Attachment 5- Floor Plan.pdf

PDF 714 KB Posted

Attached to
317 AW Vindicator Alarm System for Bldg. 6015
Solicitation number
FA4661Q0152
Issued by

About this file

This document contains a detailed floor plan for a renovation project at the 317th Headquarters Building 6015 on Dyess Air Force Base. The floor plan includes notes on changes to room configurations, wall and ceiling construction, flooring, and other architectural details.

The related federal contract opportunity is for the installation of a Vindicator intrusion detection system in Room 109 of Building 6015. The 317th Air Wing is requesting the removal of the existing alarm system and installation of the new Vindicator system to secure classified information in the restricted access area. Contractors are asked to provide a technical approach with their quote. The solicitation number is FA4661Q0152 and the contracting agency is the Department of the Air Force Global Strike Command.

View the file

Other files

File Type Posted
Attachment 3 - JA.pdf PDF
FA466124Q0152 RFQ.docx DOCX document
Attachment 2- SOW.pdf PDF
Attachment 4 - Equipment List Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

File Path: BIM 360://17068.20001_R Plot Date: 11/19/2021 4:20:40 PM eno 317th HQ Bldg 6015 D ess AFB/8902A-3D6015.rvt

PARTIAL ISSU

FOR CONSTRUCTIO

101C

121 119 115

P1F

7'

3/

4"

7'

5"

1'

6"

1'

5'

1/

2"

/8

STC-50

8 A-532 P1

G B9

A-303

D1

A-301

E1

A-202 B7 A-303

20' - 10"

P8

2' - 0"

28' - 1 3/8"

B7

A-515

1' - 9"

E7

A-515

STAIRS

UP

S102

DYESS

AIR FORCE BASE

XP SECURE AREA

STC-50 ELEVATOR

A1

A-401 4 P8

P5 124

TEXAS

F

109 P3

ELECTICAL ROOM

14 FIRE RISER

A-403

UNISEX

E01

ELEVATOR LOBBY

A6

A-404

ALTERNATE P2

COMMAND POST

STC-50 F1

A-404

CAT/ LARGE

CONFERENCE

STC-50 4

P7 P5

MECHANICAL

D1

APPROVED

SIGNATURE OFFICE

XP VESTIBULE P10

P3 C4 STAIRS

111 11 P3

XP CHIEF

112 113

9' - 6 3/4" F.V. 4' - 0 1/16"

MEN'S P4

A-302 P7

122 123A

PPP 1 COMMUNICATIONS

123B A-302

COORDINATION

A-404 110 11 116 P1A P1 19 125 P1D P2B P2B F1 STC-50 PP11B P6 11' - 3" 10' - 11" 14' - 10" 8' - 5" 7' - 7" 8' - 4" 17' - 0 3/8" A-201

CORRIDOR P6

101A

109A P2

10' - 7 1/4" STORAGE P1F

MECHANICAL P1A

P1D

P6 P1

P1A

WING

DIRECTOR

PROTOCOL CLOSE COMBAT WAITING

ATTACK

MAIL

13 12 13 WING CHIEF

P2A MECHANICAL

3" MIN.

P1B

110 P9

P1E 22' - 8 5/8" P1E P1E 13' - 10" 4' - 10 3/4"

P1A P1A

P1 P1A

P2A

E S101B

UP

P1B P2A P2A

S101A

P1E

JAN. CORRIDOR

P1A P1A P1A 6 P1A 12' - 8"

101B

118 TYP. 119

CORRIDOR

P1 P2A P1A

P1A A7 P1E 126 CORRIDOR P2A P8

128B

VESTIBULE

G8 A-542

BOTH

P1C P1C

107 P2A 106 P2A

PPP 222

P2

105A

STORAGE FINANCIAL

100B

P1

P2A

133A

VICE WING

133B

WING EXEC.

P2

130A P2A

P1

WING

128A

SIDES AND

CEILING

HISTORIAN WAR ROOM

ANNEX

WAR ROOM P1

MANAGEMENT P1A VESTIBULE COMMANDER

133 P2

STAFF

130B

COMMANDER

130 NETWORK HUB

DESIGN FIRM:

13' - 4 3/8"

F.V.

STC-50

11' - 0 1/2"

TYP.

STC-50

25' - 5" 106A P1

4' - 0 1/2" 22' - 10"

100A

± 12' - 8" F.V.

± 21' - 0"

TYP.

30' - 0"

25' - 8" JSR ECC

LCC

110 109 108 107 106 105 104 103 102 101 MAIN ENTRY DN 123 122 121 120 119 118 117 116 115 114 D 15 001

D1 FIRST FLOOR PLAN

STORAGE 18

106A 1 F1

2 A-402 B5

A-303

Architecture

1/8" = 1'-0"

RFI NO. ROOM

0 4' 8' 16'

RFI SCHEDULE - FIRST FLOOR

D1

A-301

PLAN NOTES PLAN KEYNOTES

(RFI-00xx) NO. NAME IMPACT (REFER TO RFI NOTES) DESIGNER: PROJ. MANAGER:

36 000 16, 18, 47 101

16, 47 101A

EXTERIOR

CORRIDOR

CORRIDOR

DEMOLITION AND REMOVAL OF EXISTING MASONRY SCREEN WALL

LVT FLOORING, NEW STC RATINGS (WALLS), SPACE PARTITIONED (101B)

LVT FLOORING, NEW STC RATINGS (WALLS), REDUCED SIZE (109A)

1. ALL DIMENSIONS ARE TO FACE OF STUD/ FACE OF CMU FOR

BOTH EXISTING AS WELL AS NEW CONSTRUCTION.

12. PRIOR TO ENCLOSURE OF THE XP SECURE AREA, THE

ROOMS DIRECTLY ADJACENT WILL BE CORDONED AND

MONITORED TO PREVENT PERSONAL ELECTRONIC DEVICES

1 EXISTING ABA COMPLIANT ACCESSIBLE RAMP TO REMAIN

2 NEW GUARD/HANDRAIL

G. WALTON

DRAWN BY:

G. GARTEISER

DATE:

16, 47 101B C

CORRIDOR LVT FLOORING, NEW STC RATINGS (WALLS), PARTITIONED SPACE (101), NEW DOOR AND SIDELIGHT, DOUBLE DOORS AND EXPANDED GLAZING SYSTEM

2. ALL DIMENSIONS OF EXISTING CONSTRUCTION ARE TO

PROVIDE CONTRACTOR WITH APPROXIMATE SIZES AND ARE

NOT INTENDED TO BE USED FOR CONSTRUCTION

IN/ AROUND THE XP SECURE AREA. AFTER ENCLOSURE OF

THE XP SECURE AREA, THE DOOR AND WALLS WILL SERVE

AS THE CORRIDOR FOR THE AREA ITSELF.

3 NOT USED ON THIS SHEET

4 NEW RAISED ACCESS FLOOR

D. VERSTEEG NOV. 24, 2021

47 101C CORRIDOR NEW STC RATINGS (WALLS), WALL RECONFIGRATION (131), DOOR SHIFT (126) PURPOSES. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY 5 SECURE AREA BOUNDARY, CONSTRUCTION SHALL MEET 16 103 47 105

18, 47 105A 18, 47 106 18, 47 106A 18, 47 107 18, 47 108

ELEVATOR LOBBY

FINANCIAL MANAGEMENT

STORAGE

WAR ROOM

STORAGE

HISTORIAN

WAR ROOM ANNEX

LVT FLOORING

WALL SHIFT

REDUCED SIZE, DOOR LOCATION AND SWING, NEW STC RATING (WALL), NEW STC CEILING, WALL SHIFTS

NEW STC RATING (WALLS), NEW STC CEILING, WALL SHIFTS

REDUCED SIZE, DOOR LOCATION AND SWING, NEW STC RATING (WALL), NEW STC CEILING, WALL SHIFTS

NEW STC RATING (WALL), NEW STC CEILING, WALL SHIFT

NEW ROOM, NEW STC WALL, NEW DOOR, NEW STC RATINGS (WALLS), NEW STC CEILING

CONTRACTOR PRIOR TO THE START OF CONSTRUCTION.

3. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES

WHERE EQUIPMENT, FLOORING, CURBS AND ANY OTHER

RELATED ITEMS HAVE BEEN INDICATED TO BE DEMOLISHED.

4. ALL GWB OUTSIDE CORNERS SHALL RECEIVE METAL

CORNER BEADS.

13. ONCE ENCLOSED, THE XP SECURE AREA WILL BE

CONTROLLED AND MONITORED BY AN SCI INDOCTRINATED

PERSON. THIS PERSON MAY BE PROVIDED BY THE

CONTRACTOR OR THE 317 AW.

14. CONTRACTOR SHALL BE KNOWLEDGEABLE ABOUT ALL

REQUIREMENTS TO HIM AND ALL SUBCONTRACTORS PER

THE ICD/ICS 705.

ICD/ICS 705 REQUIREMENTS.

6 NEW DUAL / ACCESSIBLE DRINKING FOUNTAINS

7 BUILDING DIRECTORY/ DISPLAY CASES, GFGI

8 SHEATH EXISTING FRAMING WITH NEW GWB, TYPICAL (RE:

PARTITION TYPES). EXISTING WOOD STUDS TO REMAIN.

REPLACE WHERE DAMAGED OR ADD IF NOT 16" O.C.

47 109 16, 47 109A

47 110 47 116 47 117 47 118

16, 47 121

XP SECURE AREA

XP VESTIBULE

XP CHIEF

MEN'S

UNISEX

WING DIRECTOR

WAITING

WALLS REMOVED (STORAGE)

NEW ROOM, LVT FLOORING, NEW DOOR

NEW STC RATING (WALLS), DOOR LOCATION AND SWING

REDISTRIBUTION OF PLUMBING FIXTURES, SPACE RECONFIGURATION

ROOM NAME CHANGE, REDISTRIBUTION OF PLUMBING FIXTURES, SPACE RECONFIGURATION

DOOR LOCATION AND SWING

ROOM NAME CHANGE, LVT FLOORING, WALL, DOOR AND GLAZING SYSTEM REMOVED

5. ALL OUTSIDE CORNERS IN PUBLIC AREAS SHALL HAVE

CORNER GUARDS APPLIED TO THEM. (RE: INTERIOR DESIGN)

6. CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING /

ANCHORAGE FOR ALL WALL-MOUNTED EQUIPMENT AND / OR

ACCESSORIES; EQUIPMENT TO INCLUDE, BUT NOT LIMITED

TO, WALL MOUNTED ELECTRIC DRINKING FOUNTAINS AND

TOILET ACCESSORIES. REFERENCE ENLARGED PLANS AND

PLAN LEGEND

= NEW WALL FINISHES ON EXISTING WOOD STUD WALLS

TO REMAIN (RE: PARTITION TYPES)

= NEW WALL FINISHES ON NEW STUD WALLS

9 FURR OUT EXTERIOR WALL WITH GWB ON 2 1/2" METAL

STUD, TYPICAL

10 FURR OUT EXTERIOR WALL WITH GWB ON HAT CHANNEL IN

SECURE AREA.

11 CMU WALLS IN THIS ROOM NOT TO RECEIVE ANY FURR

OUTS

12 INSTALL 8' HIGH FIRE RATED 3/4" PLYWOOD ON ALL WALLS

(RE: T-001)

B 47 122 ALTERNATE COMMAND POST WALL SHIFT (REDUCED SIZE), NEW CASEWORK AND SINK INTERIOR ELEVATIONS FOR ADDITIONAL MOUNTING (RE: PARTITION TYPES) 13 PROVIDE METAL CLADDING TO SHROUD THE EXISTING 24, 47 123 18, 47 126 18, 47 130

16, 19, 47 131 18, 47 132

18 133

RFI NOTES:

CAT/ LARGE CONFERENCE

WING CHIEF

WING COMMANDER

MAIL

WING EXEC. STAFF

VICE WING COMMANDER

EXTERIOR CONCRETE STOOP, WALL SHIFT (INCREASED SIZE), DOOR LOCATION AND SWING

NEW STC RATINGS (WALLS), WALLS REMOVED (STORAGE)

NEW DOOR, NEW STC RATING (CEILING)

LVT FLOORING, ORIENTATION, CONFIGURATION, REDUCED SIZE

NEW STC CEILING (PARTIAL), DOUBLE DOORS AND EXPANDED GLAZING SYSTEM

NEW STC RATING (CEILING)

5. ALL ARCHITECTURAL DEVIATIONS FROM THE ORIGINAL RFP SOW

LOCATIONS AND HEIGHTS.

7. COORDINATE MOUNTING LOCATIONS OF ALL WALL-

MOUNTED DEVICES AND / OR EQUIPMENT TO ELIMINATE

CONFLICTS.

8. REFERENCE LIFE SAFETY PLAN FOR FIRE RATED PARTITION

LOCATIONS.

STC-50 = PER THE RFP AND APPROVED CHANGES PER RFI #0018,

ROOMS WITH STC-50 DESIGNATION HAVE BEEN

IDENTIFIED AS ROOMS REQUIRING INCREASED SOUND

SEPARATION FROM ADJACENT SPACES.

REFER TO WALL TYPES AND OTHER DETAILS FOR

CONSTRUCTION.

METAL COLUMN. MATCH EXISTING

14 NEW CONCRETE PAD (RE: CIVIL)

15 FIREMAN'S ACCESS BOX

16 NEW METAL STAIRS

17 INFILL OPENINGS USING MATCHING MATERIALS AND

FINISHES.

18 NEW DOWNSPOUT

SHEET TITLE:

FIRST FLOOR PLAN

1. "NEW" REFERS TO ITEMS, REQUIREMENTS, CONSTRUCTION, THAT

WERE NOT A PART OF THE ORIGINAL RFP STATEMENT OF WORK.

2. ITEMS NOTED ABOVE AND NOT IDENTIFIED AS "NEW" REFER TO

CHANGES TO ITEMS, REQUIREMENTS, CONSTRUCTION AS A PART

HAVE BEEN NOTED WHETHER OR NOT THE CHANGES ARE A

COST IMPACT.

6. SEE ORIGINAL RESPECTIVE RFI SUBMITTED BY JSR AND SIGNED

BY THE CONTRACTING OFFICER FOR ADDITIONAL DETAIL.

9. CMU WALLS IN MECHANICAL/ EQUIPMENT ROOMS SHALL NOT

RECEIVE ANY FUR OUTS.

10. DEMISING WALL BETWEEN WING COMMANDER ROOM 130

AND NETWORK HUB 129 IS A (FORMERLY EXTERIOR) 12" CMU

REFER TO THE REFLECTED CEILING PLANS FOR

ADDITIONAL FLOOR AND CEILING SEPARATION

LOCATIONS.

= DASHED X IN BATH ROOMS AND MECHANICAL SPACES

INCIDATES NEW FLOOR FRAMING

19 OVERHEAD ROLLING FIRE-RATED DOOR (RE: A-401 AND SHEET :

A-517)

PROJECT TITLE:

OF :

OF THE ORIGINAL RFP STATEMENT OF WORK.

3. NOTE NEW STC RATINGS APPLY TO ONE OR MORE WALLS PER

A DESCRIPTION AND AS NOTED.

4. WALLS AND DOORS SEPARATING SPACES ARE NOTED AS A

CHANGE FOR EACH SPACE, HOWEVER THE SAME CHANGE WILL

BE NOTED FOR THE ADJACENT SPACE AS WELL.

7. REFERENCE TO SPECIFIC CIVIL, STRUCTURAL, MEP, FIRE

PROTECTION AND DATA RFI HAVE NOT BEEN INCLUDED IN THE

SCHEDULE.

8. SPECIFIC DOORS THAT HAVE BEEN ELIMINATED FROM THE

SCOPE OF WORK DUE TO THE RFIs INCLUDE: 104A STORAGE, 108A EXTERIOR VESTIBULE, 109A STORAGE, 109B STORAGE, 121

PREFUNCTION ROOM (WAITING ROOM), 126A CLOSET, 132 WING

WALL TO BE FURRED OUT USING GWB ON 2 1/2" METAL

FRAMING. PATCH AND REPAIR ANY EXISTING AND NEW

HOLES TO ACHIEVE STC 50 MINIMUM RATING.

11. PERSONAL ELECTRONIC DEVICES ARE NOT ALLOWED IN THE

XP SECURE AREA; THESE INCLUDE, BUT ARE NOT LIMITED

TO, CELL PHONES, CAMERAS, FITNESS WATCHES, TABLETS,

PORTABLE MUSIC DEVICES, ETC.

(RE: A-511 AND STRUCTURAL DRAWINGS)

= DASHED X IN ELEVATOR

LOBBY INDICATES NEW

FLOOR FRAMING (RE;

STRUCTURAL)

11-24-2021

RENOVATION FOR 317TH

HQ, BUILDING 6015

110 2ND AVENUE

PROJECT NUMBER:

FNWZ 18-0006

STAFF AND 213 MAINTENANCE STORAGE.

KEY PLAN

DRAWING NUMBER:

A-101

SSEEQQUE.ENNOCE.E

File Path BIM 360://17068.20001_Reno 317th HQ Bldg 6015 Dyess AFB/8902A 3D6015.rvt Plot Date 11/19/202 4:20:40 PM

1 2 3 4 5 6 7 8 9 10

S02

109A

P1

P2A

129 100 132 105 107 105A

128 101B 114

F

120 118 111

S01

19' - 4 3/4"

4'

6'

/4

CL

EA

R

/8

7'

8'

RE

F.

4'

0"

/8

2'

0"

PL

AN

N O

RT

H

N O

D

AT

E

DE

SC

RI

PT

IO

N

PARTIAL ISSUE FOR CONSTRUCTION

G
STAIRS
AIR FORCE BASE
XP SECURE AREA
ELEVATOR
TEXAS
F
ELECTICAL ROOM
UNISEX
ELEVATOR LOBBY
COMMAND POST
CAT/ LARGE CONFERENCE
MECHANICAL
XP VESTIBULE P10
STAIRS
XP CHIEF
MEN'S P4
P1 COMMUNICATIONS
E
JAN. CORRIDOR
VESTIBULE
STORAGE FINANCIAL
VICE WING
WING EXEC.
WING
HISTORIAN
VESTIBULE
STAFF
COMMANDER
RFI SCHEDULE - FIRST FLOOR
PLAN NOTES PLAN KEYNOTES
C
PLAN LEGEND
FIRST FLOOR PLAN
1
34
RENOVATION FOR 317TH HQ, BUILDING 6015
FNWZ 18-0006
A-101