Attachment 5- Fire Plan.pdf

PDF 314 KB Posted

Attached to
Road grading. Upper Lake District MNF Federal contract opportunity
Solicitation number
127EAW24R0039
Issued by
Department of Agriculture Forest Service

About this file

This document is a Fire Plan for a federal road grading construction contract for the Mendocino National Forest. The Fire Plan outlines the responsibilities of the contractor and Forest Service regarding fire prevention, suppression, and operational restrictions based on Project Activity Levels (PALs). It specifies requirements for fire tools, equipment, extinguishers, spark arresters, and water supply. The contractor must comply with state laws and obtain permits for activities like welding and blasting. The contract requires a 300-gallon water tank truck or trailer on or near active work areas, with a high-pressure pump and hose. The PAL table details operational restrictions at different fire danger levels, ranging from minimum requirements to prohibiting certain activities after 1 PM. The associated federal contract opportunity is for road grading work in the Upper Lake Ranger District of the Mendocino National Forest, valued between $25,000 - $100,000, with the full solicitation providing additional details on the scope, bid submission, and other terms.

View the file

Other files for this federal contract opportunity

Other files attached to Road grading. Upper Lake District MNF, newest first.
File Type Posted
A00001- 127EAW24R0039 -Forest Roads Grading MNF.pdf PDF
Attachment 2- Forest Service Supplemental Specifications.pdf PDF
Attachment 3- Maps and Drawings.pdf PDF
Attachment 4- List of Roads.pdf PDF
127EAW24R0039-Road grading. Upper Lake District MNF.pdf PDF
Attachment 1- Davis-Bacon Act WD CA20240004 - Lake County.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mendocino National Forest Forest Road Grading

FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS

04/27/2024

1. SCOPE:

The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.

2. RESPONSIBILITIES:

A. Contractor

(1) Shall abide by the requirements of this Fire Plan.

(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.

(3) Shall permit and assist in periodic testing and inspection of required fire equipment.

Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.

(4) Shall designate in the Fire Plan and furnish on Contract Area, during operating hours, a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.

B. Forest Service The Forest Service may conduct one or more inspections for compliance with the Fire Plan.

The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.

3. DEFINITIONS:

The following definitions shall apply:

Active Landing: A location the contractor may be skidding logs into, or performing other operations such as delimbing, log manufacturing, and chipping logs. Except for EV and E days, loading logs or stockpiling chips only, on a cleared landing, does not constitute an Active Landing.

Hot Saw: A harvesting system that employs a high-speed (>1100 rpm) rotating felling head, i.e., full rotation lateral tilt head.

Mechanical Operations: The process of felling, skidding, chipping, shredding, masticating, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders, dozers etc.

4. TOOLS AND EQUIPMENT:

The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:

The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.

This contract requires a Fire Box and associated Fire Tools according to CPRC Section 4428.

A. Fire Tools and Equipment: Contractor shall meet minimum requirements of Section 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations.

Tractor headlights shall be attachable to each tractor and served by an adequate power source. All required fire tools shall be maintained in suitable and serviceable condition for fire fighting purposes.

Trucks, tractors, skidders, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.

Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 25 feet of each tail and corner block.

B. Fire Extinguishers: Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).

Skidders and tractors shall be equipped with a minimum 5-BC fire extinguisher.

All Fire Extinguishers shall be mounted, readily accessible, properly maintained and fully charged.

Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent.

C. Spark Arresters and Mufflers: Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the. National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition. Every motor vehicle subject to registration shall at all times be equipped with an adequate exhaust system meeting the requirements of the California Vehicle Code.

D. Power Saws: Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. An Underwriters Laboratories (UL) approved fire extinguisher containing a minimum 14 ounces of fire retardant shall be kept with each operating power saw. In addition, a size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.

• This contract requires Section 4E of the Fire Plan.

E. Tank Truck or Trailer: Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor's Operations hereunder during Fire Precautionary Period. When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing, unless otherwise excepted when Hot Saws or Masticators are being used. See Section 6 for specific contract requirements.

The tank shall contain at least 300 gallons of water available for fire suppression. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area. Tank truck or trailer shall be equipped with the following:

(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:

T e m p

Sea

Level

Feet

Feet 55 179 23 174 23 16

23 165 22 16

22 15

22 15

22 15

21 14

21 14

21 13

70 175 23 171 23 16

22 162 22 15

22 15

22 15

21 14

21 14

21 13

21 13

85 171 23 168 23 16

22 159 22 15

22 15

21 14

21 14

21 14

21 13

20 13

100 168 23 164 23 15

22 155 22 15

22 14

21 14

21 14

21 13

20 13

20 13

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread.

A bypass or pressure relief valve shall be provided for other than centrifugal pumps.

(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.

(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:

G.P.M. Horizontal Range Straight Stream 10 38 feet Fog Spray 6 - 20 N/A

(4) Sufficient fuel to run the pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.

When Contractor is using Hot Saws or Masticators, an additional 250 feet of light weight hose, approved by the Forest Service, shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above.

This equipment and accessories shall be deliverable to a fire in the area of operations and is subject to the requirements for each specific activity level identified in Section 6.

F. Compressed Air Foam System:

Section F- NOT REQUIRED

Fire extinguishers required for Hot Saws, Masticators and similar equipment identified in Section 4 B. above may be substituted with a 3-gallon CAFS.

Tank truck, trailer or equivalent may be substituted with a 30 Gallon CAFS with at least 550 feet of one-inch hose and an adjustable nozzle with enough water, air and foam concentrate for at least one recharge.

This equipment and accessories shall also be deliverable to a fire in the area of operations and subject to the requirements for each specific activity level identified in Section 6.

5. GENERAL

A. State Law: In addition to the requirements in this Fire Plan, the Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.

B. Permits Required: The Contractor must secure a special written permit from the District Ranger or designated representative before burning, welding or cutting metal or starting any warming fires. If contract requires Blasting and Storing of Explosives and Detonators, an Explosives Permit may be required pursuant to the California Health and Safety Code, Section 12101.

C. Blasting: Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a Fire Patrolperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.

D. Smoking: Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter. In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see. Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.

E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.

F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by

Contractor. Contractor's employees shall report all fires as soon as possible to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:

Name Office Address Office telephone Dispatch Center MNF ECC 825 N. Humboldt Ave

Willows, CA 95988 530 934 1156

Nearest FS Station Upper Lake , CA

10025 Elk Mountain Rd, Upper Lake, Ca 95485

707 275 2361

Inspector TBD COR Francisco Rico 10025 Elk Mountain Rd

Upper Lake, CA 95485 530 913 6931

District Ranger Frank Aebly Upper Lake 707 275 1401

When reporting a fire, provide the following information:

Your Name Call back telephone number Project Name Location: Legal description (Township, Range, Section); and Descriptive location (Reference point) Fire Information: Including Acres, Rate of Spread and Wind Conditions.

This contract requires Section 5G of the Fire Plan.

G. Communications: Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone.

This contract DOES NOT requires Section 5H of the Fire Plan.

H. Fire Patrolperson:

Section H – NOT REQUIRED

I. Clearing of Fuels: Contractor shall clear away, and keep clear, fuels and logging debris as follows:

Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law:

10 feet slope radius

6. EMERGENCY PRECAUTIONS

Contractor's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Project Activity Levels applicable to this project shall be the predicted activity levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Contract Area Map Legend on Integrated Resource Service Contracts (IRSC’s), and other contracts where applicable.

https://www.bing.com/ck/a?!&&p=4123ff934764becbJmltdHM9MTcxMzkxNjgwMCZpZ3VpZD0yZWZhNmRkMy1kZjA0LTZkMzEtMzViYy03OWJhZGUyMzZjYzEmaW5zaWQ9NTcxNg&ptn=3&ver=2&hsh=3&fclid=2efa6dd3-df04-6d31-35bc-79bade236cc1&u=a1L21hcHM_Jm1lcGk9MTI3fn5Vbmtub3dufkFkZHJlc3NfTGluayZ0eT0xOCZxPVVwcGVyJTIwTGFrZSUyMFJhbmdlciUyMERpc3RyaWN0JnNzPXlwaWQuWU44NzN4MTA4NzE2NTAxJnBwb2lzPTM5LjE3MjE0OTY1ODIwMzEyNV8tMTIyLjkwNjEwNTA0MTUwMzlfVXBwZXIlMjBMYWtlJTIwUmFuZ2VyJTIwRGlzdHJpY3RfWU44NzN4MTA4NzE2NTAxfiZjcD0zOS4xNzIxNX4tMTIyLjkwNjEwNSZ2PTImc1Y9MSZGT1JNPU1QU1JQTA&ntb=1 https://www.bing.com/ck/a?!&&p=4123ff934764becbJmltdHM9MTcxMzkxNjgwMCZpZ3VpZD0yZWZhNmRkMy1kZjA0LTZkMzEtMzViYy03OWJhZGUyMzZjYzEmaW5zaWQ9NTcxNg&ptn=3&ver=2&hsh=3&fclid=2efa6dd3-df04-6d31-35bc-79bade236cc1&u=a1L21hcHM_Jm1lcGk9MTI3fn5Vbmtub3dufkFkZHJlc3NfTGluayZ0eT0xOCZxPVVwcGVyJTIwTGFrZSUyMFJhbmdlciUyMERpc3RyaWN0JnNzPXlwaWQuWU44NzN4MTA4NzE2NTAxJnBwb2lzPTM5LjE3MjE0OTY1ODIwMzEyNV8tMTIyLjkwNjEwNTA0MTUwMzlfVXBwZXIlMjBMYWtlJTIwUmFuZ2VyJTIwRGlzdHJpY3RfWU44NzN4MTA4NzE2NTAxfiZjcD0zOS4xNzIxNX4tMTIyLjkwNjEwNSZ2PTImc1Y9MSZGT1JNPU1QU1JQTA&ntb=1

Fire Danger Rating Area/Fire Weather Station for Project

Mendocino Area 170

The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM.

Contractor shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day.

Phone Number or Website to obtain Predicted Activity Levels:

530.934.1240

Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Contractor is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below.

PROJECT ACTIVITY LEVEL

Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.

A Minimum requirements noted above in Sections 4 and 5.

B 1. Tank truck, trailer, or approved CAFS substitute shall be on or adjacent to the Active Landing.

C 1. When Hot Saws or Masticators are operating, a tank truck, trailer, or approved CAFS substitute shall be within ¼ mile of these operations. Effective communications shall exist between the operator and the Active Landing.

2. Immediately after Mechanical Operations cease, Fire patrol is required for two hours.

D 1. Immediately after Hot Saw or Masticator operations cease, Fire patrol is required for three hours.

2. No Dead Tree felling after 1:00 PM, except recently dead.

3 No burning, blasting, welding or cutting of metal after 1:00 PM, except by special permit.

Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.

Ev 1. The following activities may operate all day:

a) Loading and hauling logs decked at approved landings.

b) Loading and hauling chips stockpiled at approved landings.

c) Servicing equipment at approved sites.

d) Dust abatement, road maintenance (Chainsaw use prohibited), culvert installation within cleared area, chip sealing, paving, earth moving or rock aggregate stock pile loading and installation (does not include pit or quarry development).

e) Chainsaw and log processing operations associated with loading logs or other forest products at approved landings.

2. Hot Saws or Masticators may operate until 1:00 PM; provided that:

a) A tractor with a blade or other equipment capable of constructing fireline is on or adjacent to the active landing or within ¼ mile of the operating equipment. This piece of equipment shall have effective communication with the Hot Saw or Masticator.

b) Any additional restrictions specified by the Forest.

3. All other conventional Mechanical Operations are permitted until 1:00 PM.

4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement. Activities for which a Variance may be issued are:

• Rubber Tire Skidding

• Chipping on Landings

• Helicopter Yarding

• Fire Salvage

When approved by a Line Officer, a Variance Agreement can be implemented when the criteria specified in the agreement are met and mitigation measures are in place. This approval is good for ten (10) days unless cancelled sooner or extended by the Contracting Officer for an additional ten (10) days. Variance approval can be withdrawn at the sole discretion of the Forest Service.

Variance approval is contingent on the 7-day fire weather forecast, fuel conditions, site characteristics, current fire situation, state of Contractor’s equipment for prevention and suppression readiness, type of operation and social and community considerations etc. (See attached Project Activity Level Variance Agreement).

E The following activities may operate all day:

1. Loading and hauling logs decked at approved landings.

2. Loading and hauling chips stockpiled at approved landings.

3. Servicing Equipment at approved sites.

4. Dust abatement, road maintenance (chainsaw use prohibited) or loading stock piles and rock aggregate installation (does not include pit or quarry development).

5. Chainsaw operation associated with loading at approved landings.

All other activities are prohibited.

This Project utilizes “The Project Activity Level” (PAL), an industrial operation’s fire precaution system. The following Climatology Chart indicates the Historic Activity Levels for the Project Fire Danger Rating Area or Fire Weather Station utilized on this Project. This is only a historical average of the Activity Levels for the identified Fire Danger Rating Area or Weather Station.

A B C D Ev E Days Month Analyzed

April 17.3 3.0 4.0 5.8 0.0 0.0 120 30 May 18.5 1.5 4.1 3.8 3.0 0.0 122 31 June 4.3 6.1 7.8 2.5 9.1 0.3 119 30 July 0.0 1.3 5.5 12.5 11.5 0.3 124 31 August 0.3 1.3 4.3 6.0 17.9 1.3 123 31 September 0.8 2.3 7.3 6.0 13.5 0.3 120 30 October 4.8 5.0 10.8 5.0 5.5 0.0 124 31 November 19.8 7.3 2.8 0.3 0.0 0.0 120 30

Project Activity Level Climatology

Expected Days per Month at each PAL Value

Station/SIG/Unit: PNF CENTRAL ZONE Years Analyzed 2014-2017

A. Contractor
B. Forest Service
The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do no...
The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:
The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.
E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or ...
F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor. Contractor's employees shall report all fires as so...