Attachment 5- Floor Plan.pdf
PDF 714 KB Posted
- Attached to
- 317 AW Vindicator Alarm System for Bldg. 6015
- Solicitation number
- FA4661Q0152
About this file
This document contains a detailed floor plan for a renovation project at the 317th Headquarters Building 6015 on Dyess Air Force Base. The floor plan includes notes on changes to room configurations, wall and ceiling construction, flooring, and other architectural details.
The related federal contract opportunity is for the installation of a Vindicator intrusion detection system in Room 109 of Building 6015. The 317th Air Wing is requesting the removal of the existing alarm system and installation of the new Vindicator system to secure classified information in the restricted access area. Contractors are asked to provide a technical approach with their quote. The solicitation number is FA4661Q0152 and the contracting agency is the Department of the Air Force Global Strike Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - JA.pdf | ||
| FA466124Q0152 RFQ.docx | DOCX document | |
| Attachment 2- SOW.pdf | ||
| Attachment 4 - Equipment List Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
File Path: BIM 360://17068.20001_R Plot Date: 11/19/2021 4:20:40 PM eno 317th HQ Bldg 6015 D ess AFB/8902A-3D6015.rvt
PARTIAL ISSU
FOR CONSTRUCTIO
101C
121 119 115
P1F
7'
3/
4"
7'
5"
1'
6"
1'
5'
1/
2"
/8
STC-50
8 A-532 P1
G B9
A-303
D1
A-301
E1
A-202 B7 A-303
20' - 10"
P8
2' - 0"
28' - 1 3/8"
B7
A-515
1' - 9"
E7
A-515
STAIRS
UP
S102
DYESS
AIR FORCE BASE
XP SECURE AREA
STC-50 ELEVATOR
A1
A-401 4 P8
P5 124
TEXAS
F
109 P3
ELECTICAL ROOM
14 FIRE RISER
A-403
UNISEX
E01
ELEVATOR LOBBY
A6
A-404
ALTERNATE P2
COMMAND POST
STC-50 F1
A-404
CAT/ LARGE
CONFERENCE
STC-50 4
P7 P5
MECHANICAL
D1
APPROVED
SIGNATURE OFFICE
XP VESTIBULE P10
P3 C4 STAIRS
111 11 P3
XP CHIEF
112 113
9' - 6 3/4" F.V. 4' - 0 1/16"
MEN'S P4
A-302 P7
122 123A
PPP 1 COMMUNICATIONS
123B A-302
COORDINATION
A-404 110 11 116 P1A P1 19 125 P1D P2B P2B F1 STC-50 PP11B P6 11' - 3" 10' - 11" 14' - 10" 8' - 5" 7' - 7" 8' - 4" 17' - 0 3/8" A-201
CORRIDOR P6
101A
109A P2
10' - 7 1/4" STORAGE P1F
MECHANICAL P1A
P1D
P6 P1
P1A
WING
DIRECTOR
PROTOCOL CLOSE COMBAT WAITING
ATTACK
13 12 13 WING CHIEF
P2A MECHANICAL
3" MIN.
P1B
110 P9
P1E 22' - 8 5/8" P1E P1E 13' - 10" 4' - 10 3/4"
P1A P1A
P1 P1A
P2A
E S101B
UP
P1B P2A P2A
S101A
P1E
JAN. CORRIDOR
P1A P1A P1A 6 P1A 12' - 8"
101B
118 TYP. 119
CORRIDOR
P1 P2A P1A
P1A A7 P1E 126 CORRIDOR P2A P8
128B
VESTIBULE
G8 A-542
BOTH
P1C P1C
107 P2A 106 P2A
PPP 222
P2
105A
STORAGE FINANCIAL
100B
P1
P2A
133A
VICE WING
133B
WING EXEC.
P2
130A P2A
P1
WING
128A
SIDES AND
CEILING
HISTORIAN WAR ROOM
ANNEX
WAR ROOM P1
MANAGEMENT P1A VESTIBULE COMMANDER
133 P2
STAFF
130B
COMMANDER
130 NETWORK HUB
DESIGN FIRM:
13' - 4 3/8"
F.V.
STC-50
11' - 0 1/2"
TYP.
STC-50
25' - 5" 106A P1
4' - 0 1/2" 22' - 10"
100A
± 12' - 8" F.V.
± 21' - 0"
TYP.
30' - 0"
25' - 8" JSR ECC
LCC
110 109 108 107 106 105 104 103 102 101 MAIN ENTRY DN 123 122 121 120 119 118 117 116 115 114 D 15 001
D1 FIRST FLOOR PLAN
STORAGE 18
106A 1 F1
2 A-402 B5
A-303
Architecture
1/8" = 1'-0"
RFI NO. ROOM
0 4' 8' 16'
RFI SCHEDULE - FIRST FLOOR
D1
A-301
PLAN NOTES PLAN KEYNOTES
(RFI-00xx) NO. NAME IMPACT (REFER TO RFI NOTES) DESIGNER: PROJ. MANAGER:
36 000 16, 18, 47 101
16, 47 101A
EXTERIOR
CORRIDOR
CORRIDOR
DEMOLITION AND REMOVAL OF EXISTING MASONRY SCREEN WALL
LVT FLOORING, NEW STC RATINGS (WALLS), SPACE PARTITIONED (101B)
LVT FLOORING, NEW STC RATINGS (WALLS), REDUCED SIZE (109A)
1. ALL DIMENSIONS ARE TO FACE OF STUD/ FACE OF CMU FOR
BOTH EXISTING AS WELL AS NEW CONSTRUCTION.
12. PRIOR TO ENCLOSURE OF THE XP SECURE AREA, THE
ROOMS DIRECTLY ADJACENT WILL BE CORDONED AND
MONITORED TO PREVENT PERSONAL ELECTRONIC DEVICES
1 EXISTING ABA COMPLIANT ACCESSIBLE RAMP TO REMAIN
2 NEW GUARD/HANDRAIL
G. WALTON
DRAWN BY:
G. GARTEISER
DATE:
16, 47 101B C
CORRIDOR LVT FLOORING, NEW STC RATINGS (WALLS), PARTITIONED SPACE (101), NEW DOOR AND SIDELIGHT, DOUBLE DOORS AND EXPANDED GLAZING SYSTEM
2. ALL DIMENSIONS OF EXISTING CONSTRUCTION ARE TO
PROVIDE CONTRACTOR WITH APPROXIMATE SIZES AND ARE
NOT INTENDED TO BE USED FOR CONSTRUCTION
IN/ AROUND THE XP SECURE AREA. AFTER ENCLOSURE OF
THE XP SECURE AREA, THE DOOR AND WALLS WILL SERVE
AS THE CORRIDOR FOR THE AREA ITSELF.
3 NOT USED ON THIS SHEET
4 NEW RAISED ACCESS FLOOR
D. VERSTEEG NOV. 24, 2021
47 101C CORRIDOR NEW STC RATINGS (WALLS), WALL RECONFIGRATION (131), DOOR SHIFT (126) PURPOSES. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY 5 SECURE AREA BOUNDARY, CONSTRUCTION SHALL MEET 16 103 47 105
18, 47 105A 18, 47 106 18, 47 106A 18, 47 107 18, 47 108
ELEVATOR LOBBY
FINANCIAL MANAGEMENT
STORAGE
WAR ROOM
STORAGE
HISTORIAN
WAR ROOM ANNEX
LVT FLOORING
WALL SHIFT
REDUCED SIZE, DOOR LOCATION AND SWING, NEW STC RATING (WALL), NEW STC CEILING, WALL SHIFTS
NEW STC RATING (WALLS), NEW STC CEILING, WALL SHIFTS
REDUCED SIZE, DOOR LOCATION AND SWING, NEW STC RATING (WALL), NEW STC CEILING, WALL SHIFTS
NEW STC RATING (WALL), NEW STC CEILING, WALL SHIFT
NEW ROOM, NEW STC WALL, NEW DOOR, NEW STC RATINGS (WALLS), NEW STC CEILING
CONTRACTOR PRIOR TO THE START OF CONSTRUCTION.
3. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES
WHERE EQUIPMENT, FLOORING, CURBS AND ANY OTHER
RELATED ITEMS HAVE BEEN INDICATED TO BE DEMOLISHED.
4. ALL GWB OUTSIDE CORNERS SHALL RECEIVE METAL
CORNER BEADS.
13. ONCE ENCLOSED, THE XP SECURE AREA WILL BE
CONTROLLED AND MONITORED BY AN SCI INDOCTRINATED
PERSON. THIS PERSON MAY BE PROVIDED BY THE
CONTRACTOR OR THE 317 AW.
14. CONTRACTOR SHALL BE KNOWLEDGEABLE ABOUT ALL
REQUIREMENTS TO HIM AND ALL SUBCONTRACTORS PER
THE ICD/ICS 705.
ICD/ICS 705 REQUIREMENTS.
6 NEW DUAL / ACCESSIBLE DRINKING FOUNTAINS
7 BUILDING DIRECTORY/ DISPLAY CASES, GFGI
8 SHEATH EXISTING FRAMING WITH NEW GWB, TYPICAL (RE:
PARTITION TYPES). EXISTING WOOD STUDS TO REMAIN.
REPLACE WHERE DAMAGED OR ADD IF NOT 16" O.C.
47 109 16, 47 109A
47 110 47 116 47 117 47 118
16, 47 121
XP SECURE AREA
XP VESTIBULE
XP CHIEF
MEN'S
UNISEX
WING DIRECTOR
WAITING
WALLS REMOVED (STORAGE)
NEW ROOM, LVT FLOORING, NEW DOOR
NEW STC RATING (WALLS), DOOR LOCATION AND SWING
REDISTRIBUTION OF PLUMBING FIXTURES, SPACE RECONFIGURATION
ROOM NAME CHANGE, REDISTRIBUTION OF PLUMBING FIXTURES, SPACE RECONFIGURATION
DOOR LOCATION AND SWING
ROOM NAME CHANGE, LVT FLOORING, WALL, DOOR AND GLAZING SYSTEM REMOVED
5. ALL OUTSIDE CORNERS IN PUBLIC AREAS SHALL HAVE
CORNER GUARDS APPLIED TO THEM. (RE: INTERIOR DESIGN)
6. CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING /
ANCHORAGE FOR ALL WALL-MOUNTED EQUIPMENT AND / OR
ACCESSORIES; EQUIPMENT TO INCLUDE, BUT NOT LIMITED
TO, WALL MOUNTED ELECTRIC DRINKING FOUNTAINS AND
TOILET ACCESSORIES. REFERENCE ENLARGED PLANS AND
PLAN LEGEND
= NEW WALL FINISHES ON EXISTING WOOD STUD WALLS
TO REMAIN (RE: PARTITION TYPES)
= NEW WALL FINISHES ON NEW STUD WALLS
9 FURR OUT EXTERIOR WALL WITH GWB ON 2 1/2" METAL
STUD, TYPICAL
10 FURR OUT EXTERIOR WALL WITH GWB ON HAT CHANNEL IN
SECURE AREA.
11 CMU WALLS IN THIS ROOM NOT TO RECEIVE ANY FURR
OUTS
12 INSTALL 8' HIGH FIRE RATED 3/4" PLYWOOD ON ALL WALLS
(RE: T-001)
B 47 122 ALTERNATE COMMAND POST WALL SHIFT (REDUCED SIZE), NEW CASEWORK AND SINK INTERIOR ELEVATIONS FOR ADDITIONAL MOUNTING (RE: PARTITION TYPES) 13 PROVIDE METAL CLADDING TO SHROUD THE EXISTING 24, 47 123 18, 47 126 18, 47 130
16, 19, 47 131 18, 47 132
18 133
RFI NOTES:
CAT/ LARGE CONFERENCE
WING CHIEF
WING COMMANDER
WING EXEC. STAFF
VICE WING COMMANDER
EXTERIOR CONCRETE STOOP, WALL SHIFT (INCREASED SIZE), DOOR LOCATION AND SWING
NEW STC RATINGS (WALLS), WALLS REMOVED (STORAGE)
NEW DOOR, NEW STC RATING (CEILING)
LVT FLOORING, ORIENTATION, CONFIGURATION, REDUCED SIZE
NEW STC CEILING (PARTIAL), DOUBLE DOORS AND EXPANDED GLAZING SYSTEM
NEW STC RATING (CEILING)
5. ALL ARCHITECTURAL DEVIATIONS FROM THE ORIGINAL RFP SOW
LOCATIONS AND HEIGHTS.
7. COORDINATE MOUNTING LOCATIONS OF ALL WALL-
MOUNTED DEVICES AND / OR EQUIPMENT TO ELIMINATE
CONFLICTS.
8. REFERENCE LIFE SAFETY PLAN FOR FIRE RATED PARTITION
LOCATIONS.
STC-50 = PER THE RFP AND APPROVED CHANGES PER RFI #0018,
ROOMS WITH STC-50 DESIGNATION HAVE BEEN
IDENTIFIED AS ROOMS REQUIRING INCREASED SOUND
SEPARATION FROM ADJACENT SPACES.
REFER TO WALL TYPES AND OTHER DETAILS FOR
CONSTRUCTION.
METAL COLUMN. MATCH EXISTING
14 NEW CONCRETE PAD (RE: CIVIL)
15 FIREMAN'S ACCESS BOX
16 NEW METAL STAIRS
17 INFILL OPENINGS USING MATCHING MATERIALS AND
FINISHES.
18 NEW DOWNSPOUT
SHEET TITLE:
FIRST FLOOR PLAN
1. "NEW" REFERS TO ITEMS, REQUIREMENTS, CONSTRUCTION, THAT
WERE NOT A PART OF THE ORIGINAL RFP STATEMENT OF WORK.
2. ITEMS NOTED ABOVE AND NOT IDENTIFIED AS "NEW" REFER TO
CHANGES TO ITEMS, REQUIREMENTS, CONSTRUCTION AS A PART
HAVE BEEN NOTED WHETHER OR NOT THE CHANGES ARE A
COST IMPACT.
6. SEE ORIGINAL RESPECTIVE RFI SUBMITTED BY JSR AND SIGNED
BY THE CONTRACTING OFFICER FOR ADDITIONAL DETAIL.
9. CMU WALLS IN MECHANICAL/ EQUIPMENT ROOMS SHALL NOT
RECEIVE ANY FUR OUTS.
10. DEMISING WALL BETWEEN WING COMMANDER ROOM 130
AND NETWORK HUB 129 IS A (FORMERLY EXTERIOR) 12" CMU
REFER TO THE REFLECTED CEILING PLANS FOR
ADDITIONAL FLOOR AND CEILING SEPARATION
LOCATIONS.
= DASHED X IN BATH ROOMS AND MECHANICAL SPACES
INCIDATES NEW FLOOR FRAMING
19 OVERHEAD ROLLING FIRE-RATED DOOR (RE: A-401 AND SHEET :
A-517)
PROJECT TITLE:
OF :
OF THE ORIGINAL RFP STATEMENT OF WORK.
3. NOTE NEW STC RATINGS APPLY TO ONE OR MORE WALLS PER
A DESCRIPTION AND AS NOTED.
4. WALLS AND DOORS SEPARATING SPACES ARE NOTED AS A
CHANGE FOR EACH SPACE, HOWEVER THE SAME CHANGE WILL
BE NOTED FOR THE ADJACENT SPACE AS WELL.
7. REFERENCE TO SPECIFIC CIVIL, STRUCTURAL, MEP, FIRE
PROTECTION AND DATA RFI HAVE NOT BEEN INCLUDED IN THE
SCHEDULE.
8. SPECIFIC DOORS THAT HAVE BEEN ELIMINATED FROM THE
SCOPE OF WORK DUE TO THE RFIs INCLUDE: 104A STORAGE, 108A EXTERIOR VESTIBULE, 109A STORAGE, 109B STORAGE, 121
PREFUNCTION ROOM (WAITING ROOM), 126A CLOSET, 132 WING
WALL TO BE FURRED OUT USING GWB ON 2 1/2" METAL
FRAMING. PATCH AND REPAIR ANY EXISTING AND NEW
HOLES TO ACHIEVE STC 50 MINIMUM RATING.
11. PERSONAL ELECTRONIC DEVICES ARE NOT ALLOWED IN THE
XP SECURE AREA; THESE INCLUDE, BUT ARE NOT LIMITED
TO, CELL PHONES, CAMERAS, FITNESS WATCHES, TABLETS,
PORTABLE MUSIC DEVICES, ETC.
(RE: A-511 AND STRUCTURAL DRAWINGS)
= DASHED X IN ELEVATOR
LOBBY INDICATES NEW
FLOOR FRAMING (RE;
STRUCTURAL)
11-24-2021
RENOVATION FOR 317TH
HQ, BUILDING 6015
110 2ND AVENUE
PROJECT NUMBER:
FNWZ 18-0006
STAFF AND 213 MAINTENANCE STORAGE.
KEY PLAN
DRAWING NUMBER:
A-101
SSEEQQUE.ENNOCE.E
File Path BIM 360://17068.20001_Reno 317th HQ Bldg 6015 Dyess AFB/8902A 3D6015.rvt Plot Date 11/19/202 4:20:40 PM
1 2 3 4 5 6 7 8 9 10
S02
109A
P1
P2A
129 100 132 105 107 105A
128 101B 114
F
120 118 111
S01
19' - 4 3/4"
4'
6'
/4
CL
EA
R
/8
7'
8'
RE
F.
4'
0"
/8
2'
0"
PL
AN
N O
RT
H
N O
D
AT
E
DE
SC
RI
PT
IO
N
PARTIAL ISSUE FOR CONSTRUCTION
| G |
| STAIRS |
| AIR FORCE BASE |
| XP SECURE AREA |
| ELEVATOR |
| TEXAS |
| F |
| ELECTICAL ROOM |
| UNISEX |
| ELEVATOR LOBBY |
| COMMAND POST |
| CAT/ LARGE CONFERENCE |
| MECHANICAL |
| XP VESTIBULE P10 |
| STAIRS |
| XP CHIEF |
| MEN'S P4 |
| P1 COMMUNICATIONS |
| E |
| JAN. CORRIDOR |
| VESTIBULE |
| STORAGE FINANCIAL |
| VICE WING |
| WING EXEC. |
| WING |
| HISTORIAN |
| VESTIBULE |
| STAFF |
| COMMANDER |
| RFI SCHEDULE - FIRST FLOOR |
| PLAN NOTES PLAN KEYNOTES |
| C |
| PLAN LEGEND |
| FIRST FLOOR PLAN |
| 1 |
| 34 |
| RENOVATION FOR 317TH HQ, BUILDING 6015 |
| FNWZ 18-0006 |
| A-101 |
File details come from the government source that posted it. Updated .