health Inspections of the Sharpe and Tracy Waste Water

Treatment Plants {1}

Location: T-250 Vehicles Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

High Voltage Equipment

Storage & Two Vehicles

High Voltage Equipment Storage

Occupational Safety and Health Inspection {1} PPE Evaluation {1}

Two Vehicles Occupational Safety and Health Inspection {1} PPE Evaluation {1}

Location: T-38 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Pharmacy & Hazardous

Material Recoup All

PPE Evaluations {3}

MSDS Evaluations {3}

Warehouse T-06 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Hazardous Material Storage &

Property Reutilization

All Occupational Safety and Health Inspection

INDUSTRIAL HYGIENE IMPLEMENTATION PLAN

p. 7

Location: All Tracy Locations Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Material Handling Equipment (MHE) for 5-K and 15-K Propane Fueled

MHE

Various MHE Operations

Carbon Monoxide Testing for all MHE at Tracy & Sharpe {1}

Noise Evaluation {3}

PPE Evaluation {3}

Truck Gate Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Police Services Sentry Inspections of Trucks and POV

Noise Evaluation {2} PPE Evaluation {3}

Location: T-19, Section 1 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Ozone-Depleting Substance (ODS)

Transfer

Various Facility Processes

Annual Occupational Safety and Health Inspection {1}

Noise Evaluations {2} PPE Evaluations {3}

MSDS Evaluations {3}

Location: T-16, Section B-3 Operation Processes IH Assessments

{Priority Level: 1 = Critical, 2 = Primary, 3 = Secondary}

Mechanized Bin Receiving

Distribution Processing

Noise Evaluation {2} PPE Evaluation {3}

File details come from the government source that posted it. Updated .