Attachment 5 Details.pdf

PDF 828 KB Posted

Attached to
Alabama Road Maintenance Contract Federal contract opportunity
Solicitation number
12445221R0037
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Alabama Road Maintenance Contract, newest first.
File Type Posted
SF 33_RFP_12445221R0037.pdf PDF
J1 NFs in Al_SOI UPDATE.xlsx XLSX spreadsheet
J1 -(b) FY 2021 ROAD MTC WORK ITEMS_Talladega.pdf PDF
Wage Determinations J4 -(a) Tall.pdf PDF
J4 -(b) Wage Determinations Bank.pdf PDF
Map (Alabama Forests).pdf PDF
J3 SOW_JH.pdf PDF
J4 -(c) Wage Determinations Conecuh.pdf PDF
J5 PPQ.doc DOC document
J6 Construction Experience Form.docx DOCX document
CROWN TYPICAL.pdf PDF
J1 -(a) FY 2021 ROAD MTC WORK ITEMS_BKRD.pdf PDF
J1 -(c)FY 2021 ROAD MTC WORK ITEMS_conecuh.pdf PDF
J1 -(d)FY 2021 ROAD MTC WORK ITEMS_Shoal Creek.pdf PDF
J1 -(e)Oakmulgee RD FY 2021 Road Maintenance Work Items_fall.pdf PDF
J4 -(d) Wage Determinations Shoal.pdf PDF
J4 -(e) Wage Determinations Oakmulgee.pdf PDF
SF 33_RFP_12445221R0037.pdf PDF
J2 Specifications.pdf PDF
CLEARING 14 HEIGHT AND LOD.pdf PDF
Copy of CULVERT OR BRIDGE HEAVY BRUSHING.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A tta ch m en t 5

R oa d M ai nt en an ce D et ai ls ch m en t 5

R oa d M ai nt en an ce D et ai ch m en t 5

R oa d M ai nt en an ce D et ai ch m en t 5

R oa d M ai nt en an ce D et ai

Right - of - Way Roadside Roadside

Clearing Width Roadway

Clearing Limit X Y

Ground Line

Traveled Way

CL Berm Surface Course

Base Course

Fill Slope

Back Slope

Drainage Ditch

Ground Line

Subgrade

Road Bed

Shapes and dimensions will vary to fit local conditions.

See drawings for typical sections.

X and Y denote clearing outside of roadway.

Note:

R ig ht of

W ay

L in e

R ig ht of

W ay

L in e

C le ar in g Li m it

S ho ul de r

S ho ul de r ttachm ent 5 R oad M aintenance D etails

Road Mtce DW 2G
Road MtceTypicals Culvert Install Details (1).pdf
Road MtceTypicals Inlet Outlet Prot Details (1)
Rd Mtce Ducknest inlet
Road MtceTypicals Drainage Details (1)

roadtemplate

File details come from the government source that posted it. Updated .